1157
|
Tue Nov 25 09:32:03 2025 |
Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025 | Under Process | Shift summary | Diag | Ring Commissioning |
|
| | 09h31 Warm-up ThomX: Modulator, Laser, Fridge
09h36 Chillers were started, cycling all magnets.
09h56 Unable to start MRSV and EL cameras. Need help.
10h33 HV is ON
10h40 HV set to 1215 V
11h24 Beam in the ring W/O RF
11h40 RF 100 kV, phase 3.7 dg. RF Gun phase 210 dg., Sect Att. 2.37 dB, Sect. phase 211 dg., Charges (BPMs) -161, -153, -158, -169 pC, Linac steerers H [0.88 -3.00], V [-2.52 3.08]. Receipt recipe_recipe_LI_TL_RI_good_20251106_16_23_16.txt
12h35 Vacuum interlock V1, restarted
Orbit correction, check with BBA and LOCO after adjusting the device indeces in MML.
16h46 Going to 70 MeV T sect. consigne 28.5ºC, Sect. Att. 0.137 dg., DP 255.8 A, TL/BPM02 X=-1.5 mm,
As it was discussed before, the dipoles for unknown reasons were set to - 2A from nominal current in the saved receipt. We changed the current to the nominal one. Beam tuning ongoing for 70 MeV.
recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt W/O correctots in the ring, Manual phase shifter 6129, RF phase 14 dg.
to be continued.
18h40 Stop thomx |
|
1163
|
Fri Dec 5 08:31:59 2025 |
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025 | Under Process | Shift summary | Ring Commissioning |
|
| | 08h31 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets.
10h07 HV is ON
10h09 HV set to 1215 V
10h330 Beam is in the ring 70 MeV |
|
1166
|
Wed Dec 10 10:45:33 2025 |
Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025 | Under Process | Shift summary | Linac Commissionning |
|
| | 8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
--> try power off
Worked 
Ajusterment retard camera : -20 µs / Gain 0 / exp 0.001s
Viktor : dispersion measurement.
Q-scan QP7, QP3
|
|
Draft
|
Fri Jan 16 08:29:33 2026 |
IC, VM, ND | Under Process | Shift summary | |
|
| | 08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl : recipe_recipe_TL_all_20260116_10_52_12.txt, recipe_recipe_LI_TL_straight_all_20260116_10_51_52.txt. Linac steerers: H [0.59 -2.74], V [-2.48 3.06]
RF Gun phase 140 dg. Sect. Att. 2.523 dB, Sect. phase 190 dg. Laser att. 409, charges (BPMs): -100, -95, -98, -98 -97 pC , RF 100 kV, phase -8.5 dg. The MRSV camera dozs not operate.
11h44 Problem with cameras
All triggers dissapeared
Nicolas fixed it, but phases is different: RF gun phase 96 dg., sect phase 203 dg. RF cav. phase?
12h50 Laser phase jumped to 171 dg. Sect. phase ==> 210 dg. Manual phase shifter set back to 1176. The laser att. ==> 359 for RF gun charge -115 pC (BPM)
Ring studies Model-Machine
From time to time laser fase jumps.
Triggers stopped. Nicolas is looking at it.
14h40 Beam dissapears in between the studies. Every time we retune the linac...
No triggers!!!!
18h04 LOCO is on its way. Time to times the laser loses phase synchronization. It's terrible.
18h20 We've lost laser synchronization.
18h21 Stop ThomX
|
| Attachment 1: Screenshot_from_2026-01-16_18-28-24.png
|  |
| Attachment 2: Screenshot_from_2026-01-16_13-22-12.png
|  |
| Attachment 3: Screenshot_from_2026-01-16_13-23-01.png
|  |
| Attachment 4: Screenshot_from_2026-01-16_13-31-16MODEl.png
|  |
| Attachment 5: Screenshot_from_2026-01-16_16-02-15LOCO_1it.png
|  |
|
Draft
|
Tue Jan 20 08:35:56 2026 |
VM, ND, VC | Under Process | Shift summary | |
|
| | 08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON
10h12 The receipt loaded: recipe_recipe_LI_TL_RI_all_20260116_14_22_26.txt. Beam is in the ring W/O RF
RF gun phase 40 dg., Sect. Att. 2.556 dB, Sect. phase 207 dg., Linac steerers: H [0.58 -2.83], V [-2.48 2.94], charges (BPMs): -125, -119, -121, -122, -119 PC, the laser att. 359
10h38 RF 100 kV, phase -4 dg., manual phase shifter was adjusted.
