  758   Fri May 26 13:56:17 2023 VK, IC. VM, LS Shift summaryRing Commissioning Studies on the beam revolution frequency The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer.
 12x 
  759   Tue May 30 09:44:07 2023 MJ, KDUnder ProcessShift summaryRF Anneau | Ring Commissioning RE: RF et anneau 

Mercredi 24 j'ai fait un test
sur la cavité RF :
  
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  761   Wed May 31 21:36:49 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning RE: Studies on the Ring revolution frequency Bonjour,

Pouvez vous enregistrer les images
de l'oscilloscope et le donnée
  
  762   Wed Jun 7 16:02:33 2023 LS, MB, VC, NDReference SolutionShift summaryRing Programme prise de donnees 8/06 9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification
 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png 
  763   Mon Jun 12 14:52:39 2023 VK, IC. VM Shift summaryRing Commissioning Reestablishing running conditions at 500.38 MHz Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit.
 scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png 
  764   Tue Jun 13 13:51:05 2023 SC, NDNew SolutionInfoLI Effet changement de phase RF Canon sur TL/BPM.02 Quelques changements de phase canon. On
voit que quand l'orbite derive vers des
valeurs negatives sur Tl/BPM.02/SpX le fait
 Screenshot_from_2023-06-13_13-50-23.png 
  765   Tue Jun 13 13:55:41 2023 SC, NDNew SolutionInfoLI RE: Effet changement de phase RF Canon sur TL/BPM.02 Le code lock_position_tl_bpm_02.py a ete
mis a jour pour prendre cet effet en compte.

 
  
  766   Tue Jun 13 14:42:16 2023 Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023FixedInfoLinac Commissionning arręt de la machine Bonjour,

avant d'arrêter completement
de la machine il faut absolument fermer le
  
  767   Tue Jun 13 15:00:28 2023 Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 15:00:13 2023FixedInfoLinac Commissionning arret de la machine Bonjour,

avant d'arrêter completement
de la machine il faut absolument fermer le
  
  768   Tue Jun 13 15:27:35 2023 ND, RCNew SolutionInfoLaser Effet eclairage sur detecteurs RX Effet de l'eclairage dans la casemate
sur les detecteurs a RX (lumiere eteinte
a 15:26:40) => il faut fonctionner avec
 Screenshot_from_2023-06-13_15-27-06.png 
  769   Tue Jun 13 18:06:14 2023 VK, IC. VM, ND, LS Shift summaryRing Commissioning beam storage The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png 
  770   Wed Jun 14 18:18:32 2023 VK, IC. VM Shift summaryRing Commissioning Srart of the beam physics measurements The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 14x 
  771   Thu Jun 15 17:46:40 2023 VK, IC. VM Shift summaryRing Commissioning Orbit correction, BLM in the Ring The BLM detector boxes were installed in
the ring. We connected 3 fibers and 2 scintillator
detectors in th ring to be able to observe
 7x 
  772   Fri Jun 16 09:36:07 2023 VK, IC. VM, AL, ND, LS Shift summaryRing Commissioning Orbit correction, optimization of the storage, study of the RF frequency 9h30 Start of the modulator and lasser
(GATE is closed).

9h46 Data is taken as background.
 8x 
  773   Thu Jun 22 09:26:38 2023 ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RCUnder ProcessShift summaryRing | Ring Commissioning X-rays attempt 22/06 9:23: Mise en chauffe

9:29 Cycle magnets

10:20 Acces casemate cavite CFP
 10x 
  774   Thu Jun 22 11:43:35 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023 Shift summaryLinac Commissionning | Ring Commissioning Bruit de fond diodes ligneX    2023-06-22-bruit-de-fond-diodes-ligneX.pdf 
  775   Thu Jun 22 19:39:58 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023 Shift summaryLinac Commissionning | Ring Commissioning recherche IP e-/laser ** Au vu de ce shift tres instructif
d'aujourd'hui, pour demain:

1)
  
  Draft   Fri Jun 23 09:47:54 2023 VK, IC, DN, RC, JN Shift summaryRing Commissioning search for X-rays 8h30 Start of the modumator, laser, magnet
cycling

9h45 Beam is ON. Scan charge vs.
  
  777   Fri Jun 23 13:56:03 2023 all Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning X detectes aujourd'hui Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec)
 2023-06-23-Shift.pdf 