  Toutes les notes concernant les Commissionning de ThomX, Page 40 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subject Icondown
  778   Mon Jun 26 09:27:46 2023 ND, LSNew SolutionShift summaryDiag ThomX operations 26/6 

9:26 Mise en chauffe

9:40 Cycling the magnets

11:45 Beam ON

12:23 Study signal in FC

WAC2 delay:  -6.15us

WAC3 delay: -6.45us

12:30 Prise image TL/FC.01

12:45 Difficultés allumage kicker extraction

13h45 Trasnport dans EL jusqu'à l'écran

14h33 Visualisation du signal dans EL/FC.01 => changement retard synchro sur WAC3

17h15 Arret Machine

  Draft   Thu Jun 29 13:09:57 2023 LS, NDNew SolutionShift summaryRing shift du 29 juin 2023 

9:45 Git pull

Test des interfaces... OK

Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration

10:10 Mise en chauffe

Interlock sur les aimants vu pendant le cyclage. Resolu.

11:30 Faisceau

12:05 Allumage cavite anneau (MEK)

12:15 Perte faisceau...

Apparement le PA avait disjoncte. Intervention MO.

13:00 Retour faisceau

Prise de données TL/FC01

13:30 Transport dans EL, essaie d'amélioration du transport : on a réussi à transporter environ 1/3 de la charge 

Prise de données dans EL/FC01 

15:00 Stockage dans anneau, optimisation 

16:00 Prise de données pour étudier les pertes dans les fibres. 

Prise de données des pertes:

-sans faisceau, avec juste kicker d'injection, septum, ou kicker d'extraction

-sans faisceau, avec tous les EP : obtenir bruit de fond

-avec faisceau, avec juste kicker d'injection, septum, ou kicker d'extraction 

-avec faisceau: prise de données avec différents timing pour le kicker d'extraction => extraire le faisceau pour comprendre le timing de l'acquisition et observer les pertes avec différents timing de d'extraction

  Draft   Fri Jun 30 13:14:30 2023 LS,NDUnder ProcessShift summaryRing run du 30 juin 2023 

9:00 Warm up machine

10:40 Start the beam

10:50 Scan charge phase 

11:15 Storage in  ring

Recipe: recipe_recipe_LI_TL_RI_test_20230629_16_44_31.txt

11:30 Studies of losses with fiber inside ring 

12:30 Start RF cavity

13:00 Scan phase cavity

 

 

 

 

  781   Mon Jul 3 14:54:09 2023 SC/CB/JNC Shift summaryLI run du 3 juillet 2023 

9h30 Intervention Maher pour dosimètre

10h00 Mise en chauffe modulateur et refroidissements

14h prises d'image laser selon églage du miroir M5. Le laser n'est pas bien aligné sur l'iris --> a reprendre

Recherche nouvelle position : phase focaliation max --> renregistrement image sur SST1 Qmax, position laser iris : 4.635mm, 1.736mm, au lieu de 4.957mm/2.358mm

Charge phase, phase chute de charge : 305 degrés. Réalignement du solenoide dans dosseir alignsoleno du jour (DTx= 0.977 DTz= 3.9836 DRx= 4.2364 DRz= -5.2545)

Energie = 4.95 MeV,

Mesure de dimension sur LISST1 en fonction du solenoide

On se place à 233 A, on passe la section sans steerer, charge avant 110 pC, après 60pC

A 200A, toute la charge est transmise.

A 180A, toute la charge est transmise pour LIH1=-0.2A, LIv1 +0.6A

position laser sans steerer : iris position : 6.942, 3.996mm, charge transmissise à 100%, atténuateur 327

'facteur 1.7'  atténuateur 309mm, mesure dimension en fonction du soleno sans steerer, image enregistrée sur TLSST1_180A_pos1 : 225A on perd de la charge

Mesure presque symétrique en sortie linac (no quad,)

Vérification de la phase section 112 au lieu de 103, avec soleno de 200A, avec l'aténuateur 1.84 dB, dipole à 161.2A

