207
|
Mon Dec 13 17:51:55 2021 |
Entered by Nicolas Delerue from 80.119.21.73 on Mon Dec 13 17:51:40 2021 | Under Process | Info | SY |
|
Modification retards déclenchement | |
17:52: Connexion à distance pour intervention sur IHM retards déclenchement
|
|
887
|
Fri Jul 19 14:59:48 2024 |
Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024 | Fixed | Fix | Opt |
|
Passage a 25Hz IHM conditionnement | |
Le bouton pour passer le conditionnement à 25Hz a été ajouté sur l'IHM conditionnement. |
|
816
|
Tue Nov 14 11:09:41 2023 |
Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023 | | Info | Diag |
|
Intervention WAC | |
10:50 Appel salle de contrôle. Pas de réponse.
Connexion à distance pour regarder les WAC.
Les réglages de déclenchement de ER/CA/RAC.05-ELR.01-WAC.01 et ER/CA/RAC.05-ELR.01-WAC.03 étaient incorrects. C'est corrigé.
11:20 Fin intervention |
|
Draft
|
Thu Jul 1 10:12:11 2021 |
Entered by Nicolas Delerue from 134.158.89.243 on Thu Jul 1 10:11:03 2021 | Not Fixed | | |
|
, entered from 134.158.89.243 | |
|
|
45
|
Thu Jul 1 10:04:01 2021 |
Entered by Nicolas Delerue from 134.158.89.243 on Thu Jul 1 10:03:48 2021 | Not Fixed | Info | Diag |
|
Veni vedi exit | |
Sommes venus pour la reunion SST (ecrans) .
Personne en salle de controle.
Sommes repartis... Appelez nous dans notre bureau quand vous etes prets. |
|
Draft
|
Tue Oct 4 17:34:09 2022 |
Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 | | Shift summary | |
|
Planning shift Thursday 6th October | |
- Study beam position on SST and BPM vs iris size / TL/BPM.01
- Start AcQAttrManager
- Study RDP vs TL/BPM.02
- Start MRSV
|
|
Draft
|
Mon Sep 27 14:46:31 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique | |
Bonjour,
Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Est-ce que quelqu'un pourrait regarder? Cela bloque le redémarrage des mesures de charge.
Merci d'avance,
Nicolas |
|
76
|
Mon Sep 27 14:49:10 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique, entered from 134.158.88.175 | |
Bonjour,
Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Est-ce que quelqu'un pourrait regarder? Cela bloque le redémarrage des mesures de charge.
Merci d'avance,
Nicolas |
| Attachment 1: Capture_2021-09-27_14.43.51.png
|
 |
|
825
|
Tue Dec 12 12:48:58 2023 |
Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 | | Info | SY |
|
Changement de frequence linac | |
Suite discussion avec Jean-Boel et Vincent, la frequence linac a ete remise a 2998550000Hz (nominal).
La frequence anneau est inchangee a 500.250000 MHz
Les frequences peuvent etre verifiee dans PlateformIHM / Synchro / Synthetiser status
|
| Attachment 1: Screenshot_from_2023-12-12_12-57-04.png
|
 |
|
415
|
Thu Mar 24 10:34:15 2022 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022 | Fixed | Fix | Infra | Linac Commissionning |
|
config clefs PSS | |
Operateurs: VC, SC, ND
Pour memoire, cf photo... |
| Attachment 1: IMG_20220324_102230_1_copy_1248x1664.jpg
|
 |
|
414
|
Thu Mar 24 09:44:28 2022 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 09:43:47 2022 | Fixed | Shift summary | Diag | CC | RF D1 |
|
Mesures 24/3/2022 | |
Operateurs: ND, VC, SC
===
Modulateur demare 9h
** Test IHM prises connectées
*** Baie 17: Plus de prises electriques disponibles. Alim branchee sur une autre baie pour les tests.
10h15 Ronde terminee. Il n'y a plus de surchausses a l'entree sud => Ticket 13025
Le PSS indique "Default centrale SSI" => Ticket 13026
Apres avoir tourne quelques clef le PSS est OK => Voir entree 415 https://elog.lal.in2p3.fr/THOMX/Commissionning/415
10h28 Modulateur allume
10h54 Tir unique OK => optimisation de l'ergonomie de l'IHM
11h09 Interlock modulateur Klystron/RFOut InputMissing
=> standby pour 1h
11:18 Tentative de git pull dans /data/shared/Interfaces/panneaux mais les permissions ont ete changees
11:25 Acces recharge surchausses
12:00 Git Pull OK
11:30 Pb Modulateur
12:30 Tentative redemarrage => Pb Modulateur...
14:15 Interface switch RDP OK
14:30 Redemarrage
16h16 Transport OK
Etude de charge
16h51 Pb modulateur (voir fichier joint).
16h55 Redemarrage OK
17h19 Laser delocke
17h24 Arret machine
===
Voici le programme de la journee:
* Tâches sans faisceau (à faire quand on a un temps mort)
- Test IHM prises connectées (x2) FAIT
* Tâches demandant beaucoup d'accès
- impédance de la FC
- tests OTR
* Tâches depuis la salle de contrôle
- calibration des mesures de charges (+BPM) EN COURS
- test AcqAttrManager
- IHM transport charge
|
| Attachment 1: Screenshot_from_2022-03-24_16-51-36.png
|
 |
|
991
|
Thu Jan 9 10:31:11 2025 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025 | Not Fixed | Problem | CC |
|
DS ThomX_PhotoCathode using a lot of CPU | |
The load on client5 is 29 making all operations slow.
