HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant les differentes pannes, Page 2 of 3  Not logged in ThomX    logo
    Reply   ND HG KD; RE: RE: Probleme station air comprime 
    Reply   ND HG KD; RE: Probleme station air comprime 
    Reply   dupraz; RE: Panne synchroLock 
    Reply   N. Delerue; RE: IHM BPM a freezer 
    Reply   N. Delerue; RE: IHM BPM a freezer 
    Reply   ND; RE: Health check: probleme vide 
    Reply   KD, JNC, MO; RE: Frigo Section/Canon 
    Reply   ND; RE: Erreur sur TL/PS/DPi.01, entered from 134.158.88.175 
Entry   ND; Problème de contact sur la porte grillagée / accès contrôlés 20250404_163036.jpg
Entry   SC,MO,SP; Problème CTA 
Entry   ND HG KD; Probleme station air comprime 
Entry   KD, FW, OD; Pilotage alimentation Dipole EL EL/PS/DP 
Entry   dupraz; Panne synchroLock 
Entry   CB/HG/JN; Modulateur ne démarre pas 
Entry   ND; Local error sur EL/PS/DP et sur RI-C1/PS/DP. 
Entry   Viktor Soskov; Laser status 
Entry   CB/HG/JN; Jauges OFF  
Entry   KD, FW; Interversion RI-C2/QP.06 et EL/QP.07 
Entry   Nicolas Delerue; Impossible de lancer IHM_RF 
Entry   C. Bruni; IHM BPM a freezer 
ELOG V3.1.4-395e101