938
|
Tue Oct 8 15:29:17 2024 |
VC MJ HG JN | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
Pas de charge (20 pC Q max) car shutter PSS orange
Apres plus de 30 minutes : shutter vert enfin ...
charge canon 105 pC
Charge transmise 120 pC
influence de Li str2 sur les bump après la section
Premier test avec
str2 à zéro mais allumé
str1 H -2.5 V 0.62
Il n'y a plus que de petits sauts sur bpmTL1 (~ 0.1 mm) cf screenshot
yagTL1 490 / 318
bpmTL1 1.81 / -1.19
17h32 avec Align QUADS (screenshot kicks)
YagTL1 365 / 274
bpmTL1 0.07 / 0.02
YagTL1 326 / 247
bpmTL1 -0.04 / 0.34
YagTL1 368 / 230
bpmTL1 0.60 / 0.70
YagLI faisceau pas sur l'ecran
bpmLI 4.23 / -1.12
18h15 avec Align section + str3V = -5 (screenshot kicks)
YagTL1 274 / 115
bpmTL1 -0.87/ 2.96
YagTL1 261 / 137
bpmTL1 -1.16 / 2.51
YagLI faisceau pas sur l'ecran
bpmLI 4.73 / -2.77
18h35 Acces casemate avec JN pour mettre un fil de masse entre les brides ICT1 pour le courcicuiter
19h appel Maher car la ronde est cassee (sans doute un arret d'urgence appuye sans s en rendre compte). Merci Maher !!!
19h25 Reprise de l'etude kicks faisceau
La tresse de massse sur ICT ne change rien aux kicks (screenshot)
Steerers 20h02
H1=-1.04 V1=0.10 H2=-0.82 V2=0.66
Faisceau sur yagtl1 (screenshot)
Bpmtl1 presque plus de kicks en horizontal - kicks en vertical toujours presents (screenshot)
bpmLI 0.17 / 1.52
yagTL 596 / 303
bpmTL 3.61 / 0.01
Steerers 20h25 : j'essaie de diminuer encore les str horizontaux
H1=-0.54 V1=0.10 H2=-0.52 V2=0.66 + STRLI_H = -10 pour que le faisceau reste sur le yagTL1
bpmLI 0.8 / 1.53
yagTL 628 / 269
bpmTL 5.48 / 0.73
yagLI 404 / 211
20h50 fin de shift |
| Attachment 1: bpmTL1_str2_0_str1_H-2.5_V0.62.png
|
 |
| Attachment 2: bpmtl1_alignQUADs.png
|
 |
| Attachment 3: bpmtl1_align_SECTION.png
|
 |
| Attachment 4: bpmtl1_align_SECTION_masseICT.png
|
 |
| Attachment 5: yagtl1_str_20h02.png
|
 |
| Attachment 6: bpmtl1_str_20h02.png
|
 |
| Attachment 7: bpmtl1_str_20h25.png
|
 |
|
932
|
Thu Oct 3 08:27:17 2024 |
VC MJ HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
8h30 demarrage chauffage
pB de vanne vide (qui est fermée et en mode local...)
shutter laser sécu PSS en défaut (orange) impossible de le passer vert...
pour le strap MPS- Li TL EL=> si on arrete les dipoles le tir est interdit => strap ne fonctionne pas!
Passage en mode LInac
Mesure energie canon avec str1H E_kin=4.6 (calib modifiée CH : 39.4e-6 m
Prise de donnees
Essais
GUN passage à 0 dBpour essayer d'augmanter l'energie à 5 MeV mais il claque énromément ... 0.25 idem 0.3 plus stable
0.1 dB : E 4.8 MeV claquages nombreux mais se stabilise.
|
|
989
|
Tue Jan 7 08:40:58 2025 |
VC MJ HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 07/01/25 | |
demarrage machine 8h30
pB serveurs/IHMs
vide (peg) (pas de communication)
Camara laser (impossible de lancer l'IHM )
RF plots (pas de raffraichissement (sauf Pr gun) dans RF plots alors que les DS fonctionnent)
vide (peg) (pas de communication) === OKExternal_trigger_multi
Camara laser ==== résolu sur PC client 2 (sur client 1 ça marche pas) (la caméra ext trigger en mode externe LI/OP/LAS2 acq_trigger_mode "External_trigger_multi"
Redpitaya redemarées avec bouton Camera power
Client 1 redémarré.... pB résolus..
Realignement laser photocathode
x=6.358
y=3.406
Passage section
Recette 20241219_18_13_51 charge --> QUAD 1 et 3 completement desalignes
Alignement QUAD 1 et 3
QUAD SCANS pour
** sol 230 et sol 250
** Q1 Q3 = 0 et Q1 Q3 au val nominal
** Iris = 0.5 (charge 35 pC), 1.3 (charge 100 pC) et 5 (charge 215 pC)
2 scan differents pour X et Y - data dans data/shared
Passage TL jusqu a SST03
Mesure fonction dispersion en fonction de la phase section sur les 4 bpmTL et YAG SST03
Quad scan QP7 Iris = 0.5, 1.3 et 5
|
|
924
|
Fri Sep 27 08:26:14 2024 |
VC MJ | Under Process | Problem | SY |
|
pB synchro | |
mise en chauffe machine => synchrro OK
=> frigo en marche => synchro OK
=> chiller en marche => synchro OK
=> alim linac en marche (I=0A)=> synchro OK
=> alim linac en marche (I = nominale) => synchro OK
=> alim TL en marche (I=0A)=> synchro OK
=> alim TL en marche (I = nominale) => synchro OK
=> alim RI-C1 en marche (I=0A)=> synchro OK
=> alim RI-C1 en marche (I=1A ou nominale)=> =PB Synchro apparait!!!
