HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 41 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  234   Wed Jan 5 15:25:30 2022 Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022Under ProcessProblemRF D1 | Linac Commissionning Interventon Modulateur  Soucis modulateur qui ne passe pas en HV.

--> [MO, JN]  : Intervention
sur le modulateur.
  
  877   Fri Jun 7 09:24:59 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024New SolutionShift summaryInfra | Linac Commissionning Interventions du matin 9h Intervention sur les filtres de la CTA
(Dalkia, Stéphane)

9h Intervention dans les sous-sols
  
  641   Tue Dec 6 09:54:56 2022 ND, VCUnder ProcessInfoRing Intervention synchro 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF.
  
  816   Tue Nov 14 11:09:41 2023 Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023 InfoDiag Intervention WAC 10:50 Appel salle de contrôle. Pas
de réponse.

Connexion à distance pour
  
  78   Thu Sep 30 15:59:32 2021 Entered by Super Team from 134.158.195.144 on Thu Sep 30 15:59:16 2021FixedShift summaryLinac Commissionning Interlock vide et modulateur Interlock vide sur pompe très fréquent,
modification en local pour améliorer
la situation
  
  138   Thu Oct 28 17:07:46 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:07:32 2021Under ProcessLinacLinac Commissionning Interlock sur PP1 en augmentant l'intensité de COL02 à 10 Hz Malgré attenuation 3 dB, à
10 Hz, interlock régulier en montant
la valeur d'Ampérage de la bobine
  
  91   Tue Oct 5 10:55:40 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:55:25 2021Not FixedProblemAimants | Vide | Linac Commissionning Interlock RF + Solenoides  
Gradient accélérateur
: 80 MV/m (atténuateur Canon à
1.5 dB)
Solénoides :

COL1(CC)
 Screenshot_from_2021-10-05_10-55-29.pngScreenshot_from_2021-10-05_13-25-45.pngScreenshot_from_2021-10-05_16-32-19.png 
  1083   Thu Jun 5 08:26:31 2025 VM, IC, DN, RCUnder ProcessShift summaryRing Commissioning Interaction region studies Goals: Optimization
of the IP. Verification of the llaser waist
 6x 
  976   Fri Dec 6 11:11:31 2024 VC MJFixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Installation du PM dans la X-hucth Le PM est installe dans la X-hutch (PM
+ gene + ocsillo), on a  test que ca
fonctionne -
  
  1111   Tue Sep 2 07:54:11 2025 MJ, KD,VM,IC, RC, DNUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Injector at 70 MeV 7h50: mise en chauffe remote (modulateur,
frigo/chiller, laser, cyclage)

9h start of the beam
  
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  369   Wed Feb 23 12:45:44 2022 Entered by Christelle Bruni from 134.158.195.142 on Wed Feb 23 12:45:28 2022 ProblemCC Impossible de redémarrer srv3 , intervention du contr^ole commande necessaire Laser passé en gate_in false en
attendant

Olivier est venu nous dépanner,
  
  106   Mon Oct 11 13:40:31 2021 Entered by SC from 134.158.195.142 on Mon Oct 11 13:40:14 2021Under ProcessLinacLinac Commissionning Image vide sur IHM sans laser sans RF Capture du vide sur l'IHM RF shutter
photocathode fermé sur MPS et pas
d'autorisation de RF
 vide_sans_laser_sans_rf.png 
  121   Tue Oct 26 15:19:17 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 15:18:59 2021 InfoRF D1 Image PIC PBC photodiode a l'oscilloscope en salle de controle Attenuateur RF canon : 0.25 dB

Orange : Photodiode
Vert : PBC
 image_PIC_PBC_photodiode.png 
  711   Mon Mar 13 12:18:02 2023 MJNot FixedUrgentLinac Commissionning IHM SST HS - URGENT IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche
 IHM_HS_2023-03-13_12-42-01.pngScreenshot_from_2023-03-13_12-55-32.png 
  652   Mon Dec 12 15:49:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 15:49:05 2022Not FixedShift summaryLinac Commissionning IHM BPM, "mean" HS ? Les "mean" ne semblent plus fonctionner
dans l'IHM bpm. Les cases "mean"
etaient tout le temps a zero ce matin pour
  
  162   Mon Nov 15 09:20:24 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 09:20:04 2021Not FixedProblemLinac Commissionning IHM  Bonjour,

la consigne dans l'IHM RF ne
fonctionne pas
  
  375   Mon Feb 28 17:13:12 2022 Entered by Super Team from 134.158.195.141 on Mon Feb 28 17:12:48 2022 InfoLinac Commissionning IHM apres un balayage de l ecran nous avons
trouve l IHM

desoler pour l alerte
  
  721   Wed Mar 29 13:35:25 2023 MJ ProblemLinac Commissionning ICT1 ?? demarrage vers 13h

Pb de vide depuis une demi-heure
(MV-1 rouge sur le pss) Bruno est venu +
 ICT1_2023-03-29_14-05-01.pngICT1_2023-03-29_14-06-38.png 
  94   Wed Oct 6 20:10:42 2021 Entered by Hayg Guler from 134.158.195.141 on Wed Oct 6 20:10:28 2021Under ProcessLinacDiag | Linac Commissionning ICT : Signaux avant et apres la section icon6.gif Le faisceau a passé la section :


Bleu : avant section
Rouge
: apres section


 
 ICT_LI_et_TL_3200.pngICT_LI_et_TL_400.png 
ELOG V3.1.4-395e101