HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Diagnostiques
  elog des diags., Page 2 of 8  Not logged in ThomX    logo
Entry   Entered by Moutardier from 193.55.29.171 on Thu Oct 22 11:00:17 2020; échange des Libera 2 et 3 
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Tue Dec 8 12:58:57 2020; Libera arrêtés 
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Tue Dec 15 16:59:10 2020; Trigger défaillant TL/DG/SST.02-CCD-01 
Entry   Entered by Moutardier from 134.158.195.142 on Wed Jan 20 16:15:31 2021; Démarrage ds MeanStd 
Entry   Entered by Moutardier from 134.158.195.142 on Thu Jan 28 14:16:54 2021; Tout les Libéra de nouveau fonctionnels 
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Wed Jun 9 14:50:31 2021; Résolution LI/DG/SST1 Resolution_LI_DG_SST_1.pptx
Entry   Entered by Moutardier Alexandre from 193.55.29.169 on Tue Jun 22 10:11:55 2021; Vérification switch/moteur station SST et fente 
Entry   Entered by vincent.chaumat from 134.158.195.144 on Fri Jul 9 11:10:45 2021;  Wavecatcher2
Entry   Entered by vincent.chaumat from 134.158.195.144 on Mon Jul 12 10:27:17 2021;  IHMcharge_2021-07-12_10-39-31.pngcalc-EL-FC-01-WAC3-ch0.png
Entry   Entered by Nicolas Delerue from 134.158.195.145 on Tue Jul 20 14:38:00 2021; Changements config WAC 
Entry   Entered by vincent.chaumat from 134.158.195.144 on Wed Jul 21 15:00:38 2021; DS wavecatcher 
Entry   Entered by vincent.chaumat from 134.158.195.144 on Fri Jul 23 09:27:09 2021; vérification fonctionnement IHM charge avec parametres d'étalonnage 
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Fri Jul 23 12:24:08 2021; IHM Charge 
Entry   Entered by Alexandre Moutardier from 193.55.29.169 on Mon Oct 11 15:13:03 2021; Libéra 5 en erreur  
Entry   Entered by Alexandre Moutardier from 193.55.29.169 on Mon Oct 11 15:18:09 2021; Cabage des BPM et WaveCatcher 
Entry   Entered by Iryna Chaikovska from 134.158.89.93 on Thu Oct 14 16:23:19 2021; Commissioning of the Libera ER/DG/RAC.05-LIB-01 (BPM LI/DG/BPM.01-LIB.01) Screenshot_from_2021-10-13_15-56-26.png
Entry   Entered by Iryna Chaikovska from 134.158.89.93 on Thu Oct 14 17:02:09 2021; BPM signal with the beam recorded by the scope on 12/10/2021 bpm1.pngbpm.png
Entry   Entered by Moutardier Alexandre from 193.55.29.170 on Tue Oct 26 11:25:40 2021; Correction erreur cablage BPM linac 
Entry   Entered by Iryna Chaikovska from 134.158.195.144 on Tue Oct 26 12:31:59 2021; Search for the signal LI/DG/BPM.01-LIB.01 Screenshot_from_2021-10-26_12-45-31.pngScreenshot_from_2021-10-25_15-14-56.pngSignal_BPM_li.png
Entry   Entered by Iryna Chaikovska from 134.158.195.144 on Tue Oct 26 12:51:24 2021; , entered from 134.158.195.144 
ELOG V3.1.4-395e101