On ajuste l'atténuation : 1.92 dB, enregistrement image TLSST2_200A_pos1

test positions : 4.94/5.125, ingérable

on revient à 4.635mm, 1.736mm, réalignement soleno : DTx= 0.92647 DTz= 2.9043 DRx= 5.6536 DRz= -4.0738

on fait quelques quad_scan avec QP3, soleno 190A

Le derniers QP1=-2.2A, QP2=+2.6A,

Image enregistrée avec QP3=0 TLsst1_scan2_qp3_0, même chose pour Tlsst2 , Idip à 159.3A

TLSST1_scan2_qp123_0

image enregistrée

energie steerers 50MeV +/-5%

Arret

 

 

 

 

 

 

 

 

 

  782   Tue Jul 4 08:56:04 2023 SC/CB/ME LinacLI | RF Anneau | Linac Commissionning Faisceau linac et cavite RF 

8h55 Démarrage modulateur et refroidissements

Intervention SPR terminé

Solenoide = 190A, pas de quadrupoles, LI/PS/STR.01-H.01 = -1A, LI/PS/STR.01-H.01 = 0.90A, position laser = hor 4.635mm ver 1.736mm, visualisation sur TLSST2 et les BPMs

Tests exploratoires de stabilité faisceau

Feedback utilisé par l'anneau : quand ecart > 500 um est mesuré pendant 50 coups, variation attténuateur de 10e-2

Dérives sur TL/SST2 ont plusieurs sources : position du laser, puissance incidente RF, et phase globale. Mesures systématiques en cours.

13h51mn16s modulateur est passé de 1089.3 à 1090.4V.

13h59 1090.1V 

14h18 arret feedback M4-M5

14h23 decrochage laser

14h37 mise en route feedback M4-M5

 14h55 reajustement de la phase sur TL/SST2 à phi = 257 pour forme faisceau

 14h56 1090.30V pour energie

14h57 1090.60 V

15h01 phi canon 258°

15h02 1090.2V - 1090V

15h08 1089.8V

15h09 phi canon 259°

15h11 phi canon 260°

15h12 1089.3 V 

Chute brutale apres coup avec délai

15h14 1090.4V

15h22 phi canon = 258°

15h27 1090.3V

15h30 phi canon = 259°

15h31 1089.5V

16h55 modulateur 1091.4V, phase 256

17h06 1090.9V

17h13 phase 257, 1090.2V

17h29 phase 254, 1091.4V

17h40 phase 255, 1091.2V

17h54 phase 257, 1090.4V

18h11 phase 255, 1091V

18h17 phase 256, 1090.2V

18h48 phase 255, 1090.8, chute à 18h40, quelqu'un a fermé quelque chose ?

18h56 phase 256, 

19h05 phase 254, 1091.4, 

19h16 phase 255

19h20 1090.7V

19h25 253 degrés

Arret

 

 

 

 

  783   Mon Jul 24 16:29:07 2023 ND,LS, KD, JNC Shift summaryLI | TL Shift du 24/07/2023 

10h: Accès casemate

Ajout de deux cables près de TL/ICT.02, un jouant le role d'antenne et l'autre connecté à une résistance 50 Ohm. 

Cable n°36025 avec 50 Ohm sur WAC02 ch7

Cable n°36036 en antenne sur WAC02 ch5

Objectif: étude du bruit EM pour comprendre la fluctuation de charge détectée

11h : Mise en chauffe 

13h45 : Démarrage Faisceau 

13h50: Cyclage des aimants

14h: Scan charge/phase

14h30: Problème avec la mesure de charge: redémarrage des ds calc à 16h

15h: Transport jusque dans la TL

15h30: Prise de mesure des signaux ICT (avec les deux nouveaux canaux) pour étude de fluctuation de bruit => prise de mesure avec et sans faisceau

16h: Modulateur en HV

16h20: Modulateur en trigger => attenuateur section RF à 1.6dB

16h45: Injection dans l'anneau avec recette LI_TL_RI_test_20230627_16_46_07 sauvée sous le nom Beam stored (no RF, 150 turns)