10h54 RI_C1 Quads were stoped to chec dispersion at injection
13h00 Triggers stoped, after that was fixed the laser phase jumped to 202 dg. sect. phase 206 dg.
15h39 Mod. standby
17h20 HV is on
18h01 Stop ThomX |
|
1189
|
Fri Feb 6 08:26:41 2026 |
Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026 | Under Process | Shift summary | RF D1 |
|
| | 08h25 Warm-up ThomX: Modulator, Laser, Fridge
08h33 Chillers were started, cycling all magnets.
09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9
09h33 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1030 V Interlock
09h39 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1050 V Interlock. Something wrong
10h20 HV 1050 V. Maher is here. Interlock by reflected power to the klystron.
10h26 Modulator is on standby.
10h29 HV is on W/O RF. HV 1215 V. All is OK.
10h34 Modulator is on standby.
10h57 HV is on, 1030 V
11h09 HV is 1050 V
11h35 50pps, 1030V
11h42 1040 V interlock
11h45 Modulator is on standby.
16h10 Stop ThomX
|
| Attachment 1: Screenshot_from_2026-02-06_10-52-58.png
|  |
|
1196
|
Fri Feb 20 07:54:25 2026 |
IC, VM | Under Process | Shift summary | Ring Commissioning |
|
| | 7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)
08h57 HV is on
09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
09h25 RF 100 kV
09h42 F gun phase 23 dg., Sect. att. 2.47 dB, Sect. phase 218 dg., charges (ICT): about -100 pC, charges(BPMs): all -105 pC
The receipt saved: recipe_recipe_LI_TL_RI_all_20260220_10_42_56.txt ==> Vert. around IP +3 mm to -2 mm
The receipt saved: recipe_recipe_LI_TL_RI_all_20260220_10_43_52.txt==> Vert. around IP -1 mm to +1 mm
12h17 Standby
13h31 HV is on. Shunt resistors were removed from the dipoles
14h28 Standby. Shunt resistors of 15.4 Ohm installed
15h09 HV is on. Charge dropped. Laser att. 244 ==>260 to restore 100 pC
|
| Attachment 1: Screenshot_from_2026-02-20_16-34-18.png
|  |
| Attachment 2: Screenshot_from_2026-02-20_16-15-37.png
|  |
| Attachment 3: Screenshot_from_2026-02-20_12-00-27.png
|  |
|
Draft
|
Thu Feb 26 08:18:00 2026 |
IC, VM | | | |
|
| | 08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on
RF gun phase 78 dg. Sect. Att. 2.56 dB, sect. phase 219 dg. RF 50 kV. Linac steerers: H [-0.36 -2.65], V [-2.49 3.24].
Scan ring RF frequency.
16h40 ThomX stopped |
|
Draft
|
Fri Mar 6 09:00:45 2026 |
VM | Under Process | Shift summary | |
|
| | 09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on
10h08 The laser att. 300 ==> 274 to set the gun charge to -100 pC |
|
Draft
|
Fri Mar 6 10:44:11 2026 |
VM, HG, JN | Under Process | Shift summary | RF D1 |
|
| | 09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on
10h08 The laser att. 300 ==> 274 to set the gun charge to -100 pC
10h53 beam is in the ring. Laser phase 101 dg., Sect. Att. 2.533 dB, sect. phase 223 dg. (mot. pos. 1710. 223-60 dg. mot. pos. 1254 )
11h34 Breakdowns in the gun. Low SF6 pressure (2.2 bar)
13h38 Jean-Noel fixed it
13h48 HV is on
14h41 Gun charge is very ubstable and low. Breakdowns in the gun.
