IC, DN, RC, HG, ME; Improve ring for X-rays 7x
|
Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and all the machine
Camera SST2 : impossible de changer le temps d'expo |
Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025; Laser position
|
New laser position :
5.041
4.448 |
Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025; Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) 10x
|
*** Spectres des 4 Echantillons Bazin + Backgroung avec :
Cone en plomb pour pieger le faisceau - Ouverture : diametre hori ~ 1.5 , vert ~ 1.8 cm (Ouverture fentes 2 :
hori =15 mm , vert =14 mm)
Beaucoup plus de stat
*** Trends de galerienne (trentaine |
KD; shift du 20 juin 2025 6x
|
8h20: mise en chauffe en remote (frigo/chiller, modulateur, laser, Cyclage)
IHM cyclage plante toujours au tant.
9h45 : Mise en route. Rechargement de la recette de référence d'hier : "50MeV_100pC_20250619_16_39_12" |
KD; shift du 19 juin 2025
|
8h: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
*** Programme ***
- mise en route du feedback longitudinal |
Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025; Linac measurement + phase + 6x
|
Phi Qmax ; 324° : Phi Emax : 274°
Qmax : 70-80 pC (Att : 290°) and 300 pC (Att : 420°)
Recipt : 50MeV_100pC_20250527_14_10_19.txt
Att
Section : 2.45 dB, phi min disp : 209°
Quad align done
13h20 : Pause
13h30 ND operateur. |
VM,IC;   
|
08h40 ThomX was started: Modulator, Frig, Laser
08h45 Chillers were started, cycling all magnets
09h56 HV is 'ON' |
Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025; 2025-06-04 Fluo-spectro : Spectre du 2025-06-04
|
| |
KD; shift du 11 juin 2025
|
8h10: mise en chauffe à distance (modulateur, frigo/chiller, cyclage aimant, laser)
Programme: Nouvelle prise de donnees Spectres Echantillon Bazin |
SC, HG; Emittance + data taking   
|
phi max : 220 deg Qmax = 120 pC
Laser new position : 4.714 / 3.524
zPhiS=215 AttS=2.58 dB |
MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025; 
|
08h15 ThomX was started; Modulator, Frig, Laser
08h21 Chillers were started, cycling all magnets
09h40 HV is 'ON' |
VM, IC, DN, RC; Interaction region studies 6x
|
Goals: Optimization of the IP. Verification of the llaser waist position and electron
beam angle wrt. collision plane.
08h25 ThomX was started; Modulator, Frig, Laser |
KD; shift du 04 juin 2025  
|
8h10: mise en chauffe à distance (modulateur, laser, frigo/chiller, cyclage)
* le cylcage plante toujours autan (redémarrage de l'IHM après allumage des aimants et à la moitier du
cyclage des aimants) |
KD; shift du 03 juin 2025
|
| 8h: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage) |
KD,VM,IC; 
|
08h00 ThomX was started
Goals: Emittance measurements, ring optics study
10h00 HV was 'ON' |
VM, IC; 9x
|
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.
08h33 ThomX was started: modulator,frig, laser |
VM, IC; Ring BLM and charge linearity 6x
|
Goals:
- Work on the BLM to have the signals at the injection and from the arc in the ring.
- Study on the ring injection and beam storage at higher beam charge. Check the linearity. |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025; Spectro Si VORTEX : Calibration
|
Le spectro Si (vortex/falconX) a ete calibre avec une feuille d'etain
Calib checkee avec une feuille d'or
Cf screenshot spectre Sn (rouge) et Au (vert) superposes |
KD; shift du 23 mai 2025
|
7h55: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
Problème de trigger : tout le monde est à 12.5Hz sauf le trig diag à 6.25Hz (signal de trig en entrée des générateurs
de délais) ==> problème CPLD/code |
KD; shift du 22 mai 2025 
|
8h20 : mise en chauffe de la machine à distance (modulateur, frigo/chiller, laser, cyclage)
att canon 0 dB (3Us & 12.5Hz) Plots RF vide et temp (voir image jointe) |