16h49: Interlock cavité Pi Pr RF

17h05: Interlock modulateur status bit 12

*** Problème allumage modulateur ==> acquitement des défauts sur les MUX en physique (PC Mohamed HS)

*** Problème avec la cavité RF qui n'accroché pas avec le PID fréquence ==> redémarrage chassis PID

*** Réalignement tete de machine et injection "à l oeil" dans l'anneau

*** 21h: arret machine

 

 

 

 

 

  784   Tue Jul 25 19:15:02 2023 Opérateurs ThomXUnder ProcessShift summaryOpt | Ring Commissioning shift du 25 juillet 2023 

* Démarrage de la machine par Iryna/Slava/Viktor et démarrage cavité CFP par Ronic/Daniele

* Préparation du setup de mesure pour la ligne X (Spectromètre CdTe)

==> première mesure à 13h

Optimisation des mesures ==> le spectre ne change pas avec la position du detecteur dans le faisceau

* Calibration du détecteur avec une bobine d'étain (Sn60Pb40) 

* Femertures des premières fentes pour couper le spectre ==> le spectre est modifié

* Calibration/réglage de l'ouverture des fentes ==> problème dans la conversion. A investiguer demain. 

==> l'anneau été très stable aujourd'hui. Une reprise dans la soirée (après 16h - 17h) de l'atténuateur section (2.06dB -> 2.03dB) pour gagner un facteur 2 environ sur la charge injecter

19h10: arret machine

 

*** Programme ***

* mesure du spectre Compton et du flux si possible

* Optimisation anneau et CFP pour des "long-run"

  785   Wed Jul 26 09:01:34 2023 KDUnder ProcessShift summaryLaser | Opt shift du 26 juillet 2023 

9h : mise en chauffe de la machine (frigo, chiller, modulateur, laser) + "start cycling all magnets" dans IHM

11h: début de la prise de donnée

** recentrage des fentes 1 de la ligne X sur le flux compton. Prise du spectre de référence (position flux max ouverture fente1 3mmx3mm ==> utiliser la calibration de la veille)

** essaye de la diode calibrée ==> impossible à lire, courant négatif trop important (changer de pico pour lire les courant négatif ou prendre un oscilloscope)

** essaye de la caméra X

         -- prise d'une image du flux compton (stiching du faisceau à faire = images prise reste à traiter)

         -- estimation du flux à la caméra donne environs 10⁶ - 10⁷ ph/s 

** optimisation de l'ouverture et position de fentes 1 avec la caméra.

===> le faisceau n'est pas centrée sur le tube X, quid de la direction du faisceau d'électron ?

18h : arrêt machine

 

*** Remarques ***

- CFP instable et nécessite un opérateur en permanence

- Injection dans l'anneau et optimisation vers 10h30 puis aucune action sur la machine de la journée ==> Machine très stable aujourd'hui ! 

 

** Programme **

- fin de réglage fente 1 LigneX

- optimisation de la position fente 1 sur le spectre X

- mesure du flux total si possible

- image du faisceau si possible

- scan faisceau d'électron avec la table CFP et mesure en parallèle des paramètres faisceaux (puissance laser + charge stockée)

  786   Fri Jul 28 17:06:02 2023 VK, IC. VM, LS, JNC Shift summaryRing Commissioning Test of the new optics (27-28 July) 

Start of the modulator and laser at ~9h and hour later start the beam.

Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).

- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations,  tune....)

- Load of the new optics with bigger MCF TDR_0.17_0.64_r56_0.4_sx_Dff41.2_DipMagnL.str : MCF=0.0231  chro=0/0. Optimization of the injector and the ring.

- Change the RF frequency to 500.25 MHz. Optimization of the injector nd the ring. The sufficient storage is obtained.

- Going to the 500.33 MHz and working on the orbit, energy and phase.

Observation: either energy or phase of the injector is not stable, it oscillates, so the amplitude of the synchrotron oscillations changes a lot (seen by the TbTX oscillation amplitude). Like this it is very difficult to find the proper energy and phase for the ring. We saved the trend (max TbTX). to be understand and worked out.