15h06 RF gun att. 3 dB
15h10 RF gun att. 2 dB
15h13 RF gun att. 1.5 dB
15h16 RF gun att. 1 dB. Can't move on.
15h19 Shutter was closed
15h24 RF gun att. 0.8 dB
15h28 RF gun att. 0.4 dB
15h29 RF gun att. 0.2 dB, breakdowns, go back to 2 dB
15h51 50 pps 2 dB
16h02 It gets worse
16h03 12.5 pps.
16h25 RF gun att. 0.5 dB
17h00 RF gun att. 0.8 dB
17h53 RF gun att. 0.0 dB, pulse width 2 us, breakdowns
17h58 RF gun att. 0.0 dB, pulse width 2.7 us, dark current 30 mV, solenoid off
18h00 RF gun att. 0.0 dB, pulse width 3 us, dark current 30 mV (it used to be around 18)
18h17 The laser spot on the cathode, the solenoid on, charge is low. There are breakdows at the new spot position.
18h20 ThomX was stopped
|
| Attachment 1: Screenshot_from_2026-03-06_18-22-28.png
|  |
|
Draft
|
Fri Mar 13 08:33:25 2026 |
Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026 | | | |
|
| | 08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chillers were started, cycling all magnets
09h48 HV is ON
10h42 There was a problem with "Camera Laser". Restarted li/op/las.02 server by killing it
12h26 Beam is in the ring, RF 100 kV, phase -42 dg. Laser phase 163 dg. Sect att. 2.57 dB, Sect. phase 221 dg. Laser att. 324, Charge oscillating around -120 pC. Feedback laser PID coefficients were changed: P=0.5,I=0.02, D=0.05 to get more stable laser spot position (Old: P=0.7,I=0.01, D=0.1 ).
18h27 ThomX was stopped |
|
Draft
|
Thu Mar 26 07:39:02 2026 |
IC, VM, DN, MJ | Under Process | Shift summary | |
|
| | 7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
==> 70 MeV, F=500.031645 MHz
11h20 Beam is in the ring. recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted
11h21 Laser Phase 54.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.197 dB, I_Gun -96.9629 pC, I_Linac -144.3734 pC, I_TL -126.6061 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.
|
| Attachment 1: MRSV_Size_vs_LaserPhase.png
|  |
| Attachment 2: HorOrbit_vs_LaserPhase.png
|  |
| Attachment 3: MRSV17h38.png
|  |
| Attachment 4: DispersionAfterLOCO20260326_16h54.png
|  |
| Attachment 5: 20260326_18h24_TL_Dispersion.png
|  |
|
Draft
|
Thu Apr 2 07:55:49 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h58 HV is ON
recipe_recipe_LI_TL_RI_all_20260326_09_09_20.txt loaded
09h20 Laser Phase 83.1 dg., Sect. Phase 212 dg., Sect. Att. 2.397 dB, I_Gun -81.8326 pC, I_Linac -86.4815 pC, I_TL -93.017 pC RF_Ampl. 0 kV, RF_Phase -47.91 dg.
15h29 Laser Phase 97 dg., Sect. Phase 224 dg., Sect. Att. 2.417 dB, I_Gun -100.8297 pC, I_Linac -125.7466 pC, I_TL -113.6521 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
18h23 Laser Phase 97 dg., Sect. Phase 224 dg., Sect. Att. 2.507 dB, I_Gun -103.7883 pC, I_Linac -128.9273 pC, I_TL -117.0162 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
|
|
Draft
|
Thu Apr 9 08:11:33 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 8h10 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
09h12 HV is ON
recipe_recipe_TL_all_20260408_17_18_54.txt loaded
10h25 Energy = 50 MeV, Laser Phase 76 dg., Sect. Phase 224 dg., Sect. Att. 2.52 dB, I_Gun -95.9713 pC, I_Linac -118.9236 pC, I_TL -16.394 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg.