=> extinction Steerer RI-C1+dipole RI-C1-DP.01 => SYNCHO OK
=> extinction Steerer et QP RI-C1 => Synchro OK
=> extinction RIC1-C2 SP03 => Synchro OK
=> extinction RIC1-C2 SP01 => Synchro OK
=> extinction RIC1-C2 SP02 => Synchro OK
dipole RI-C1-DP.01 perturbe la synchro quandcourant est à I=236A (c'est reproductible) (236A était la valeur enregistrée)
démarrage de toutes les alims (avec une recette anneau) sauf RI-C1-DP.01 => synchro OK
Le pb apparrait progressivement quand on augmente le courant (plutot régulier à partir de 200A)
On va prendre un cafe et ensuite on va redemarrer la machine
Au redemarrage le probleme reapparait quand on met du courant dans dip_TL.
Test de toutes les alims dipole
Le pB synchro semble en fait lié aux courants délivrés par toutes les alims des dipoles (cf les screenshots des signaux sur bpmLI)
Je pense qu'il est beaucoup plus visible et frequent avec les dipoles ANNEAU car les 8 s'allument en meme temps
Test de l'alim SOLENO : idem probleme de synchro quand on va a fort courant (cf screenshot SOLENO)
Le dernier screenshot c'est :
Soleno OFF et tous les dipoles OFF sauf le EL_DP01 (qu'on ne peut pas eteindre sinon on n'a plus lautorisation de tir)
|
| Attachment 1: diople_EL_200.png
|
 |
| Attachment 2: dipole_TL-159.3.png
|
 |
| Attachment 3: dipole_EL_inj_9.png
|
 |
| Attachment 4: dipoles_ring_159.3.png
|
 |
| Attachment 5: alim_soleno_280.png
|
 |
| Attachment 6: all_OFF_exceptELDP01_a_0.png
|
 |
|
928
|
Mon Sep 30 09:52:38 2024 |
VC MJ | Under Process | Problem | Linac Commissionning |
|
remise en route d'une synchro valide | |
9h50 démarrage chauffage Klystron
la sortie d'urgence porte casemate a été appuyé ce matin.... ça bloque la ronde
16H... le timing a sauté pendant quelques secondes et est revenu tout seul
16H15 le 50Hz c'est mis à mal fonctionner ... replug des sondes dans le chassis (scope R&S 162.168.229.80)
tout refonctionne...
160pC à charge Max (67°)
Passage section : charge transmise a 100%
* seulement pour SOLENO 220-230
* qq soit l'alignement (section ou quads)
* qq soit l'ouverture d'iris.
Sautes de faisceaux toujours presentes toutes les 2-3 minutes
Fin de shift.
Synchro OK pour demain matin
|
|
954
|
Wed Nov 6 08:06:51 2024 |
VC MJ | Under Process | Shift summary | Linac Commissionning |
|
shift | |
demarrage chauffage 8h
autorisation PSS zone modulateur interdite => il faut venir valider la zone
PB MPS appel nourredine
plus les bouton mode de tir (solution mode expert/tir/forçage choix tir)
acquitement defaut vide: (solution mode expert /vide/validation)
pb MPS regle
shutter orange - on laisse refroidir 10 min - shutter vert
camera laser a bouge le point cathode est perdu
phase ch max = 58
charge = 180 pC avec att laser = 320
Essai de Realignement point cathode
Script alignement_photocathode_BPM (phase_max -5) --> va completement dans le decor (pos x=21 et posy=-6 !!) ... cf screenshot signal BPMLI
Je relance le script en partant d'une autre position depart pour M4 (13h56)
script arreté à pos (pos x=31 et posy=-17 !!)
Viktor réaligne le laser PC sur les références physiques
M4.01 (Cathode H) 470
M4.02 (Cathode V) 5488
On retroouve le faisceau sur YAGLI pour
M4.01 (Cathode H) 800
M4.02 (Cathode V) 5120
Mais le faisceau n'est plus sur la camera
Viktor acces casemate pour rerentrer le faisceau image laser sur la camera UV avec les miroirs de renvoie (16h19)
on regle à la main alignement laser sur cathode
optimisation sur BPM
M4.01 (Cathode H) 880
M4.02 (Cathode V) 5133
réaligneent avec script BPM
pos asservissement
H iris pos 6.33 mm (855)
V iris pos 3.56 mm (5133)
Point cathode realigne pour prochain shift
Prise de donnees rapide a la fin (note sur une feuille papier pour l'instant)
(Une belle journee de mer ...)
|
| Attachment 1: BPMLI_align_photocathode_13h15.png
|
 |
| Attachment 2: BPMLI_align_photocathode_13h56.png
|
 |
| Attachment 3: Laser_sur_cameraUV_16h19.png
|
 |
|
976
|
Fri Dec 6 11:11:31 2024 |
VC MJ | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Installation du PM dans la X-hucth | |
Le PM est installe dans la X-hutch (PM + gene + ocsillo), on a test que ca fonctionne -
Il manque juste un cable HT plus long pour positionner l'ampli de facon secure (Vincent lundi) |
|
910
|
Wed Sep 11 08:39:18 2024 |
VC KD | Under Process | Shift summary | Linac Commissionning |
|
Commisionning linac set 2024 | |
8h30 démarrage chauffage modulateur
9h: mise en chauffe laser, chiller et remise SF6 (2.4bars --> 2.6bars)
9H30 puissance Klystron ON 1215V
phase Emax canon 142
section att 2.56dB phase 239° dispartion min
|
|
931
|
Wed Oct 2 08:08:52 2024 |
VC HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
demarrage chauffage 8h10
visite étudiant M2 => visite fini
vanne vide anneau
scan str LI 1 et 2 pour trouver l'axe section (script scan_IRIS_section.py)
on scanne avec un point fixe en sortie de section. on deplace le point de sortie pour avoir une symétrie cylindre sur la transmission de charge dans la section:
(c
# Scan entrée Iris
STR1_init = [0.93,-1.1]
STR2_init = [-2.86, 1.86]
# nouveau vertival pour se décaler de 21 à 40 en sortie vertical $
# STR V : -1.4037467103479566, 2.7489454498601917)
# Scan entrée Iris
STR1_init = [0.93,-1.40]
STR2_init = [-2.86, 2.75]
on passe en scan horizontal...