To be continued next week.

  787   Mon Jul 31 16:57:11 2023 VK, IC. VM, LS Shift summaryRing Commissioning Work on the new optics 

9h30 Start of the modulator and laser

Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.

Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look at it. 

permanent probmem with Libera.02 and Libera.04

Work at 500.32 MHz without orbit correction.

  788   Tue Aug 1 09:21:59 2023 CB/JNC/SC LinacLinac Commissionning Faisceau linac 

9h20 Mise en chauffe modulateur, démarrage frigo et laser

Permis casemate en rouge sur le PSS mais impossible de rentrer dans la casemate pour appuyer sur les rondiers : Accés interdit. Pas de faisceau possible.

La sonde était tombée par terre, cela l'a mise en veille et entrainé la fermeture automatique de la casemate. Intervention du SPR pour résoudre le problème.

Problèmes avec les BPMs ce qui rend le programme de la journée difficile à accomplir....

Résolution des pb des BPM, redémarrage + init

Position laser [ 4.635 1.636 ] position soleno = translation 0.927 2.904 mm; rotation 5.654 -4.074 mrad

realignement M5+M4 : nouvelle position 4.46 1.86 mm

on a regagné en charge 100 pC à charge max @294 degrés, position atténuateur laser 397mm

avec set dark current : au gain d'énergie max 244 degrés 80 pC, charge max 90pC

recette : 243 degrés phase cano, 114 phase section, atténuater section 1.92, steerer LI H1 =-1.02A, LIV1 = 0.94A, coil 193A, dipole 159.3A, 

Pb redémarrage récurrennt des BPM

trend lancé avec  M4feedback loop

14h13mn40s arret du libera02

Attenuation initiale canon = 0.0dB et section = 1.92 dB et HT = 1090.8 V

0.12V section et 0.18V canon

HT = 1140V, att canon = 0.75dB et att section =  3.25 dB, Esteerer canon= 5.12 MeV, I dipole = 159.3A, I soleno 197A, image TLSST_1140V phase canon 235 deg, phase section 102degrés--> il faut plus de temps de conditionnement pour stabiliser à cette puisance

trend enregistré 18h32

on revient à 1090V, et on acquiert un nouvau trend 18h46

allumage des quad à 19h04 (comportement étrange sur la position TLBPM2)

Recette de quad données par Iryna + ajustement steerer TLH1=-10A, image prisse sur TLSST2 Soleno 194A + image sur TLSST3

quad scan QP1 --> horible !!!

 

 

 

 

 

 

 

 

 

 

 

  789   Tue Aug 1 13:45:55 2023 CB/JNC ProblemTL | Diag libera 2 problem 

Les BPm doivent être redémarré et réinitialisé dans jive toutes les 20 minutes environs.

 

 

  790   Thu Aug 10 15:52:24 2023 VK, VM, IC, LS Shift summaryRing Commissioning Work on the new ring lattice (August, 2-4) 

Starting point nominal lattice D1Thomx_017_064_r56_02_chro00 with the MCF=0.014  chro=0/0

Goal: test the new lattice with MCF=0.0231  chro=0/0 which alows to decrease the RF frequesncy down to 500.25 MHz. This will make possible operation witht eh FPC.

Total charge measured by the ICT was 60-70 pC. It was not possible to increase it with the attenuator. 

Start working with the new laser spot position on the photocathod (after previous shift by linac group). This also includes the different solenoid alignment and laser positorn feedback setting. We came back to our usual settings.

Work started witht he nominal optics at 500.32 - 500.33 MHz. Correction the orbit and minimization of the synchrotron oscillations. Check the tunes. Observations: it is not possible to reduce considerably the synch. oscilations due to some jitter from injecton to injecton. We do not know whether it is the energy or phase jitter, to be investigated. From orbit measurements w/o RF, we see that that std of the hor. orbit (injection by injection) at BPM3 (high D region) is about 0.26 mm. With the D ~ 1m => dp/p = 0.026 %. It is kind of compatible with the injector energy jitter seen at TL BPM2 : 1 mm correspods to ~0.1% dp/p. It would be good to have some information about the phase stability beetween the ring trigger and the laser. As the result of such jitter, it is difficult to find the proper E and phase and so, correct closed orbit.