datetime(datestr(TimeNum(1),'yyyy-mm-dd_HH:MM:SS.FFF'),'InputFormat','yyyy-mm-dd_HH:MM:ss.SSS','Format','yyyy-mm-dd_HH:MM:ss.SSS') |
|
Draft
|
Fri Apr 10 07:39:37 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h43 HV is ON
recipe_recipe_LI_TL_RI_all_20260409_17_07_05.txt loaded
09h00 Energy = 50 MeV, Laser Phase 63 dg., Sect. Phase 217 dg., Sect. Att. 2.49 dB, I_Gun -86.2367 pC, I_Linac -110.0622 pC, I_TL -100.1516 pC RF_Ampl. 48.9051 kV, RF_Phase -35 dg.
09h25 standby, adding SF6 pressure
09h33 HV
10h43 Energy = 50 MeV, Laser Phase 116 dg., Sect. Phase 233 dg., Sect. Att. 2.45 dB, I_Gun -90.9374 pC, I_Linac -114.4855 pC, I_TL -104.2454 pC RF_Ampl. 148.7161 kV, RF_Phase -32 dg.
17h01 Energy = 50 MeV, Laser Phase 97 dg., Sect. Phase 240 dg., Sect. Att. 2.406 dB, I_Gun -100.3151 pC, I_Linac -127.6278 pC, I_TL -114.2449 pC RF_Ampl. 148.7161 kV, RF_Phase -41 dg.
|
|
Draft
|
Mon Apr 20 10:37:11 2026 |
IC | | Shift summary | |
|
| | 10h30 : mise en chauffe (frigo/chillers, modulateur, laser, cyclage)
All rondes are broken, THOMX key is turned. What is the reason of this intervention?, There is nobody around. Jean-Noel came and helped to solve the problems.
Help is needed to set up everythiing (rondes sous-sol, PSS....) and tune the photocathode laser. |
|
Draft
|
Wed Apr 22 10:26:28 2026 |
IC,VM | | | |
|
| | Dalkia solved the problem with vooling circuit in the morning
10h15 mise en chauffe (frigo/chillers, modulateur, laser, cyclage)
11h16 HV is ON
11h57 Energy = 50 MeV, Laser Phase 54 dg., Sect. Phase 215 dg., Sect. Att. 2.34 dB, I_Gun -90.3427 pC, I_Linac -115.8595 pC, I_TL -104.0088 pC RF_Ampl. 148.7161 kV, RF_Phase -45 dg.
15h01 Energy = 50 MeV, Laser Phase 35 dg., Sect. Phase 218 dg., Sect. Att. 2.456 dB, I_Gun -101.8359 pC, I_Linac -120.7055 pC, I_TL -114.6878 pC RF_Ampl. 148.7161 kV, RF_Phase -49.5 dg.
18h04 Energy = 50 MeV, Laser Phase 27 dg., Sect. Phase 216 dg., Sect. Att. 2.421 dB, I_Gun -98.616 pC, I_Linac -120.8228 pC, I_TL -14.2993 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg.
20h13 Energy = 50 MeV, Laser Phase 28 dg., Sect. Phase 216 dg., Sect. Att. 2.481 dB, I_Gun -110.7257 pC, I_Linac -129.583 pC, I_TL -123.6972 pC RF_Ampl. 148.7161 kV, RF_Phase -33.5 dg.
|
|
Draft
|
Thu Apr 23 09:06:22 2026 |
IC, VM | | | |
|
| | 9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage) |
|
Draft
|
Tue Jun 9 10:13:24 2026 |
Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026 | | | |
|
| | 10h02 Start-up modulator, laser, fridge, chillers
The SF6 pressure is low. Magnet power supplies filed to start.
11h17 Stop ThomX
|
|
1247
|
Tue Jun 16 13:43:30 2026 |
Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 | | Fix | LI |
|
| | Hello,
I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time , need 45 min, you can start at 14:35
Maher |
|