  4   Tue May 28 15:07:37 2019 Entered by Aurélien Martens from 134.158.88.183 on Tue May 28 15:07:25 2019FixedInfoTango Photocathode laser DS back operational icon7.gif 

Following:

1) a crash on 4th of April and a violent reboot of the ELLiOOs embeded machine

2) the need to recover the whole database files in the ELLiOOs embeded machine

the ElliOOs sofware was running back quickly. Though recently (in terms of working and available days) was reported that the tango DS was not communicating.

The reason why stayed misterious.

Following calls to Amplitude Laser (Vianney) last week and, today, a callabck from SCARELL (Romain and Jean-François), it is now understood that :

- the content of the data repository corresponding to the Tango gateway was not dynamically created (~/bin/ElliOOs/User/Data/28*/*). The specific file that was missing since the 5th of arpil reeboot was Plugin.sml.

Recovering this file and properly rebooting the embedded machine (from the ElliOOs programme running on the HOST, in the System Info --> reboot embedded), allowed to revoer the com.

Indeed it was checked by looking at jive by Falcoz.

An archive of the Code repository was done in case it is required to recover these files again. Archive sent to SCARELL.

Please remember to reboot the embeded in case there is a reoboot of TANGO machine in the main control room or if the database is reset.

Please also note that trying to look at the content of the TANGO_HOST variable in superuser or default user will not help in understanding if tango is running locally.

 

  3   Tue Oct 18 15:12:24 2016 Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 15:12:09 2016Under ProcessShift summaryresumes   

test

Attachment 1: 2014-05-15_Conditionnement_circulateur_RF_et_canon_PHIN.pptx
  2   Tue Oct 18 14:25:34 2016 Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 14:25:09 2016Not FixedShift summaryPrise de donnees test de log 

jeudi 18 octobre

il faudrait mettre un place un canevas type pour un point de fonctionnement que l'on reconduirait tous les jours dans lequel on noterais quelques paramètres à la main...

laser :  Elaser =  xx µJ   taille x = 1.1 mm tailley = 1.3 mm

puissance RF : Prc = 20 mV

 

etc..