RF freq = 500.25 MHz. Dispersive orbit is obtained. Optimization of the injection and storage. No betatron oscillation, should be investigated. A good storage is obtained, which could be further optimezed. 

Work on the BBA. The algorythm does not work correctly with the current TbT orbit. The jitters are quite large in order to detect the orbit change due to quadrupoles/correctors change. Under investigations. 

Measurement of the emittance. The proper/full quadrupole calibration was worked out B(I) from -12 to 12 A. The emittance was measured at 210 A and 220 A. At 220 A from the data taken, the vertical emiitance can not be estimated (gives the imaginary numbers). See the ppt attached.

Suggestion: commission the MRSV to be able to visualize the beam in the ring and set-up fully the EL to be able to measure the chrage and beam images.

End of August: take another data for emittance and study BBA.

  791   Mon Aug 21 09:10:35 2023 KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redémarrage machine 21/08/2023 

9h: redémarrage des systèmes.

- pompes boucle de refroidissement (pompe primaire, pompe échangeur, maintien de préssion, pompe cavité RF) ==> la résistivité est à 720k Ohm 

- redémarrage des aimants (mise sous tension). 

- rédémarrage du modulateur impossible ==> l'écran est étein et les disjoncteurs semblent dé-enclancher ==> intervention de Maher.

- Redémarrage des chillers/frigo et surpresseur

- redémarrage ampli cavité RF

- Intervention necessaire pour le redémarrage des diags ==> rallumage des libera et des wavecatcher

- intervention SPR necessaire sur le PSS (erreur d'une armoire qui empeche l'accès à la casemate). ==> balise du LB9000 interne à la casemate empeche l'entrée dans la casemate mais le faisceau est possible

- Démarrage du laser PC : 183uJ en sortie du laser, le profile n'est pas beau ==> intervention de Viktor

Charge max : 60pC

réglage de la TL et essaie à différentes puissance klystron. Sur TL/BPM0.2 l'effet est flagrant. entre 1110 et 1090 il y a beaucoup plus d'instabilités (cf. screenshot première partie à 1110 et deuxième à 1090). Problème de conditionnement ou autre ?

18h: arret machine, tout est Ok sauf CFP

 

Remarque : problème de shutter laser en état indéterminé sur le MPS

  792   Mon Aug 28 18:13:32 2023 Entered by Viktor Soskov from 134.158.195.153 on Mon Aug 28 18:13:08 2023FixedLinacLinac Commissionning Laser status 

Bonjour, le parcours optique du laser-cathode a été aligné. L'énérgie UV actuelle sur la cathode - 47µJ (iris=1.3mm).

Viktor. 

  793   Wed Sep 6 11:04:07 2023 Entered by Viktor Soskov from 134.158.195.153 on Wed Sep 6 11:03:51 2023FixedInfoLinac Commissionning Laser status 

Bonjour,

voici l'image du faisceau laser sur la cathode, le diamètre d'iris = 7mm. L'énergie sur la cathode ~ 50µJ pour l'iris =1,3 mm.

Viktor.

  794   Wed Sep 20 10:00:58 2023 Entered by Viktor Soskov from 134.158.195.153 on Wed Sep 20 10:00:42 2023FixedInfoLinac Commissionning Laser status 

Bonjour, le laser-cathode a été resté allumé pendant la nuit.

Viktor.

  795   Thu Sep 21 16:16:38 2023 RC, DN, VC, NDUnder ProcessShift summaryLI | TL | LE | Ring Operations 21/09  

Modulateur en chauffe avant 14h

mise en place d'une synchronisation compatible à la génération de X "synchrone"

1- un deuxieme synthé ring est mis en place qui délivre le 500.25MHz anneau à la cavité RF (le synthé n'est pas pilotable à distance)

2- le synthé d'origine 500.25MHz donne la référence à la cavité FP

les deux synthés sont locker en phase ( envoron 10ps rms)

un synthé ext (Rigol locké sur le 10MHz du synthé 500MHz) génére le 33.35MHz RI en mode cavité FP non synchrone)

le meme synthé servira de ligne à retard pilotée en mode cavité FP synchrone.