Appently the DS ThomX_PhotoCathode is using a lot of CPU, slowing the rest.
|
| Attachment 1: Screenshot_2025-01-09_10-30-03.png
|
 |
| Attachment 2: Screenshot_from_2025-01-09_10-32-26.png
|
 |
|
963
|
Fri Nov 15 12:13:42 2024 |
Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024 | Not Fixed | Info | TL |
|
Charge excess in the TL | |
By looking at the BPM transmission tool one can see that there is more charge on TL/BP.03 than on TL/BPM.02 (see attached image).
The BPM seetings have been checked and they are similar.
One can see a similar effect when comparing TL/ICT.01 and TL/ICT.02.
Possible interpretation: the beam is scrapping the beam pipe and creating a shower of secondaries. |
| Attachment 1: Screenshot_from_2024-11-15_12-12-55.png
|
 |
| Attachment 2: Screenshot_from_2024-11-15_12-12-46.png
|
 |
|
821
|
Tue Nov 21 14:29:01 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 | | Shift summary | Diag |
|
Prise de donnees 21/11 | |
13:57 Mise en chauffe
15:00 Faisecau
Tests sur les ecrans
17:00 Arret |
|
680
|
Thu Feb 16 10:52:11 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:51:56 2023 | Fixed | Info | Linac Commissionning |
|
Health check | |
Les erreurs severes dans health check ont ete resolues.
La plupart etaient solvable en suivant les instructions donnees par health check.
La seule erreur plus compliquee etait sur TL/PS/DPI ou il a fallu aller valider (ack) l'erreur en local.
=> les operateurs sont encourages a regarder health_check et suivre les instructions pour faire disparaitre les erreurs rouges (qui peuvent etre des problemes serieux) ou alors les signaler aux responsables des sous-systemes concernes.
|
| Attachment 1: health_check_2023_02_16_10_51.png
|
 |
|
696
|
Fri Feb 24 16:24:15 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Fri Feb 24 16:24:00 2023 | Fixed | Shift summary | Diag |
|
Shift 24/2 | |
13:30 Mise en chauffe
14:30 Demarrage faisecau
Test de modifications de diverses interfaces.
17:00 Arret machine |
|
987
|
Fri Dec 20 14:00:06 2024 |
Entered by Nicolas Delerue from 134.158.195.142 on Fri Dec 20 13:59:52 2024 | Not Fixed | Problem | Infra |
|
Alarme sur les rondes | |
A 13h30 j'ai tent'e de faire un acces controle dans la casemate.
Quand j'ai pris la 1ere clef une alarme (son inhabituel) s'est declenchee au niveau de la fosse sud avec un chenillard rouge sur les verrines (fooses nord, sud et klystron).
J'ai appele le SPR comme explique hier.
Je suis tombe sur un repondeur...
Jean-Noel a tourne des clefs sur le PSS et l'alarme s'est arretee.
Plusieurs rondes sont tombees. |
|
243
|
Tue Jan 11 19:30:19 2022 |
Entered by Nicolas Delerue from 134.158.195.141 on Tue Jan 11 19:30:03 2022 | Fixed | Fix | SY |
|
Pb declenchement scope synchro | |
La frequence des diags etait reglee a 0.1Hz et le scope de la salle de controle se declenchait sur les diags. C'est pour cela que le scope se declenchait toutes les 10s.
Les signaux en salle de controle ont une longueur de 10ms mais ceux distribues ont les largeurs demandees (20us et 10us respective,ent pour les signaux klystron)
J'ai verifie les reglages des signaux de declenchement du Klystron (generateur 1, canaux 9 et 10). Nous sommes aux memes reglages (retard, amplitude et largeur) que dans la recette du 17/11.
|
|
417
|
Thu Mar 24 17:12:01 2022 |
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022 | Reference Solution | Linac | Linac Commissionning |
|
Paramètres Faisceau | |
Alignement laser
On retrouve la phase pour la charge max phi = 313 degres (consigne chiller canon = 31.25 degres)
On enlève 40 degres à la phase de charge max pour arriver à la phase d'énergie maximum phi = 273 degres
On focalise le faisceau avec la bobine de sortie canon I = 170 A
On peut l'observer sur la camera LI/DG/SST.01
On passe ensuite la section phi section = 100 degres (consigne chiller section 28.95 degres)
On met du courant dans le steerer avant section LI/PS/STR.02-V.01 I = 0.83A et LI/PS/STR.02-H.01 I = -0.90A
On observe sur TL/DG/SST.01
On peut observer les trends des ICTs avec taurus plot er/ca/rac.05-elr.01_wac.02/ch0 pour ICT1 |
|
416
|
Thu Mar 24 15:41:18 2022 |
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 15:41:04 2022 | Fixed | Linac | Linac Commissionning |
|
Alignement laser | |
Position moteur M4 avant alignement laser :
x = 380 et y = 5373
Position moteur M4 après alignement laser :
x = 580 et y = 5373
Image laser avant (prise par Hayg) =