234
|
Wed Jan 5 15:25:30 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
Interventon Modulateur | | Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention
sur le modulateur. |
|
|
877
|
Fri Jun 7 09:24:59 2024 |
Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024 | New Solution | Shift summary | Infra | Linac Commissionning |
|
Interventions du matin | | 9h Intervention sur les filtres de la CTA
(Dalkia, Stéphane)
9h Intervention dans les sous-sols |
|
|
641
|
Tue Dec 6 09:54:56 2022 |
ND, VC | Under Process | Info | Ring |
|
Intervention synchro | | 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF. |
|
|
816
|
Tue Nov 14 11:09:41 2023 |
Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023 | | Info | Diag |
|
Intervention WAC | | 10:50 Appel salle de contrôle. Pas
de réponse.
Connexion à distance pour |
|
|
78
|
Thu Sep 30 15:59:32 2021 |
Entered by Super Team from 134.158.195.144 on Thu Sep 30 15:59:16 2021 | Fixed | Shift summary | Linac Commissionning |
|
Interlock vide et modulateur | | Interlock vide sur pompe très fréquent,
modification en local pour améliorer
la situation |
|
|
138
|
Thu Oct 28 17:07:46 2021 |
Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:07:32 2021 | Under Process | Linac | Linac Commissionning |
|
Interlock sur PP1 en augmentant l'intensité de COL02 à 10 Hz | | Malgré attenuation 3 dB, à
10 Hz, interlock régulier en montant
la valeur d'Ampérage de la bobine |
|
|
91
|
Tue Oct 5 10:55:40 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:55:25 2021 | Not Fixed | Problem | Aimants | Vide | Linac Commissionning |
|
Interlock RF + Solenoides | |
Gradient accélérateur
: 80 MV/m (atténuateur Canon à
1.5 dB)
Solénoides :
COL1(CC) |
  |
|
1083
|
Thu Jun 5 08:26:31 2025 |
VM, IC, DN, RC | Under Process | Shift summary | Ring Commissioning |
|
Interaction region studies | | Goals: Optimization
of the IP. Verification of the llaser waist |
6x |
|
976
|
Fri Dec 6 11:11:31 2024 |
VC MJ | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Installation du PM dans la X-hucth | | Le PM est installe dans la X-hutch (PM
+ gene + ocsillo), on a test que ca
fonctionne - |
|
|
1111
|
Tue Sep 2 07:54:11 2025 |
MJ, KD,VM,IC, RC, DN | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Injector at 70 MeV | | 7h50: mise en chauffe remote (modulateur,
frigo/chiller, laser, cyclage)
9h start of the beam |
|
|
1094
|
Thu Jun 26 08:55:15 2025 |
IC, DN, RC, HG, ME | Under Process | Shift summary | Ring Commissioning |
|
Improve ring for X-rays | | Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and |
7x |
|
369
|
Wed Feb 23 12:45:44 2022 |
Entered by Christelle Bruni from 134.158.195.142 on Wed Feb 23 12:45:28 2022 | | Problem | CC |
|
Impossible de redémarrer srv3 , intervention du contr^ole commande necessaire | | Laser passé en gate_in false en
attendant
Olivier est venu nous dépanner, |
|
|
106
|
Mon Oct 11 13:40:31 2021 |
Entered by SC from 134.158.195.142 on Mon Oct 11 13:40:14 2021 | Under Process | Linac | Linac Commissionning |
|
Image vide sur IHM sans laser sans RF | | Capture du vide sur l'IHM RF shutter
photocathode fermé sur MPS et pas
d'autorisation de RF |
|
|
121
|
Tue Oct 26 15:19:17 2021 |
Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 15:18:59 2021 | | Info | RF D1 |
|
Image PIC PBC photodiode a l'oscilloscope en salle de controle | | Attenuateur RF canon : 0.25 dB
Orange : Photodiode
Vert : PBC |
|
|
711
|
Mon Mar 13 12:18:02 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
IHM SST HS - URGENT | | IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche |
 |
|
652
|
Mon Dec 12 15:49:21 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 15:49:05 2022 | Not Fixed | Shift summary | Linac Commissionning |
|
IHM BPM, "mean" HS ? | | Les "mean" ne semblent plus fonctionner
dans l'IHM bpm. Les cases "mean"
etaient tout le temps a zero ce matin pour |
|
|
162
|
Mon Nov 15 09:20:24 2021 |
Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 09:20:04 2021 | Not Fixed | Problem | Linac Commissionning |
|
IHM | | Bonjour,
la consigne dans l'IHM RF ne
fonctionne pas |
|
|
375
|
Mon Feb 28 17:13:12 2022 |
Entered by Super Team from 134.158.195.141 on Mon Feb 28 17:12:48 2022 | | Info | Linac Commissionning |
|
IHM | | apres un balayage de l ecran nous avons
trouve l IHM
desoler pour l alerte |
|
|
721
|
Wed Mar 29 13:35:25 2023 |
MJ | | Problem | Linac Commissionning |
|
ICT1 ?? | | demarrage vers 13h
Pb de vide depuis une demi-heure
(MV-1 rouge sur le pss) Bruno est venu + |
 |
|
94
|
Wed Oct 6 20:10:42 2021 |
Entered by Hayg Guler from 134.158.195.141 on Wed Oct 6 20:10:28 2021 | Under Process | Linac | Diag | Linac Commissionning |
|
ICT : Signaux avant et apres la section |
| Le faisceau a passé la section :
Bleu : avant section
Rouge
: apres section
|
 |