La phase du synthé 500.25MHz (FP) peux etre pilotée pour positionné le pulse FP avec les électrons dans un bucket 500MHz

la phase RiGol (33RI) permet de sauter de bucket 500MHz et d'avoir une excurtion d'une période de 33MHz

 

 

Difficulte avec l'obturateur laser...

Att laser a 310mm

Cavite RF: 127 deg; Att 1.85dB

Transport jusqu'a l 'entree de l 'anneau. Pas de faisceau observe dans l 'anneau.

17:00 Arret machine 

Acces CFP

 

 

  796   Wed Sep 27 12:38:08 2023 KDReference SolutionShift summarySY | Linac Commissionning run du 27 septembre 2023 

12h38 : Mise en chauffe de la machine (modulateur, chiller, laser)

==> mise en place de la version du 27/09 dans le CPLD pour la synchro. Trig régulier mais jitter entre les deux 500MHz de 35 ps (RMS) et 160 ps (P-P).

17h30 : arret machine

Programme : 

* Redemarrage de la machine

      -> charge eviron de 200 pC à 310mm de attenuateur et 1.3mm ouverture iris

             * Energie max : 155° (phase canon), 100pC à 530mm atténuateur laser, position [H;V] = [5.24 mm, 2.91mm]   

* verification du trig Klystron

  -> pas de probleme de klystron visible. Le faisceau est pas mal "bruyant", il saute sur les écrans

* élaboration d'une recette pour injection dans l'anneau

   -> faisceau transporte jusqu'a l'écran TL/SST.03 ==> le faisceau est très décalé sur la droite (meme avec la recette precedente le faisceau est décalé "all_20230825_16_57_06")

   -> recette sauvegardé : "all_20230927_17_10_22"

à finir au moment de l'injection de demain

  797   Thu Sep 28 08:44:37 2023 KD, DN, IC, VM, VKFixedShift summaryLI | TL | Ring | Opt | Linac Commissionning | Ring Commissioning run du 28 septembre 2023 

8h40: mise en chauffe de la machine (modulateur, chiller, laser, cyclage aimants)

==> La clim de la casemate a été redémarrer ce jour : quelqu'un avait déverouillé manuellement la régulation et éteint le groupe froid à l'extérieur (Sabotage ?) Désecente de la température de la casemate pendant la journée, de 25°C à 21°C

 

*** Programme ***

- injection dans l'anneau et obtenir un stockage stable
    * evaluation des performances de stockage

- stocker de la puissance dans la cavité de facon stable

- trouver les rayons X en mode désynchronisé

- synchroniser la cavité FP et l'anneau

- trouver les rayons X en mode synchrone

Scan charge phase

Align on QP3 with steerer

load recipie 08/28 16.45.

Kevin align laser 5.24; 2.91

No storage.

Problems found: timing of pulsed elenets was wrong, kicker was not triggered.

10.51 Storage

 

Modulator V : 1100 . pour éviter un point autour de 1.64dB de la séction qui "claque" beaucoup

Problems with timing system, jitter between ring and linac. Kevin intervention(15.10) 2x times lower jitter.

Laser phase and energy manual tuning along the run , each 10 mins.

Work on the orbit at 500.25, established good storage, stable orbit, tune  = 3.17 . 