reduction de l'iris à 0.5mm
best point sortie section (sur script) (V21H-85) pour avoir une transmission de charge à symétrie cylindrique
=> on obtient un centre iris entrée section de (H0 V-10)
premier scan point fixe entrée (obligé de mettre TL/str.01 à -A10
optimisation transport avec charge:
He -0.3 Ve -10 Hs -88 Vs 20
correspond à
Li STR.01H 1.3
Li STR.01V -2.79
Li STR.02H 3.76
Li STR.02V -3.95
|
|
834
|
Thu Jan 25 08:49:29 2024 |
VC DN ND, IC, VM, KD, AS RC , VK... | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
commitionning | |
8h45 demarrage chauffage Modulateur et frigo
Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible (pc laser demarré par Kevin)
8h50 demarrage chiller et cycling magnet => OK
9h13 demarrage ampli laser PC
9h30 Git pull
10h20 Demarrage faisceau
10h27 Recette chargee: all_20240124_18_17_03
10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge
Phase RF section 126
10h53 Etude de l'influence de la phase laser sur la phase RF.
10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0
10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000
11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000
11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000
11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000
11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000
11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000
Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...
11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.
11h32 phase anneau initiale 2320, new phase: 4500
Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved. The new receipt is
recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt
For this receipt the x- beam position @TL BPM2 should be 0 mm.
During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.
The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)
Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%
The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)
Plein de choses a ecrire... Acces PERLE, des rayons X,...
Une dizaine de personnes en SdC.
15h30 scan en temps du kicker d 'extraction.
Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.
Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).
Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.
Suggestion de retard pour le kicker d 'extraction: -8.310us
Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.
Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)
** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé
** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.
** image prise du centre du faisceau
** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)
** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)
Paramètre synchro CFP/Anneau :
* delai trig/cfp (19.4ns),
* dephaseur 500MHz (7.2V),
* setpoint cavité CFP (0V) sur pente négative,
* phase rigol (0° voie1, 204° voie2).
|
| Attachment 1: health_check_2024_01_25_10_20.png
|
 |
| Attachment 2: scan_Laser_vs_RF_phase_2024_01_25_10_24.png
|
 |
| Attachment 3: scan_Laser_vs_RF_phase_2024_01_25_10_55.png
|
 |
| Attachment 4: scan_Laser_vs_RF_phase_2024_01_25_10_58.png
|
 |
| Attachment 5: scan_Laser_vs_RF_phase_2024_01_25_11_00.png
|
 |
| Attachment 6: scan_Laser_vs_RF_phase_2024_01_25_11_02.png
|
 |
| Attachment 7: scan_Laser_vs_RF_phase_2024_01_25_11_04.png
|
 |
| Attachment 8: scan_Laser_vs_RF_phase_2024_01_25_11_07.png
|
 |
| Attachment 9: scan_Laser_vs_RF_phase_2024_01_25_11_12.png
|
 |
| Attachment 10: Screenshot_from_2024-01-25_11-18-55.png
|
 |
| Attachment 11: bpm_0_vs_ext_kicker_second_15h59.png
|
 |
| Attachment 12: Screenshot_from_2024-01-25_15-53-54.png
|
 |
| Attachment 13: Screenshot_from_2024-01-25_15-58-31.png
|
 |
| Attachment 14: bpm_0_vs_ext_kicker_second_16h22.png
|
 |
| Attachment 15: Screenshot_from_2024-01-25_17-14-11.png
|
 |
| Attachment 16: Screenshot_from_2024-01-25_17-13-45.png
|
 |
| Attachment 17: Screenshot_from_2024-01-25_17-12-36.png
|
 |
| Attachment 18: Screenshot_from_2024-01-25_13-05-25.png
|
 |
| Attachment 19: S_HisPhase.png
|
 |
| Attachment 20: S_Phase25012025.png
|
 |
| Attachment 21: S_Ampl25012025.png
|
 |
| Attachment 22: figSRorbit_25012024.png
|
 |
| Attachment 23: TbtX_BPM2_999turn_20_turn_24Jan25Jan_comparizon.pdf
|
| Attachment 24: untitled.png
|
 |
| Attachment 25: mesures_X_stable_table_presque_opt2.dat
|
# DATASET= "xli/op/tmd.01/i1[0]"
# SNAPSHOT_TIME= 2024-01-25_17:03:29.091516
2024-01-25_16:12:21.277546 264.5495076651646
2024-01-25_16:12:21.478000 265.0835657916696
2024-01-25_16:12:21.478000 265.0835657916696
2024-01-25_16:12:21.577264 263.86286150251533
2024-01-25_16:12:21.677515 265.9990940085354
2024-01-25_16:12:21.777712 271.30152826454946
