  929   Tue Oct 1 08:45:59 2024 SC-VC-HG-ND-IC-VM-VK LinacLI | Ring | Linac Commissionning Beam transport up to the ring 8h45 Mise en chauffe refroidissement et
modulateur

9h visite
 8x 
  637   Thu Dec 1 01:14:36 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022New SolutionShift summaryRing | Diag Beam time / Thursday 1st December 

9:10 Il y a quelqu'un de DEKRA
qui deambule seul dans l'IGLEX sans dosimetre.
 11x 
  1057   Wed Apr 16 13:48:05 2025 Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025Under ProcessShift summaryLI Beam study  Mesures du jour : prendre des images pour
refaire le calcul d'émittance
en tenant compte des corrélations
 Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png 
  Draft   Tue Apr 14 08:03:01 2026 IC,VM Shift summaryLinac Commissionning | Ring Commissioning Beam studies. preparation for 40 MeV 8h00 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

10h Problem with modulator; It
  
  1186   Thu Jan 22 07:37:58 2026 IC, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Beam studies 7h45: mise en chauffe en remote (modulateur,
laser, frigo/chillers)

08h41 HV is on
  
  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored Shift started at 18h

With the current injector settings,
it was difficult to inject.  We loaded
 6x 
  101   Fri Oct 8 16:59:37 2021 Entered by HG, SC et MO from 134.158.195.142 on Fri Oct 8 16:59:22 2021Under ProcessLinacLinac Commissionning BPMs Travail sur les BPMs en cours   
  130   Thu Oct 28 10:45:34 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 10:45:21 2021FixedInfoDiag BPMs On visualise le faisceau sur les BPMs via
l'interface BPM adc viewer
  
  139   Thu Oct 28 17:13:35 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:13:21 2021Under ProcessLinacDiag BPMs Passage à 1 Hz pour transport faisceau
avec bobine de foc pour test sur les BPMs
en bougeant les steerers
  
  608   Wed Oct 26 14:13:16 2022 Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:13:01 2022 UrgentLinac Commissionning BPM TL 2, 3 et 4 ? Les BPM TL 2 3 et 4 ont l'air fige
. Les valeurs sur 'ihm sont totalement
figees ...
  
  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? Aujourd'hui Iriya m'a montre en
salle de controle une "etendue"
de ~4mm de l'orbite du faisceau mesuree
  
  1154   Thu Nov 20 09:26:33 2025 VM, ICUnder ProcessUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning BBA Ring Goal: Ring BBA

09h14 Unable to start thomx. Need
help. Probably problem with cooling water.
 Errors.jpegScreenshot_from_2025-11-20_14-04-53.png 
  Draft   Thu Sep 11 08:49:20 2025 IC, VM  Ring BBA 08h50 Warm up of the modulator   
  Draft   Thu Sep 11 11:12:36 2025 IC, VM  Ring BBA 8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase
 Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png 
  1074   Wed May 21 12:16:11 2025 MJ HG Shift summaryLinac Commissionning Axes Q1Q3 et Section apres chang cathode iris 0.5
100 pC
ph ch max 259
 Sole_Align.png 
  237   Mon Jan 10 09:27:14 2022 Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 FixDiag | CC | Linac Commissionning Automatique "health check" Allumage de client 5. Pourquoi était-il
éteint sachant qu'il y a des ds
qui doivent tourner dessus ?
  
  42   Mon Jun 28 11:45:12 2021 Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021Under ProcessLinacRF D1 | Linac Commissionning Attenuations icon1.gif RF attenuations :



GUN
(Maximun atténuation) Limite Hard
= 1667 steps


Section
 AttenuationCalibrationCurves.pngAttenuation_sets.png 
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons La puissance entree canon a ete verifie
et conforme a l'atterndu (6 MW = 18/3
MW)
  
  110   Mon Oct 11 18:04:35 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 18:04:10 2021FixedOtherLinac Commissionning Arręt faisceau     
  146   Fri Oct 29 15:53:12 2021 Entered by sophie chance from 134.158.195.142 on Fri Oct 29 15:52:55 2021FixedInfoLinac Commissionning Arręt faisceau Arrêt modulateur, arrêt faisceau   