Recipie: # 500.25 MHz MCF 0.02 TL BPM2 4mm  Att 1.842 Good storage At IP BPM readings  x =3 mm y = -2

file: recipe_recipe_LI_TL_RI_all_20230928_15_43_43.txt

# 500.25 MHz MCF 0.02 TL BPM2 4mm  Att 1.842 Good storage At IP BPM readings  x =3 mm y = -2
LI/PS/COL.01/currentSetpointPM : <type 'float'> : 63.58
LI/PS/COL.02/currentSetpointPM : <type 'float'> : 220.0
EL/PS/QP.01/currentSetpointPM : <type 'float'> : 2.7
EL/PS/QP.02/currentSetpointPM : <type 'float'> : -3.8
EL/PS/QP.03/currentSetpointPM : <type 'float'> : 6.4
EL/PS/QP.04/currentSetpointPM : <type 'float'> : 5.6
EL/PS/QP.05/currentSetpointPM : <type 'float'> : -4.7
EL/PS/QP.06/currentSetpointPM : <type 'float'> : 0.0
EL/PS/QP.07/currentSetpointPM : <type 'float'> : -3.0
LI/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -1.26361302428
LI/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.181343322373
LI/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.298179622745
LI/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0577819455818
EL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/QP.01/currentSetpointPM : <type 'float'> : -0.08
TL/PS/QP.02/currentSetpointPM : <type 'float'> : 3.5
TL/PS/QP.03/currentSetpointPM : <type 'float'> : -3.4
TL/PS/QP.04/currentSetpointPM : <type 'float'> : 2.11
TL/PS/QP.05/currentSetpointPM : <type 'float'> : 1.53
TL/PS/QP.06/currentSetpointPM : <type 'float'> : -4.2
TL/PS/QP.07/currentSetpointPM : <type 'float'> : 4.0
RI-C1-C2/PS/SP.03/currentSetpointPM : <type 'float'> : -2.10232230226
RI-C1/PS/QP.01/currentSetpointPM : <type 'float'> : 2.98190476016
RI-C1/PS/QP.02/currentSetpointPM : <type 'float'> : -1.38381809221
RI-C1/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37381809221
RI-C1/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C1/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C1/PS/QP.07/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C1/PS/QP.08/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C1/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95595010278
RI-C1/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73697488985
RI-C1/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C1/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.01/currentSetpointPM : <type 'float'> : -1.05429041718
RI-C2/PS/QP.01/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.02/currentSetpointPM : <type 'float'> : -1.36881809221
RI-C2/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37881809221
RI-C2/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C2/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C2/PS/QP.07/currentSetpointPM : <type 'float'> : 5.72197488985
RI-C2/PS/QP.08/currentSetpointPM : <type 'float'> : -4.94595010278
RI-C2/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C2/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C2/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C2/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.02/currentSetpointPM : <type 'float'> : 4.28000131
TL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -5.0
TL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 1.0
TL/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.075
TL/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : -4.508
TL/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : 4.471
TL/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 8.107
TL/PS/DPI.01/currentSetpointPM : <type 'float'> : 7.8
RI-C1/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.348755052057
RI-C1/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -6.03938458444
RI-C1/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 1.81059006906
RI-C1/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.8368718
RI-C1/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.1069025178
RI-C1/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 2.91014798531
RI-C1/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -1.59301651177
RI-C1/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.76102662193
RI-C1/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : -0.699808993922
RI-C1/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -2.81346754046
RI-C1/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : 0.633858774544
RI-C1/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -6.58936968674
EL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/DPI.01/currentSetpointPM : <type 'float'> : 1.5
RI-C2/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.541923964033
RI-C2/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -7.62132043322
RI-C2/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -1.65386120138
RI-C2/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.06590600871
RI-C2/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : 1.74569887902
RI-C2/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 3.15410183944
RI-C2/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -2.15975369706
RI-C2/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.33603780651
RI-C2/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : 2.02230798878
RI-C2/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -1.51084876179
RI-C2/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : -1.79544220942
RI-C2/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -4.21190265909
EL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
RI-C1/PS/DP.01/currentSetpointPM : <type 'float'> : 159.299592181
TL/PS/DP.01/currentSetpointPM : <type 'float'> : 159.3
EL/PS/DP.01/currentSetpointPM : <type 'float'> : 160.0
TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 5.24
TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 2.91
er/pe/inj_kick_ps/Voltage : <type 'float'> : 5580.26513672
er/pe/inj_kick_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Voltage : <type 'float'> : 106.125869751

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 