  684   Fri Feb 17 12:08:33 2023 JNC/CB/HG ProblemLinac Commissionning démarrage 17/02/2023, urgent pb LI SST1, TL SST1  

Démarrage

Pd régulation chiller canon

12h Pb camera TLSST1, état grisée, redémarrage dans astor device error

12h40 pb resolu, intervention de Kevin

 

 

Attachment 1: TLSST_status
Attachment 2: Screenshot_from_2023-02-17_12-10-53.png
Screenshot_from_2023-02-17_12-10-53.png
  685   Fri Feb 17 21:02:38 2023 JNC/CB Shift summaryLinac Commissionning run de 17/02/2023 

Température chiller 32 degrés canon, et section 29.2, moduleteur 1090V

Dimension laser 0.33/0.30mm iris 1.3 --> enregistré dans laser répertoire du jour

Réalignement laser H de 4.63 à 4.75, et V 1.955 à 1.92, mise ne route de l'asservissement

Chute de charge à 290 degrés, on décale de 50 degrés, soit 240 degrés

steerer LI : H1=-1.8A, V1= +0.6, H2=-0.5, V2=0, solenoide à 223A

On reproduit le run de mercredi, lesimages prises sur les différentes stations sont les memes

On travaille un peu sur l'orbite (intervetion BPm de Iryna, sur des seuils) --> recette sauvée

pour quad scan sur TLSST1 : good_20230217_13_09_42

pour espread test test_20230217_14_43

pour TL LE test_20230217_18_47_33

On observe une dérive de la phase de section (dans ce cas, recharger la recette, espread, vérifier le faisceau)

Plusieurs scan ont été réalisés à dépouiller off line et comparer au simulations

Reste à faire :

- les scans de mesures d'énergie à faire canon/section

- améliorer la correction d'orbire

- trouver le faisceau sur l'écran de la LE

  686   Sat Feb 18 14:37:40 2023 Entered by Marie Jacquet from 134.158.205.50 on Sat Feb 18 14:37:01 2023 Shift summaryLinac Commissionning Comparaisons mesures-simuls ASTRA versus I_Soleno - Complements elog 676 et 681 

En pj

Attachment 1: 2023-02-18-elog.pdf
  690   Tue Feb 21 10:23:56 2023 MJ KD HGNot FixedUrgentLinac Commissionning Synchro HS 

10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas ?

c'est bon deremarrage serveur camera

Synchro HS on ne peut rien faire

reboot synthe baie 9 pour acquitter l'erreur network

Ca ne change rien

BESOIN URGENT d'un expert SYNCHRO

 

Attachment 1: sst1
Attachment 2: charge.png
charge.png
  691   Tue Feb 21 12:32:54 2023 NDFixedUrgentLinac Commissionning RE: Tentative identification pb synchro 

Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".

- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.

- Signaux sur les synthe et gene normaux.

- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.

- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.

- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable

Pas d'indication d'un probleme syncho.

 

 

 

MJ KD HG wrote:

10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas ?

c'est bon deremarrage serveur camera

Synchro HS on ne peut rien faire

reboot synthe baie 9 pour acquitter l'erreur network

Ca ne change rien

BESOIN URGENT d'un expert SYNCHRO

 

 

Attachment 1: health_check_2023_02_21_12_34.png
health_check_2023_02_21_12_34.png
Attachment 2: Screenshot_from_2023-02-21_12-39-39.png
Screenshot_from_2023-02-21_12-39-39.png
  693   Tue Feb 21 12:58:08 2023 NDFixedUrgentLinac Commissionning RE: RE: Tentative identification pb synchro 

Pour plus d'explication et d'observation pour tests de vérification :

- La phase canon glissait sans cesse (quelques degrées par minutes) et avait des sautes d'un coup sur l'autre (visible sur le faisceau dans le canon à la phase de focalisation max)

- Il y avait aussi des dérives intermittante de plusieurs degrès d'un coup en plus du glissement plus "doux".

==> hypothèses sur observation : la déclenche du laser ne semble pas stable par rapport au 3GHz boucle canon. Le laser lui semble stable avec le 500MHz qu'il reçoit (lien entre les deux fréquences ?)

    * L'ampli laser est le fautif (après une chauffe de plusieurs heures cela semble étrange et jamais vu).

    * Il n'y a pas de synchro stable entre les deux fréquences (500 MHz Laser et 3GHz canon).

 

ND wrote:

Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".

- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.

- Signaux sur les synthe et gene normaux.

- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.

- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.

- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable

Pas d'indication d'un probleme syncho.

