132
Fri Aug 19 16:31:11 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
In preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
131
Fri Aug 19 16:03:40 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
closing series
130
Fri Aug 19 16:03:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
closing series
129
Fri Aug 19 16:02:33 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Closing series
128
Fri Aug 12 17:48:28 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
this afternoon, with Fabian, we did some
measurements on the 3rd stage.
finally we
127
Fri Aug 12 11:46:17 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
OEwaves lock and Finesse measurement
this morning, I locked the FP cavity with
the OEwaves CW laser and the "Fred fiber
amplifier" used at 500mA of pump current.
126
Thu Aug 11 19:27:09 2022
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Koheras CW laser lock on FP cavity
I locked the Koheras CW on the FP cavity
but the lock was pretty noisy and very difficult
to acquire.
125
Thu Aug 11 12:11:48 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage.
124
Wed Aug 10 12:51:16 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
123
Mon Aug 8 17:58:32 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Pulse duration measurement before and after CVBG (as a strecher)
I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the
122
Mon Aug 8 11:11:28 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
today, temperature of the chiller has been
set to 23°C.
measured temperature in the chiller
121
Thu Jul 28 13:52:23 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
The chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC.
120
Fri Jul 22 18:25:31 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
The software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.
119
Fri Jul 22 18:19:13 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
7x
118
Fri Jul 22 18:00:21 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
The current setup of the optical table
attached.
The cavity is aligned and the lock
117
Fri Jul 22 17:10:06 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
The D-shaped mirrors are installed properly
and not cutting the path of the beam.
The cavity has been aligned again
116
Fri Jul 22 17:07:32 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Amplifier placed next to the pulsed laser
on the table under the airflow
The output is in free space with
115
Tue Jul 12 19:07:50 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation
The amplifier was installed on the optical
table next to SBox table.
The CVBG that will be used for
114
Tue Jul 12 18:53:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
To prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
113
Tue Jul 12 14:41:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
a Finesse of 30k with the present mirrors
:
T1=120 ppm ;A1=(2.6+1) ppm;