2024-01-25_16:12:21.877894 268.02088548744723
2024-01-25_16:12:21.978116 265.5794769091386
2024-01-25_16:12:22.077270 265.6557709272107
2024-01-25_16:12:22.177491 264.81653672841713
2024-01-25_16:12:22.277726 264.5495076651646
2024-01-25_16:12:22.377911 265.0072717735975
2024-01-25_16:12:22.478151 272.2170564814152
2024-01-25_16:12:22.577393 264.9691247645614
2024-01-25_16:12:22.677632 1651.6510502348424
2024-01-25_16:12:22.777818 278.24428390911476
2024-01-25_16:12:22.878015 273.3614667524974
2024-01-25_16:12:22.977183 268.1734735235915
2024-01-25_16:12:23.077366 266.11353503564357
2024-01-25_16:12:23.177565 264.5495076651646
2024-01-25_16:12:23.277781 264.5876546742007
2024-01-25_16:12:23.378020 265.80835896335503
2024-01-25_16:12:23.477223 263.5958324392628
2024-01-25_16:12:23.577437 271.1107932193691
2024-01-25_16:12:23.677707 275.57399327658965
2024-01-25_16:12:23.777916 268.74567865913264
2024-01-25_16:12:23.877121 263.21436234890206
2024-01-25_16:12:23.977303 268.7838256681687
2024-01-25_16:12:24.077539 270.1571179934673
2024-01-25_16:12:24.177809 263.3288033760103
2024-01-25_16:12:24.278045 1591.3787759578474
2024-01-25_16:12:24.377244 278.93093007176407
2024-01-25_16:12:24.477436 267.6394153970865
2024-01-25_16:12:24.577622 266.11353503564357
2024-01-25_16:12:24.677844 267.7920034332308
2024-01-25_16:12:24.778039 264.20618458383996
2024-01-25_16:12:24.877239 263.6721264573349
2024-01-25_16:12:24.977431 264.1298905657678
2024-01-25_16:12:25.077607 262.7947452495053
2024-01-25_16:12:25.177770 263.78656748444314
2024-01-25_16:12:25.277942 270.42414705671985
2024-01-25_16:12:25.377142 272.1789094723792
2024-01-25_16:12:25.477380 264.3969196290203
2024-01-25_16:12:25.577595 264.20618458383996
2024-01-25_16:12:25.677821 263.51953842119065
2024-01-25_16:12:25.778028 274.0862599241828
2024-01-25_16:12:25.877228 271.4922633097298
2024-01-25_16:12:25.977437 3400.2336504303457
2024-01-25_16:12:26.077637 286.1025677705457
2024-01-25_16:12:26.177807 272.7892616169563
2024-01-25_16:12:26.278018 268.36420856877186
2024-01-25_16:12:26.377234 264.6258016832367
2024-01-25_16:12:26.477434 266.0753880266075
2024-01-25_16:12:26.577672 264.4732136470925
2024-01-25_16:12:26.677854 264.3587726199843
2024-01-25_16:12:26.778043 264.4732136470925
2024-01-25_16:12:26.877240 264.24433159287605
2024-01-25_16:12:26.977435 273.93367188803853
2024-01-25_16:12:27.077629 263.86286150251533
2024-01-25_16:12:27.177810 263.2906563669742
2024-01-25_16:12:27.278020 262.90918627661347
2024-01-25_16:12:27.377220 264.0154495386596
2024-01-25_16:12:27.477421 261.91736404167557
2024-01-25_16:12:27.577639 262.3751281501085
2024-01-25_16:12:27.677854 2779.8869894857307
2024-01-25_16:12:27.778060 284.1189233006699
2024-01-25_16:12:27.877248 270.08082397539516
2024-01-25_16:12:27.977432 265.6939179362468
2024-01-25_16:12:28.077614 277.3669027012851
2024-01-25_16:12:28.177834 264.77838971938104
2024-01-25_16:12:28.278036 264.6639486922728
2024-01-25_16:12:28.377231 264.89283074648927
2024-01-25_16:12:28.477467 262.26068712300025
2024-01-25_16:12:28.577695 263.6339794482989
2024-01-25_16:12:28.677937 265.2361538278139
2024-01-25_16:12:28.777151 269.81379491214267
2024-01-25_16:12:28.877348 266.72388718022074
2024-01-25_16:12:28.977550 274.200700951291
2024-01-25_16:12:29.077761 264.24433159287605
2024-01-25_16:12:29.178000 263.48139141215455
2024-01-25_16:12:29.277185 270.69117611997234
2024-01-25_16:12:29.377358 2381.25074505877
2024-01-25_16:12:29.477570 280.9145745416398
2024-01-25_16:12:29.577804 270.42414705671985
2024-01-25_16:12:29.677975 265.84650597239107
2024-01-25_16:12:29.777175 265.6557709272107
2024-01-25_16:12:29.877378 270.9200581741888
2024-01-25_16:12:29.977582 263.4432444031185
2024-01-25_16:12:30.077809 278.4350189542951
2024-01-25_16:12:30.178027 264.8546837374532
2024-01-25_16:12:30.277264 262.0699520778199
2024-01-25_16:12:30.377481 271.7974393820184
2024-01-25_16:12:30.477697 262.29883413203635
2024-01-25_16:12:30.577949 265.6557709272107
2024-01-25_16:12:30.677194 265.3887418639582
2024-01-25_16:12:30.777424 263.2906563669742
2024-01-25_16:12:30.877653 263.9773025296235
2024-01-25_16:12:30.977896 266.41871110793215
2024-01-25_16:12:31.077096 1745.6834275087617
2024-01-25_16:12:31.177263 305.8627184512314
2024-01-25_16:12:31.277489 273.3614667524974
2024-01-25_16:12:31.377689 268.2116205326276
2024-01-25_16:12:31.477891 266.9527692344372
2024-01-25_16:12:31.577108 265.6939179362468
2024-01-25_16:12:31.677331 266.41871110793215
2024-01-25_16:12:31.777536 264.20618458383996
2024-01-25_16:12:31.877699 264.1298905657678
2024-01-25_16:12:31.977881 269.470471830818
2024-01-25_16:12:32.078082 262.26068712300025
