936
|
Mon Oct 7 09:31:13 2024 |
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024 | Fixed | Info | Linac Commissionning |
|
| | pression SF6: 2.3 bar
(nb: redémarrage pc modulateur
demain mardi 8/10 à 9h00) |
|
|
953
|
Tue Nov 5 17:30:10 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024 | Fixed | Info | Laser |
|
Laser-cathode | | Bonjour, le laser (miroirs du parcours
optique) a ete realigne.
L'etat actuel: l'enrgie |
|
|
958
|
Tue Nov 12 10:36:39 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024 | Fixed | Info | Laser |
|
Salle laser ThomX | | Bonjour , l'intervention du Dalkia
sur le CTA de la salle laser est terminee.
Viktor. |
|
|
961
|
Thu Nov 14 09:21:51 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024 | Fixed | Info | Laser |
|
Etat laser | | Bonjour, rien n'a change au faisceau
laser (distribution reste le meme,l'energie
sur la cathode =60mkJ, Iris = 1.3mm, Att |
|
|
973
|
Wed Dec 4 10:54:28 2024 |
VC | Fixed | Fix | SY |
|
Frequence anneau et systeme de synchro | | Rappel:
la |
|
|
976
|
Fri Dec 6 11:11:31 2024 |
VC MJ | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Installation du PM dans la X-hucth | | Le PM est installe dans la X-hutch (PM
+ gene + ocsillo), on a test que ca
fonctionne - |
|
|
982
|
Tue Dec 17 23:26:45 2024 |
Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024 | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
shift 17/12 - scan vert FPC - 50 MeV | | 8h10 : mise en chauffe de la machine (modulateur,
laser, frigo et chiller)
9h30: faisceau dans anneau avec |
6x |
|
984
|
Wed Dec 18 11:59:49 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024 | Fixed | Info | Laser |
|
Laser-cathode | | Bonjour, le laser-cathode a ete realigne
(miroir M5, miroir dans la salle laser).
L'energie UV sur la cathode 55 µJ, |
|
|
998
|
Thu Jan 16 11:57:51 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025 | Fixed | Shift summary | LI | TL | Ring | Aimants |
|
Resultats Tour de cle Q1-Q3 - Shift 15/01 | | Prise de donnees axe Q1Q3 du 14/01
Steerers
Axe q1q3 |
|
|
1001
|
Tue Jan 21 14:24:22 2025 |
MJ KD | Fixed | Shift summary | TL | Ring | Linac Commissionning | Ring Commissioning |
|
align Q1Q3 et pt fonctionnement 61.5 MeV | | *** Alignement meca Q1Q3
9h30
: 1 tour de cle Q3 vers le mur ( = retour |
 |
|
1002
|
Wed Jan 22 13:32:43 2025 |
MJ HG | Fixed | Shift summary | TL | LE | Ring | Linac Commissionning |
|
| | ** Alignement Q1Q3 du jour
str1H
0.69 |
|
|
1036
|
Thu Mar 13 11:25:29 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025 | Fixed | Linac | Laser |
|
Etat laser | | Bonjour, le parcours optique a ete realigne.
L'enegie UV sur la cathode
= 48uJ , Iris = 1.3mm, Att = 410 |
|
|
1037
|
Thu Mar 13 11:57:19 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025 | Fixed | Info | Laser |
|
Etat laser | | Voici les distibutions UV laser sur lacathode
avant et apres l'alignement |
 |
|
1059
|
Fri Apr 18 08:23:13 2025 |
VM, IC, ND | Fixed | Problem | LI |
|
Measurements 18/4 | | 08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling
all magnets |
    |
|
1116
|
Tue Sep 9 15:19:47 2025 |
Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025 | Fixed | Shift summary | LI | TL | LE | Ring |
|
X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source | | ** spectre CdTe avec feuille Au (pour calib)
** Utilisation du script FWHM des
spectres, mapping 2D - Enregistrment spectres |
|
|
1124
|
Wed Sep 17 16:56:59 2025 |
HG, MJ | Fixed | Shift summary | LI | TL | LE | Ring |
|
Quads scans Q3 et Q7 + Courbe energie vs Phase section | | Modulateur HT @600 V |
|
|
1148
|
Mon Nov 10 16:15:53 2025 |
KD, M2 GI | Fixed | Shift summary | LI | TL | Linac Commissionning |
|
shift du 10 novembre 2025 | | 8h: mise en chauffe en remote (modulateur,
laser, frigo/chiller)
10h: Démarrage machine |
|
|
Draft
|
Thu Nov 13 08:00:59 2025 |
KD MJ VM HG | Fixed | Shift summary | LI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X | | Apres que Kevin a regle tous les problemes
synchro signal bpm etc etc etc
L'interface SST ne fonctionne |
|
|
1188
|
Thu Feb 5 13:18:03 2026 |
KD, HG, VM | Fixed | Info | LI | TL | LE | Ring | CC | Laser | Opt | MECA | SY | Vide | Electronique |
|
Laser PC status | | ** l'iris a été changée
et est opérationnelle
/!\ |
|
|
1202
|
Wed Mar 4 08:35:23 2026 |
VM, MJ, DN, RC | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir | | 08h35 Warm-up ThomX: Modulator, Laser,
Fridge
Programme |
7x |