Entry   IC, DN, RC, HG, ME; Improve ring for X-rays  7x
Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and all the machine

Camera SST2 : impossible de changer le temps d'expo 
icon1.gif   Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025; Laser position  
New laser position :

5.041
4.448
Entry   Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025; Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) 10x
*** Spectres des 4 Echantillons Bazin + Backgroung avec :


Cone en plomb pour pieger le faisceau - Ouverture : diametre hori ~ 1.5 , vert ~ 1.8 cm  (Ouverture fentes 2 :
hori =15 mm , vert =14 mm)
Beaucoup plus de stat


*** Trends de galerienne (trentaine
Entry   KD; shift du 20 juin 2025 6x
8h20: mise en chauffe en remote (frigo/chiller, modulateur, laser, Cyclage)

IHM cyclage plante toujours au tant.

9h45 : Mise en route. Rechargement de la recette de référence d'hier : "50MeV_100pC_20250619_16_39_12"
Entry   KD; shift du 19 juin 2025 
8h: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

*** Programme *** 

- mise en route du feedback longitudinal 
Entry   Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025; Linac measurement + phase +  6x

Phi Qmax ; 324° : Phi Emax : 274°
Qmax : 70-80 pC (Att : 290°) and 300 pC (Att : 420°)
Recipt : 50MeV_100pC_20250527_14_10_19.txt
Att
Section : 2.45 dB, phi min disp : 209°
Quad align done


13h20 : Pause

13h30 ND operateur.
Entry   VM,IC;  health_check_Diag_charge_wavecatcher_2025_06_13_10_13.pngScreenshot_from_2025-06-13_11-11-22.pngScreenshot_from_2025-06-13_14-31-57.pngScreenshot_from_2025-06-13_14-31-45.png
08h40 ThomX was started: Modulator, Frig, Laser

08h45 Chillers were started, cycling all magnets

09h56 HV is 'ON'
Entry   Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025; 2025-06-04 Fluo-spectro : Spectre du 2025-06-04 spectres_20250604.pdf
 
Entry   KD; shift du 11 juin 2025 
8h10: mise en chauffe à distance (modulateur, frigo/chiller, cyclage aimant, laser)

Programme: Nouvelle prise de donnees Spectres Echantillon Bazin
Entry   SC, HG; Emittance + data taking  Emittance_QP7_phiS_222.pngEmittance_QP7_phiS_220.pngEmittance_QP7.pngEmittance_QP3.png
phi max :  220 deg Qmax = 120 pC

Laser new position : 4.714 / 3.524

zPhiS=215   AttS=2.58 dB
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'
Entry   VM, IC, DN, RC; Interaction region studies 6x
Goals: Optimization of the IP. Verification of the llaser waist position and electron
beam angle wrt. collision plane.

08h25 ThomX was started; Modulator, Frig, Laser
Entry   KD; shift du 04 juin 2025 DS_IHM.pngtest_initial.pngtest_final.png
8h10: mise en chauffe à distance (modulateur, laser, frigo/chiller, cyclage)

  * le cylcage plante toujours autan (redémarrage de l'IHM après allumage des aimants et à la moitier du
cyclage des aimants)
Entry   KD; shift du 03 juin 2025 
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
Entry   KD,VM,IC;  EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png
08h00 ThomX was started

Goals: Emittance measurements, ring optics study

10h00 HV was 'ON'
Entry   VM, IC;  9x
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.


08h33 ThomX was started: modulator,frig, laser
Entry   VM, IC; Ring BLM and charge linearity 6x
Goals: 

- Work on the BLM to have the signals at the injection and from the arc in the ring.

- Study on the ring injection and beam storage at higher beam charge. Check the linearity.
Entry   Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025; Spectro Si VORTEX : Calibration 2025-05-23_17-46-30-VORTEX_Sn_Au.png
Le spectro Si (vortex/falconX) a ete calibre avec une feuille d'etain

Calib checkee avec une feuille d'or

Cf screenshot spectre Sn (rouge) et Au (vert) superposes
Entry   KD; shift du 23 mai 2025 
7h55: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

Problème de trigger : tout le monde est à 12.5Hz sauf le trig diag à 6.25Hz (signal de trig en entrée des générateurs
de délais) ==> problème CPLD/code
Entry   KD; shift du 22 mai 2025 Vide_temp__2025-05-22_11-43-16.pngRF_2025-05-22_11-42-51.png
8h20 : mise en chauffe de la machine à distance (modulateur, frigo/chiller, laser, cyclage)

att canon 0 dB (3Us & 12.5Hz) Plots RF vide et temp (voir image jointe)