2024-01-25_16:12:32.177287 265.0072717735975
2024-01-25_16:12:32.277497 276.56581551152755
2024-01-25_16:12:32.377770 266.41871110793215
2024-01-25_16:12:32.478008 265.77021195431894
2024-01-25_16:12:32.577232 262.52771618625275
2024-01-25_16:12:32.677495 271.1489402284052
2024-01-25_16:12:32.777675 263.21436234890206
2024-01-25_16:12:32.877910 299.30143289702687
2024-01-25_16:12:32.977138 269.3178837946737
2024-01-25_16:12:33.077363 267.71570941515864
2024-01-25_16:12:33.177562 265.3124478458861
2024-01-25_16:12:33.277771 263.17621533986596
2024-01-25_16:12:33.377921 274.6203180506878
2024-01-25_16:12:33.477062 262.4132751591445
2024-01-25_16:12:33.577290 264.9691247645614
2024-01-25_16:12:33.677536 262.7565982404692
2024-01-25_16:12:33.777752 270.65302911093625
2024-01-25_16:12:33.877990 262.8710392675774
2024-01-25_16:12:33.977222 261.95551105071166
2024-01-25_16:12:34.077415 262.90918627661347
2024-01-25_16:12:34.177614 263.17621533986596
2024-01-25_16:12:34.277827 262.4895691772167
2024-01-25_16:12:34.378076 263.710273466371
2024-01-25_16:12:34.477286 268.7838256681687
2024-01-25_16:12:34.577526 311.4703287795341
2024-01-25_16:12:34.677702 271.37782228262165
2024-01-25_16:12:34.777888 265.4268888729943
2024-01-25_16:12:34.877122 271.07264621033306
2024-01-25_16:12:34.977355 263.21436234890206
2024-01-25_16:12:35.077548 263.09992132179383
2024-01-25_16:12:35.177782 263.3288033760103
2024-01-25_16:12:35.277989 263.4050973940824
2024-01-25_16:12:35.377220 264.3969196290203
2024-01-25_16:12:35.477426 263.6721264573349
2024-01-25_16:12:35.577661 264.1680375748039
2024-01-25_16:12:35.677837 262.94733328564956
2024-01-25_16:12:35.778038 268.09717950551936
2024-01-25_16:12:35.877242 261.84107002360344
2024-01-25_16:12:35.977444 269.5086188398541
2024-01-25_16:12:36.077636 263.2906563669742
2024-01-25_16:12:36.177815 265.1217128007057
2024-01-25_16:12:36.278038 319.7482297403619
2024-01-25_16:12:36.377284 272.63667358081204
2024-01-25_16:12:36.477460 266.0753880266075
2024-01-25_16:12:36.577637 276.7184035476718
2024-01-25_16:12:36.677838 266.2279760627518
2024-01-25_16:12:36.778008 264.6258016832367
2024-01-25_16:12:36.877204 264.1680375748039
2024-01-25_16:12:36.977400 264.7020957013089
2024-01-25_16:12:37.077594 264.1680375748039
2024-01-25_16:12:37.177795 262.7565982404692
2024-01-25_16:12:37.277998 262.0318050687838
2024-01-25_16:12:37.377196 264.3206256109482
2024-01-25_16:12:37.477432 263.2906563669742
2024-01-25_16:12:37.577646 262.3369811410724
2024-01-25_16:12:37.677891 261.87921703263953
2024-01-25_16:12:37.777089 263.2906563669742
2024-01-25_16:12:37.877260 262.10809908685593
2024-01-25_16:12:37.977495 4114.765276685025
2024-01-25_16:12:38.077803 289.26876952053976
2024-01-25_16:12:38.178073 277.4050497103211
2024-01-25_16:12:38.277296 275.0399351500846
2024-01-25_16:12:38.377537 269.2034427675655
2024-01-25_16:12:38.477774 269.12714874949336
2024-01-25_16:12:38.577981 263.86286150251533
2024-01-25_16:12:38.677218 280.7238394964595
2024-01-25_16:12:38.777414 263.51953842119065
2024-01-25_16:12:38.877686 264.81653672841713
2024-01-25_16:12:38.977905 263.21436234890206
2024-01-25_16:12:39.077143 262.8710392675774
2024-01-25_16:12:39.177337 262.3369811410724
2024-01-25_16:12:39.277532 264.9691247645614
2024-01-25_16:12:39.377746 261.87921703263953
2024-01-25_16:12:39.477949 270.80561714708057
2024-01-25_16:12:39.577167 261.7647760055313
2024-01-25_16:12:39.677381 262.9854802946856
2024-01-25_16:12:39.777610 263.1380683308299
2024-01-25_16:12:39.877872 263.55768543022674
2024-01-25_16:12:39.977091 261.84107002360344
2024-01-25_16:12:40.077334 263.7484204754071
2024-01-25_16:12:40.177527 266.9527692344372
2024-01-25_16:12:40.277787 1665.7654435781892
2024-01-25_16:12:40.377997 400.009536752259
2024-01-25_16:12:40.477201 290.6420618458384
2024-01-25_16:12:40.577375 274.6203180506878
2024-01-25_16:12:40.677551 270.6148821019002
2024-01-25_16:12:40.777798 280.9527215506759
2024-01-25_16:12:40.878030 265.1217128007057
2024-01-25_16:12:40.977266 266.5331521350404
2024-01-25_16:12:41.077443 270.00452995732303
2024-01-25_16:12:41.177625 265.1217128007057
2024-01-25_16:12:41.277860 264.3206256109482
2024-01-25_16:12:41.377069 263.09992132179383
2024-01-25_16:12:41.477330 263.6339794482989
2024-01-25_16:12:41.577546 263.5958324392628
2024-01-25_16:12:41.677788 262.8710392675774
2024-01-25_16:12:41.777993 270.6148821019002
2024-01-25_16:12:41.877196 275.8028753308061
2024-01-25_16:12:41.977388 262.4895691772167
2024-01-25_16:12:42.077622 264.6258016832367
2024-01-25_16:12:42.177824 261.87921703263953
2024-01-25_16:12:42.278077 264.3206256109482
2024-01-25_16:12:42.377315 267.10535727058146
2024-01-25_16:12:42.477521 261.2307178790263
