HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 11 of 13  Not logged in ELOG logo
Entry   Cavity beam axis moving with power, posted by Ronic Chiche at Optical room about lasers and optics 9x
how the cavity beam axis is moving during a lock when the cavity is hot ?
could it explain a part of the Transmission / Coupling signal decay ?

we placed 2 Basler camera, one at (30+Z) cm and the other at (85+Z) cm (Z is about 15cm) from the M3 mirror, we recorded the video during a lock
Entry   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software Screenshot_2022-05-30_0_125247.png20220530_00_Mode.bmp11.bmp
Start with the cavity lock images attached, taken from last week, at start we have a coupling ~ 5%  and started improving on the
alignment .

The image of 00 modes attached corresponds to the coupling seen on the oscilloscope.
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 20220607_SBox_Setup.pngMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
Current setup at SBox for locking the cavity

After spacial matching, the coupling increased to ~ 15 - 20 % 

The locking was done for the fundamental mode, tried to improve the coupling with the motors, but the lock is very unstable to be investigated.
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 00_Mode_Locked_Under_vacuum.bmpMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
Cavity locked today under vacuum and no airflow, it is stable over a long time

the alignment was improved and an increase of the transmission by 20 % from its original value

unfortunately,  data from the oscilloscope was saved, but it was not in the correct format (image) to show.
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
Closing the series for the setup

The cavity was only locked @ 133.33 MHz but the Finesse was not measured

The FSR was changed to match the new laser MENHIR 216.6625 MHz 
Entry   CVBG stretching / Fiber Injection , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 7x
Before injecting into the amplifier, the pulse needs to be stretched using a CVBG, type attached.

the CVBG is to be used at a small angle, the beam shape and spectrum after the PBS is attached.

After measuring the beam profile, a mirror was placed to direct all the power for fiber injection
    Reply   CVBG stretching / Fiber Injection , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
closing series




Manar
Amer wrote:



Before injecting into the amplifier, the pulse needs to be stretched
Entry   CFBG removed from ThomX CELIA amplifier, posted by Loïc Amoudry at Optical room about lasers and optics 
The CFBG has been removed successfully and the amplifier is closed now.

The soldering machine had a calibration trouble and was sent to the company for review during holidays.

The output power has been checked and is the same as before (tested until 30W ouput power).
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software WhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_5.02.24_PM.jpg
Amplifier placed next to the pulsed laser on the table under the airflow

The output is in free space with height from the table of about 10 cm, note the injection height into the cavity is between 14 - 15 cm.

a power cable is placed but not plugged.
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
The software to control the CELIA amplifier is on the laptop that was placed in ThomX bunker.

I have placed it in the PLIC room next to the SBox table.

it is called 'Alphanov Control Software'
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
Closing series




Manar
Amer wrote:



The software to control the CELIA amplifier is on the laptop that was
Entry   CELIA amplifier installation, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
The amplifier was installed on the optical table next to SBox table.

The CVBG that will be used for stretching before amplification needs cleaning (they are very fragile, 'ask victor for best method')

The software to drive the diodes of the amplifier we have is not the compatible one.
Entry   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics 
this morning with Alice, we sent the Menhir 160MHz injected in a fiber (with 6mW at the end of a long fiber) into the laser amplifier, to look for leakage
or damage in the first stages of the amplifier (the amplifier is totally off).

first of all, we checked for light scattering around the laser crate with a sensitive optical card => nothing
    Reply   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics IMG20241002144351.jpgIMG20241002144936.jpg20241002_161657.jpgClipboard_10-02-2024_01.jpg
this afternoon, we saw some electric cables badly connected to their power supply.
we fixed it by soldering them together and screwing the result to the power supply.
(see 1st image)
    Reply   CELIA 100W laser amplifier repair , posted by Ronic Chiche at Optical room about lasers and optics Sans_titre.png
friday morning, we add a zoom call with Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier scheme from the Loic thesis.
he suggested to:
Entry   Beam size vs D-shape position, posted by Loïc Amoudry at Optical room about lasers and optics 181018_4A_no_cut.PNG
Measurement done on 18/10/18.

At high power, the shape of the 0.0 mode does not change. The D-shape only generate losses in the cavity. Then the power stored in the cavity
decrease. As with this configuration, the cavity beam size decrease when power increase, the beam size decreased.
    Reply   Beam size vs D-shape position, posted by Loïc Amoudry at Optical room about lasers and optics size_vs_position_and_power.JPG
Matlab code for size vs position and power : 

clear all
close all
Entry   Beam size behind M2, posted by Ronic Chiche at Optical room about lasers and optics beam_diameter_behind_M2_-_1kW.pngbeam_diameter_behind_M2_-_30kW.png
Beam diameter behind M2 :

- 2nd stage @ 6A - 1kW inside cavity
sx = 2120 µm
    Reply   Beam size behind M2, posted by Ronic Chiche at Optical room about lasers and optics 
the telescope matchs the cold cavity beam, so it is normal to have a power decrease on the transmission photodiode when the cavity is heating at high
power.
we can try to adjust the telescope by moving lens, one by one, to increase the cavity power.
    Reply   Beam size behind M2, posted by Ronic Chiche at Optical room about lasers and optics 
Yesterday, we tried to better adapt positions of the telescope lenses, dynamically, during the lock, to improve the matching between input beam and cavity
mode.
it is a difficult task because it is quite sensitive to the alignment. we need to realign very often... and it is a long process.
ELOG V3.1.4-395e101