ID Date Author Status Type Category Important Subject Icondown Text Attachments
  1194   Wed Feb 18 07:40:44 2026 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 18 février 2026 7h40: mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

8h40 HV ON
 Quads_settings_after_match.md 
  Draft   Thu Feb 19 07:32:42 2026 KD, VM, RC, MJ, IC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 19 fevrier 2026 7h30: mise en chauffe en remote (chillers/frigo,
modulateur, laser, cyclage)

08h55 HV is ON
 Screenshot_from_2026-02-19_16-50-44.pngScreenshot_from_2026-02-19_16-03-44.pngScreenshot_from_2026-02-19_16-03-32.png 
  1196   Fri Feb 20 07:54:25 2026 IC, VMUnder ProcessShift summaryRing Commissioning   7h50: mise en chauffe en remote (chillers/frigo,
modulateur, cyclage)

08h57 HV is on
 Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png 
  Draft   Mon Feb 23 09:43:36 2026 IC    Ring studies 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)

HV ON
  
  1198   Tue Feb 24 07:38:01 2026 KD, VM, RC, MJ, ICUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 24 fevrier 2026 7h40: mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

 
 7x 
  1199   Wed Feb 25 07:29:16 2026 KD MJ DN VK ICUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning 25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT 7h30: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

***
  
  Draft   Thu Feb 26 08:18:00 2026 IC, VM      08h15: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

08h15: mise en chauffe en remote
  
  Draft   Fri Feb 27 08:00:46 2026 IC, VMUnder ProcessUrgentLaser , entered from 127.0.0.1 07h55: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

09h00 HV is on
 Screenshot_from_2026-02-27_10-25-37.png 
  1202   Wed Mar 4 08:35:23 2026 VM, MJ, DN, RCFixedShift summaryLinac Commissionning | Ring Commissioning Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 08h35 Warm-up ThomX: Modulator, Laser,
Fridge

Programme
 7x 
  Draft   Fri Mar 6 09:00:45 2026 VMUnder ProcessShift summary    09h00 Warm-up ThomX: Modulator, Laser,
Fridge

09h05 Chillers were started, cycling
  
  Draft   Fri Mar 6 10:44:11 2026 VM, HG, JNUnder ProcessShift summaryRF D1   09h00 Warm-up ThomX: Modulator, Laser,
Fridge

09h05 Chillers were started, cycling
 Screenshot_from_2026-03-06_18-22-28.png 
  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  
  1207   Wed Mar 11 08:03:48 2026 KD, VM, MJ, RCUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 11 mars 2026 - TRANSFOCATEUR 8h: mise en chauffe en remote (cyclage,
modulateur, laser, frigo/chiller)
clients et réseau très
 diode_calib_2026-03-11_14-07-08.pngdiode_calib_2026-03-11_14-08-13.png 
  1208   Wed Mar 11 18:12:23 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026Under ProcessShift summaryLI Emittance vs Iris Some Quad scans with variying the Iris
opening.

Data :
  
  Draft   Thu Mar 12 07:57:41 2026 KD, VM, MJ, RC, DNUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 12 mars 2026 8h: mise en chauffe de la machine en remote
(modulateur, laser, frigo/chillers, cyclage)

*** Programme ***
  
  1210   Thu Mar 12 15:17:49 2026 MJ, KDFixedShift summaryLinac Commissionning | Ring Commissioning MONOCHROMATEUR - 12 mars 2026 Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2
0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20
  
  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  1212   Sun Mar 15 18:42:53 2026 MJ HG VKFixedShift summaryLinac Commissionning | Ring Commissioning Etudes de points MATCHING - 13 mars 2026 Programme :
Etudes points Matching
==============================
  
  1213   Tue Mar 17 08:07:49 2026 KD MJ RC DN VKUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 8h05 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

*** programme : Mesures
  
  1214   Wed Mar 18 07:58:19 2026 KD, VM, MJ, RC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 18 mars 2026 8h: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

*** Programme : Mesure
 8x 