2024-01-25_16:12:42.577726 263.5958324392628
2024-01-25_16:12:42.677941 263.710273466371
2024-01-25_16:12:42.777144 264.1298905657678
2024-01-25_16:12:42.877338 261.49774694227875
2024-01-25_16:12:42.977566 263.48139141215455
2024-01-25_16:12:43.077775 262.9854802946856
2024-01-25_16:12:43.177979 263.710273466371
2024-01-25_16:12:43.277202 264.3969196290203
2024-01-25_16:12:43.377433 262.7947452495053
2024-01-25_16:12:43.477634 261.95551105071166
2024-01-25_16:12:43.577851 262.90918627661347
2024-01-25_16:12:43.677081 267.7920034332308
2024-01-25_16:12:43.777343 264.5495076651646
2024-01-25_16:12:43.877538 261.1162768519181
2024-01-25_16:12:43.977754 272.5603795627399
2024-01-25_16:12:44.077958 272.63667358081204
2024-01-25_16:12:44.177169 263.1380683308299
2024-01-25_16:12:44.277389 264.2824786019121
2024-01-25_16:12:44.377609 262.90918627661347
2024-01-25_16:12:44.477799 261.68848198745917
2024-01-25_16:12:44.578005 262.3369811410724
2024-01-25_16:12:44.677239 263.82471449347923
2024-01-25_16:12:44.777436 260.88739479770163
2024-01-25_16:12:44.877665 262.52771618625275
2024-01-25_16:12:44.977858 267.98273847841114
2024-01-25_16:12:45.077056 263.06177431275773
2024-01-25_16:12:45.177292 262.4132751591445
2024-01-25_16:12:45.277522 263.86286150251533
2024-01-25_16:12:45.377724 261.3833059151706
2024-01-25_16:12:45.477969 265.77021195431894
2024-01-25_16:12:45.577274 261.612187969387
2024-01-25_16:12:45.677519 261.53589395131485
2024-01-25_16:12:45.777778 263.09992132179383
2024-01-25_16:12:45.878032 262.29883413203635
2024-01-25_16:12:45.977265 263.6339794482989
2024-01-25_16:12:46.077470 273.2088787163531
2024-01-25_16:12:46.177713 263.4432444031185
2024-01-25_16:12:46.277913 265.7320649452829
2024-01-25_16:12:46.377089 268.2879145506997
2024-01-25_16:12:46.477306 261.95551105071166
2024-01-25_16:12:46.577546 261.2307178790263
2024-01-25_16:12:46.677803 263.4050973940824
2024-01-25_16:12:46.778007 263.86286150251533
2024-01-25_16:12:46.877242 261.49774694227875
2024-01-25_16:12:46.977440 263.48139141215455
2024-01-25_16:12:47.077612 261.3833059151706
2024-01-25_16:12:47.177856 260.8111007796295
2024-01-25_16:12:47.277050 261.99365805974776
2024-01-25_16:12:47.377250 262.68030422239707
2024-01-25_16:12:47.477465 262.60401020432494
2024-01-25_16:12:47.577657 261.53589395131485
2024-01-25_16:12:47.677876 262.26068712300025
2024-01-25_16:12:47.777047 262.0318050687838
2024-01-25_16:12:47.877248 262.3369811410724
2024-01-25_16:12:47.977420 263.6339794482989
2024-01-25_16:12:48.077659 261.87921703263953
2024-01-25_16:12:48.177825 261.53589395131485
2024-01-25_16:12:48.278037 262.0318050687838
2024-01-25_16:12:48.377240 261.7266289964952
2024-01-25_16:12:48.477480 261.91736404167557
2024-01-25_16:12:48.577690 264.0917435567317
2024-01-25_16:12:48.677915 270.00452995732303
2024-01-25_16:12:48.777119 271.30152826454946
2024-01-25_16:12:48.877386 261.1925708699902
2024-01-25_16:12:48.977643 263.4050973940824
2024-01-25_16:12:49.077843 262.3751281501085
2024-01-25_16:12:49.177044 261.87921703263953
2024-01-25_16:12:49.277281 272.2552034904513
2024-01-25_16:12:49.377482 262.68030422239707
2024-01-25_16:12:49.477686 262.8710392675774
2024-01-25_16:12:49.577895 263.0236273037217
2024-01-25_16:12:49.677122 262.4132751591445
2024-01-25_16:12:49.777317 269.81379491214267
2024-01-25_16:12:49.877524 261.4214529242066
2024-01-25_16:12:49.977745 261.68848198745917
2024-01-25_16:12:50.077962 260.9255418067377
2024-01-25_16:12:50.177168 262.10809908685593
2024-01-25_16:12:50.277370 261.87921703263953
2024-01-25_16:12:50.377620 273.3996137615335
2024-01-25_16:12:50.477829 260.6585127434852
2024-01-25_16:12:50.577037 262.10809908685593
2024-01-25_16:12:50.677279 261.078129842882
2024-01-25_16:12:50.777470 261.3451589061345
2024-01-25_16:12:50.877682 268.5549436139523
2024-01-25_16:12:50.977894 264.6258016832367
... 29982 more lines ...
|
| Attachment 26: image_00140.tif
|
| Attachment 27: image_00143.tif
|
|
533
|
Mon Aug 29 08:14:22 2022 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Linac commitionning | |
8h15 demarrage regulation température
8h45 chauffage Klystron
10H chauffage ready => machine prete
Phase max : 294 -> 290 -> 258 (12h30)
12h40 : Pause déjeuner
( remplacement des dosimètres d'ambiance ==> présence eau fosse nord: pompe de relevage à démarrer )
14h55 : phase de Qmax : 250
TL-SST01- H -1.37A -V 0.57
Alignement à l'oeil par rapport aux quads (Q1 Q2 Q3) Steerer Linac Str-1 (H -1.52A Str-V 0.37)
Valeurs Iris alligné : 5.9 / 3.51
|
|
Draft
|
Wed Sep 21 09:28:54 2022 |
VC | Under Process | Shift summary | Ring | Linac Commissionning |
|
Shift du jour | |
Demarrage modulateur et refroidissement 9h30.
