938
|
Tue Oct 8 15:29:17 2024 |
VC MJ HG JN | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | | Pas de charge (20 pC Q max) car shutter
PSS orange
Apres plus de 30 minutes : shutter |
7x |
|
932
|
Thu Oct 3 08:27:17 2024 |
VC MJ HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | | 8h30 demarrage chauffage
pB de vanne vide (qui est fermée
et en mode local...) |
|
|
989
|
Tue Jan 7 08:40:58 2025 |
VC MJ HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 07/01/25 | | demarrage machine 8h30
pB serveurs/IHMs
vide (peg) (pas de communication) |
|
|
924
|
Fri Sep 27 08:26:14 2024 |
VC MJ | Under Process | Problem | SY |
|
pB synchro | | mise en chauffe machine => synchrro
OK
=> frigo en marche => synchro |
6x |
|
928
|
Mon Sep 30 09:52:38 2024 |
VC MJ | Under Process | Problem | Linac Commissionning |
|
remise en route d'une synchro valide | | 9h50 démarrage chauffage Klystron
la sortie d'urgence porte casemate
a été appuyé ce matin.... |
|
|
954
|
Wed Nov 6 08:06:51 2024 |
VC MJ | Under Process | Shift summary | Linac Commissionning |
|
shift | | demarrage chauffage 8h
autorisation PSS zone modulateur
interdite => il faut venir valider la |
  |
|
976
|
Fri Dec 6 11:11:31 2024 |
VC MJ | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Installation du PM dans la X-hucth | | Le PM est installe dans la X-hutch (PM
+ gene + ocsillo), on a test que ca
fonctionne - |
|
|
910
|
Wed Sep 11 08:39:18 2024 |
VC KD | Under Process | Shift summary | Linac Commissionning |
|
Commisionning linac set 2024 | | 8h30 démarrage chauffage modulateur
9h: mise en chauffe laser, chiller
et remise SF6 (2.4bars --> 2.6bars) |
|
|
931
|
Wed Oct 2 08:08:52 2024 |
VC HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | | demarrage chauffage 8h10
visite étudiant M2 =>
visite fini |
|
|
834
|
Thu Jan 25 08:49:29 2024 |
VC DN ND, IC, VM, KD, AS RC , VK... | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
commitionning | | 8h45 demarrage chauffage Modulateur et
frigo
Pb sur le serveur li/opt.02-las.01-asp.01 |
27x |
|
533
|
Mon Aug 29 08:14:22 2022 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Linac commitionning | | 8h15 demarrage regulation température
8h45 chauffage Klystron
10H chauffage ready => machine |
|
|
Draft
|
Wed Sep 21 09:28:54 2022 |
VC | Under Process | Shift summary | Ring | Linac Commissionning |
|
Shift du jour | | Demarrage modulateur et refroidissement
9h30.
Pb alim quad anneau (Ri-C2-QP6) |
|
|
704
|
Mon Mar 6 09:09:52 2023 |
VC | Under Process | Problem | Linac Commissionning |
|
pB synchro suite | | Test des signaux de "Timing"
en calle de controle
1- la communication avec l'IHM |
|
|
914
|
Mon Sep 16 09:15:24 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | | demarrage modulateur 9H
pression SF6= 2.45mB
iris 1.3mm |
|
|
959
|
Wed Nov 13 08:26:05 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 13/11/24 | | demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC |
    |
|
969
|
Wed Nov 27 08:04:44 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 27/11 | | 8h : mise en chauffe (laser, modulateur,
frigo, chiller, cyclage)
9H30 y'a eu une intervention |
  |
|
973
|
Wed Dec 4 10:54:28 2024 |
VC | Fixed | Fix | SY |
|
Frequence anneau et systeme de synchro | | Rappel:
la |
|
|
983
|
Wed Dec 18 08:37:08 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
summary shift Dec 18 | | demarrage chauffage 8h45
le modulateur refuse de passer
en mode standby |
|
|
572
|
Mon Oct 3 12:51:26 2022 |
Slava, Viktor M, Iryna | Fixed | Problem | Ring Commissioning |
|
Check the QUADs in the ring | | On last Friday, we found that there is
a potential problem with QUAD 9, 10
an 12 as by switching them OFF, we obtained |
|
|
280
|
Wed Jan 26 15:30:47 2022 |
STT (HG) | Not Fixed | Linac | Linac Commissionning |
|
Démarrage faisceau --> run allignement | | Démarrage modulateur :
15h30
soucis pour le démarrage du modulateur
: toutes les sécurités donnaient |
7x |