  177   Tue Nov 23 13:12:37 2021 Entered by Iryna Chaikovska from 134.158.89.93 on Tue Nov 23 13:12:22 2021Under ProcessOtherAimants | Linac Commissionning Cyclage quadrupoles 23/11/2021

We would like to cycle the quadrupoles
in the linac. The procedure of the cycling
 Screenshot_2021-11-23_at_13.14.26.pngScreenshot_from_2021-11-23_14-09-27.pngScreenshot_from_2021-11-23_14-10-15.pngcylage_quad.pngcylage_quad2A.png 
  175   Tue Nov 23 10:56:50 2021 Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021FixedOtherAimants | Linac Commissionning Cyclage dipole  For 22/11/2021

There is the remaining field from
the dipoles in the TL. In order to go straight
 cylage_dipole.pngScreenshot_from_2021-11-23_12-16-04.pngScreenshot_2021-11-23_at_14.40.52.png 
  407   Mon Mar 21 09:53:11 2022 Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022 InfoAimants Cyclage QUAD (TL) The cycling of the following quads ( to
zero current) were tested. The corresponding
cycling cuves were loaded in the DS (checked).
  
  270   Thu Jan 20 16:01:14 2022 Emmanuel GoutierreFixedLinacAimants Conversion valeur moteur rotation solénoïde Conversion des valeurs des moteurs de rotation
du solénoïde

axmo_z
 Conversion_mm_avec_angle_de_rotation_solenoide.pdf 
  188   Thu Nov 25 17:07:29 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 17:07:16 2021FixedLinacLinac Commissionning Contrôle terminé     
  185   Thu Nov 25 15:01:54 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:01:41 2021Under ProcessLinacLinac Commissionning Contrôle Radioprotection Les controles radioprotection ont commencé
vers 14h50

Paramètres faisceau : 100
  
  893   Tue Jul 30 10:17:06 2024 M.O, M ELK, Hayg, SlavaUnder ProcessShift summaryLI | RF D1 Conditionnement section SC/ME/MO/VK/HG  signaux RF mesurés :

avec Oscillo :

orange
 Vide_Screenshot_2024-07-30_17-13-24.png 
  876   Thu Jun 6 08:29:19 2024 M EK, SC, ND, VCUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 6/06 8h20 : mise en chauffe de modulateur

start frigo et chiller section

Pression SF6 2.6 bar
 1100V_3us_10Hz_attsec_16dB.png1120V_3us_10Hz_attsec_16dB.png 
  894   Wed Jul 31 09:58:14 2024 M.O, M ELK, Slava , IrynaUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 31/07 signaux RF mesurés :

avec Oscillo :

orange
 image_de_splitter_.pngbreakdown_25Hz_3us_09dB_14h52.png 
  871   Thu May 30 08:36:04 2024 MEK, ND, VC, Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 30/05 icon8.gif 08h30: set to stanby modulator

start frigo & chiller section

start cond. @ 2 dB ( Pis= 16 MW)
 1.5_dB_2µs_5Hz_RF_breakdown.png1.1dB_2µs_5Hz_RF_breakdown_réseau_HF.png 
  892   Mon Jul 29 09:34:57 2024 M ELK, Slava, Iryna, HaygUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/07 signaux RF mesurés :

avec Oscillo :

orange
 Interlock_Sec_0.2dB_10Hz_3µs_15_19.pngInterlock_Sec_0.2dB_10Hz_3µs_15_35.png 
  870   Wed May 29 08:47:44 2024 M EK, KD, DN, HGUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/05 8h45: set to standby Modulateur

start Frigo et chiller section

start cond. @ 1.4 dB ( Pis=18 MW)
 1dB_1us_5Hz_interlock.png 
  869   Tue May 28 09:30:48 2024 MEC,SC, MO, RC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 28/05 8h30 : Set to standby modulator

Vérification des cables
de chaines de mesures : constat un pb au
 scope_0.9dB_3us_1Hz_11h28.pngcapture_zoom_vide_0.9dB_3us_1Hz.png1dB_3us_1Hz.png0_6dB_3us_1Hz.png 
  891   Fri Jul 26 10:12:42 2024 M.O, M ELK , Iryna, HaygNot FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 26/07 signaux RF mesurés :

avec Oscillo :

orange
 0.1dB_2us_10Hz_16-41-51.png0.1dB_2us_10Hz_16-34-07.pn0.1dB_2us_10Hz_17-15.png 
  890   Thu Jul 25 09:15:25 2024 M ELK, SC, MO FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 25/07 9h00 Mise en route modulateur

signaux RF mesurés :

avec Oscillo :
 0.7_dB_3µs_10Hz__13h04__claquage_réseau_HF.png0.3dB_3us_10Hz_16h35.png1dB_3us_10Hz_16h38.png 
  867   Fri May 24 08:21:49 2024 MEK , SC, Victor, Vincent Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning Conditionnement section 24/05 8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin
 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf 
  888   Tue Jul 23 11:55:42 2024 MO, MELK, MJUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/07 Reprise de
conditionnement section 23/07 @ 10H30: largeur
impulsion 0.5 µs @10 Hz ( voir images
 signaux_rf_scope.pngsignaux_RF_redpitaya_.png 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 
  865   Wed May 22 08:47:19 2024 MEK,KDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 22/05 8h45 : mise en marche de modulateur "set
to standby "

9h50 : démarrage, passage
 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png 
  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 8h15 impossible de mettre " standby"
du modulateur ==> la pompe de refroidissement
n'est en marche
 red_pitayafrom_2024-05-21_17-39-23.png 