Pb alim quad anneau (Ri-C2-QP6) (profibus 52)remplacement par alim quad EL-QP7 (profibus 16)
11h45 demarrage HT
Charge max (Iris at 2mm) 80pC phase 351
Energie max Charge ICT LI-0.1 64pC
chargé la recette LI-TL-RI_20220919-21_25_56.txt
TL-sst02 Phase section 105 pour minimiser la taille du faisceau
Courant DP 156.5A
faisceau sur SST TL0.3
Charge sur ICT/TL01 68pC
Charge sur ICT/TL02 la meme que sur ICT TL 01 (mesure non implémentée dans dans IHM charge)
entrée de l'anneau
DPI 7.57A
Septum 90V
=> signal sur RIC1-BPM02
Sauts sur TL/SST.02 : les sauts correspondent à une variation de courant de 1.5A sur 158 en nominal.
16H le modulateur est tombé 4 fois de suite (en 5mn)
|
| Attachment 1: E_vs_phase.png
|
 |
|
704
|
Mon Mar 6 09:09:52 2023 |
VC | Under Process | Problem | Linac Commissionning |
|
pB synchro suite | |
Test des signaux de "Timing" en calle de controle
1- la communication avec l'IHM admin_delays est instable à chaque commande, l'IHM "plante" et je suis obligé de la fermer et de relancer pour pouvoir changer de valeur de retard et ou plus d'1 mn pour pouvoir à nouveau changer de valeur!
2- en sdc le signaux de "timing" sont en phase (DEG 1=> 4 2=>4 3=>4 sdev 140ps) avec une fréquence anneau de 500MHz (rappel fréquence linac 2998.55MHz)
3- changement de la fréquance anneau 500.5MHz (dans l'igloo... je n'ai pas acces au scryp en salle de controle) pas de changement de comportement (sdev 140ps) (fin de manip retour à 500MHz)
pB resolu:
c'est une perturbation de la PLL*24 dans la trigger box => elle doit renvoyer du bruit à travers le 3GHz dans ERL 1 à travers le mélangeur.
nous avons déconnecté (alimentation) la PLL.
|
|
914
|
Mon Sep 16 09:15:24 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
demarrage modulateur 9H
pression SF6= 2.45mB
iris 1.3mm
difficulté pour passer à 1215V (chauffage nécessaire à 1205 volt pendant 10mn)
charge max 163°
iris 0.8mm pour une meilleure détermination du barycentre
Emax 113 ° Q = 50pC
script mesure position YAG-BPM: commitionning_scripts/Linac/Energie/Save_BPM_and_YAG_LT_values
vérif soléno
Icol 245
YAG X-Y 476 223
BMP X-Y 1.39 1.69
Icol 105
YAG X-Y 369 313
BMP X-Y 1.54 0.45
Icol 180
YAG X-Y 372 292
BMP X-Y 1.53 1.24
pB camera YAG TL1 => appel Nicolas => OK dipole allumé par défaut!!!!!
13h20 arret de tous les aimants anneau
perte de 10° de phase dans le canon
NOUVELLE PHASE 15h
valeur steerer alignement section
H1 0.63
H2 -3.85
V1 -1.05
V2 1.81
soleno 220A
YagLI 301 326
BMP 2.4 0.17
Soleno 250A
YagLI 487 309
BMP 2.4 0.33
oleno 190A
YagLI 600 336
BMP 2.45 -0.06
VÉRIF ALIGNEMENT SECTION AVEC NOUVELLE PHASE (102° Emax)
LE FASCEAU SAUTE DE 1 MM SUR TL01
LA PHASE CANON À PERDU 14° (ON VA TOUT PETER DIT MARIE)
MAJ du code avec cette fois ci boucle sur la positions entrée et sortie section plutot que les steerers
on doit choisir les points les plus intéressants, demain après peut-etre un coup de trend pour voir les stabilités.
|
|
959
|
Wed Nov 13 08:26:05 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 13/11/24 | |
demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Température canon pas optimale: 31.6°C le reflichi cann remonte en fin de pulse nouvelle consigne à 31.8°
Etude transmission charge à travers section en fonction de Col02n
( Q_transport_vs_Soleno.png =>faisceau non centré dans la section (recette # good_injection_no_good_storage )
Centrage faisceau dans la section ref Elog Commitionning 917_1
srt1 [H,V] 1.50 , -1.57
srt2 [H,V] -3.83 , 2.37
Etude transmission charge à travers section en fonction de Col02n (Q 50pC 100pC 205pC 280pC)
Centrage faisceau dans la section ref Elog Commitionning 917_2
srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16
Etude transmission charge à travers section en fonction de Col02n (Q 180pC, 100pC)
Attention alignement 917_2 très mauvais du point de vue de la charge
comparaison charge BPM ICT ==> gros probleme de lecture sur les BPMs somme....
Voir trends en pj dans lesquels on fait varier l'atténuation du laser, et on regarde les variations de charge et du signal Spsum.
Autour de 80pC de charge le signal Spsum fait des sauts pour ensuite à environ 90 pC de charge baisser d'environ 50% ...
Note : la charge a diminué pendant le shift passant de 300 pC à 420 degrés d'atténuation sur le laser à 160 pC .... Il faut monitorer l'energie du Laser ...
Mesures de la taille en fonction du Soleno : /data/shared/mesure/today/Taille_Soleno/
|
| Attachment 1: Q_transport_vs_Soleno.png
|
 |
| Attachment 2: Q_transport_vs_Soleno_Align_917_1.png
|
 |
| Attachment 3: Q_transport_vs_Soleno_Align_917_2.png
|
 |
| Attachment 4: ICT_Att_320_to_400.png
|
 |
| Attachment 5: SPSum_LI_Att_320_to_400.png
|
 |
|
969
|
Wed Nov 27 08:04:44 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 27/11 | |
8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)
9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Q max ICT1 120pC (att 340 iris 1.3mm)
Phase Emax 178°
Phase section 209°
Esectionkin 51.25MeV
Recette Operation_500_0913MHz241116_10_07_15
test quad scan
le soft matlab QP1_TLSST1_thomx_dark_dim n'est pas fiable
=> nouveau script python Quad scan (dans commintionning scrits\linac\aimants )
Isoleno : 220 et 235A : data à analyser
Test aimant néodynium sur tube faisceau :
Qmax pas de soléno pas de steerer
mesure 1
sans aimant
------ YAG Max proj. Pixels -----
YAG X : 503.4 +/- 0.48989794855663565
YAG Y : 314.5 +/- 2.29128784747792
------ BPMs en mm -----
BPM X : 1.8827291000000002 +/- 0.058164067948261663
BPM Y : 0.44133750000000005 +/- 0.021049867535212655
On a vérifé la deviation du faisceau avec l'aimant placé sur la bride avec COL2. trop puissant mais on a le principe. |
| Attachment 1: QP1_scan.png
|
 |
| Attachment 2: QP2_scan.png
|
 |
| Attachment 3: QP3_scan.png
|
 |
|
973
|
Wed Dec 4 10:54:28 2024 |
VC | Fixed | Fix | SY |
|
Frequence anneau et systeme de synchro | |
Rappel:
la fréquence de l'anneau doit etre modifiée avec l'insterface RING RF cavity :
Ring RF doit etre divisible par 15 à 5 chiffres après la virgule (cela fait des pas de 150Hz sur le 500MHz) c'est la limite du matériel qui sert pour la synchro (toutes les solutions de fréquence ne répodant pas à cette limite ne sont pas des solutions viables pour la machine)
en cas de changement de fréquence il faut vérifier que le timing (répétion de la marchine 25 10 ou 1Hz )soit stable sur l'oscilloscope .
si ce n'est pas le cas il faut changer la phase du générateur Rigol 33MHz avec le script (commande) ./phase_shifter_rigol.py --phase "value" (value = nombre) (dans panneaux/synchro)
si cela ne fonctionne pas (pas de solution timing stable ) prévenir l'équipe synchro
Fréquence Ring actuelle 500.09595 MHz => /15= 33.33973MHz
|
|
983
|
Wed Dec 18 08:37:08 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
summary shift Dec 18 | |
demarrage chauffage 8h45
le modulateur refuse de passer en mode standby
Nouvelle position laser photocathode : [6.374, 3.360]
Phase Qmax : 222 --> Phase Emax : 172
Energie : 51.98 MeV
Mesures Quad Scan vs Soleno à 50 MeV, Taille Iris (1 point uniquement) et @ QP7.
Charge : d'abord mieux puis decroit avec un max à 420 deg d'attenuation.
18h30 fin
|
|
572
|
Mon Oct 3 12:51:26 2022 |
Slava, Viktor M, Iryna | Fixed | Problem | Ring Commissioning |
|
Check the QUADs in the ring | |
On last Friday, we found that there is a potential problem with QUAD 9, 10 an 12 as by switching them OFF, we obtained better transport and finally had the evidance of the seconf full turn.
RI-C2/PS/QP.09
RI-C2/PS/QP.10
RI-C2/PS/QP.12
Today, we checked the polarity and found that the polarity of the RI-C2/PS/QP.10 was inversed at the level of power supply (even though was checked last time in July). We have restore the good polarity of the RI-C2/PS/QP.10 by swapping the cables at the PS.
We plan to check the beam transport in the afternoon. |
|
280
|
Wed Jan 26 15:30:47 2022 |
STT (HG) | Not Fixed | Linac | Linac Commissionning |
|
Démarrage faisceau --> run allignement | |
Démarrage modulateur :
15h30 soucis pour le démarrage du modulateur : toutes les sécurités donnaient accèes au démarrage RF (MPS, PSS) donc aucun signal d'erreur mais pas de signaux RF à cause du PA qui était éteint.
Il a fallut arreter le modulateur et JN a vu que ça avait disjoncté (Il fallait ouvrir le modulateur pour réarmer).
17h00 : tout semble ok maintenant au niveau du modulateur hormis des interlock qui arrivent de temps en temps faisant tomber la HV.
Redpytata : Assez instables, il a fallut les redémarrer en hard plusieurs fois. Il faudra comprendre d'ou peut venir cette instabilité (du Ds ou de la carte ?)
17h15 : carte RPY 1 (baie 17) ne redémarre pas en soft --> redémarrage en hard

Laser :
Laser non centré dans l'iris

Réglages sur M5 :
X pos : 1.420
Y pos : 1.070
Nouvelles positions :
X pos : 1.290
Y pos : 1.010

17h30 : Stabilité laser :
- mean x 6664.16 µm +/- 44.05 µm
- mean y 3429.02 µm +/- 51.24 µm
- FWHM x 1817.25 µm +/- 173.65 µm
- FWHM y 1084.71 µm +/- 57.71 µm
Charge phase :

Charge max : 159° de phase environ (affiné en voyant le spot du faisceau sur le Yag1)
Allignement du Laser a certainement bougé car on voit qu'à la charge max le faisceau est un peu moins bien focalisé.
En effet on le voit lorsqu'on fait bouger la phase autour de la phase de charge max et qu'on regarde le mouvement du barycentre en fonction de la phase.

En Y c'est quasiment bon mais pas en X.
On va jouer sur les moteur M4 du mirroir laser photocathode pour alligner plus finement.
positions initiales de M4 :
X : 145
Y : 5420
18h10 : on lance les scans sur X puis sur Y.
X entre 100 et 200
meilleure position : 200
Yag1 @ 153°
18h40 : Dérive de phase --> Phase de charge max est passé à 153 (contre 159°) --> 19h10 : 152° --> 20h00 : 158°
Position BPM de réference = position sans solénoide à charge max (à énergie max, le faisceau est fortement divergent sans solénoide et la position est moins bien définie. c'est pour cela qu'on prend la position de référebce à charge max)
- X_BPM_Ref 0.59 +/- 0.12 mm
- Y_BPM_Ref 2.00 +/- 0.31 mm
apres 30 min
- X_BPM_Ref 0.76 +/- 0.14 mm
- Y_BPM_Ref 2.77 +/- 0.13 mm
Allignement solénoide
Allignement compliqué compte tenu du fait que la phase semble instable.

|