 

 

 

MJ KD HG wrote:

10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas ?

c'est bon deremarrage serveur camera

Synchro HS on ne peut rien faire

reboot synthe baie 9 pour acquitter l'erreur network

Ca ne change rien

BESOIN URGENT d'un expert SYNCHRO

 

 

 

  694   Tue Feb 21 13:20:06 2023 NDFixedUrgentLinac Commissionning RE: RE: RE: Tentative identification pb synchro 

Si c'était un glissement "doux" cela peut-être un problème de thermalisation. Est-ce que la température de l'eau était bonne?

ND wrote:

Pour plus d'explication et d'observation pour tests de vérification :

- La phase canon glissait sans cesse (quelques degrées par minutes) et avait des sautes d'un coup sur l'autre (visible sur le faisceau dans le canon à la phase de focalisation max)

- Il y avait aussi des dérives intermittante de plusieurs degrès d'un coup en plus du glissement plus "doux".

==> hypothèses sur observation : la déclenche du laser ne semble pas stable par rapport au 3GHz boucle canon. Le laser lui semble stable avec le 500MHz qu'il reçoit (lien entre les deux fréquences ?)

    * L'ampli laser est le fautif (après une chauffe de plusieurs heures cela semble étrange et jamais vu).

    * Il n'y a pas de synchro stable entre les deux fréquences (500 MHz Laser et 3GHz canon).

 

ND wrote:

Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".

- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.

- Signaux sur les synthe et gene normaux.

- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.

- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.

- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable

Pas d'indication d'un probleme syncho.

 

 

 

MJ KD HG wrote:

10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas ?

c'est bon deremarrage serveur camera

Synchro HS on ne peut rien faire

reboot synthe baie 9 pour acquitter l'erreur network

Ca ne change rien

BESOIN URGENT d'un expert SYNCHRO

 

 

 

 

  697   Mon Feb 27 19:51:39 2023 CB/JNC Shift summaryLinac Commissionning run du 27 février 2023 

Problème démarrage de caméra LI/SST1 (forcage plosieurs fois), les autres ont redémarrée au deuxième forcage

Température canon 31.75, section 29.2, tension modulateur 1090V

recalage de la phase de le SPL du laser

phase charge max à 234 degrés,

position laser 4.93, 2.32 --> 3.97mm, 1.88mm

Energie 5.2MeV (même calibration que la mesure réalisée le 17 février 2023)

Minimum de dimension à 234 A sur coil2 (contre 225 A le 17 février). Nous sommes donc plus haut en énergie sortie canon (il faudrait refaire l'alignement solénoide, mais pas prioritaire)

Image LISST1 sauvée dans LISST_sol234A

Camera TLSST1 ne s'affiche pas (erreur cntro channel not opened)

Erreur les BPm TL1 :Failed to read_attribute on device tl/dg/bpm.01-lib.02, redémarrer

Réglage énergie, atténuation section modifiée 1.48 > 1.8 dB, réglage phase 110 degrés

quad recette TL SST2 : [-2.5 4.3 -2.1] -->  [-3.5 5.3 -1.2] A, image enregistrée dans TL SST2

Le faisceau "semble" plus stable sur TL SST2

TL SST3 ok dans hellcheck, mais pas fonctionnelle, error control chanel not opened --> redémarrage

Full intensity marche pas

set 1 QP en A [-3.5 +5.3 -1.1 1.98 1.75 -4.16 ] image de chaque station enregistrée

Charge transmise, 95 pC sur toute la TL

recette sauvée dans TL+LE, test recipes comments recette du 27/02/2023

 

 

 

 

 

  699   Wed Mar 1 10:18:28 2023 CB/JNC/MJ/ VK/VM Shift summaryLinac Commissionning run du 1er mars 2023 

9h30 mise en chauffage

Température canon 31.75, section 29.2 degrés

modulateur 1090V

laser image enregistrée, dimension 0.34/0.3 mm

Camera mise on, viewer en defaut, redémarrage

scan charge phase  aux deux position laser :

4.95/2.351 --> position 1 extension charge phase (120 - 250), zomm pas de 1 (chute à )

3.97/1.88 --> position 2 extension charge phase ( 120-250), zoom par pas de 1 (chute à 224)

recette chargée  dans LI+TL+ri, 20230228 16h5145, good, recette ijection EL OK

image LI/ SST (set1), image TL/SST1 (dipole éteint) --> certaienemnt la phase section à reprendre car pas focaliser assez

phase section affichée à 123 degrés, 1.98 dB

ajustement à 110 degrés, on checke avec le dipole (attention 159.3, et dans recette 159.1A)

réglage atténuation section sans QP et sans steerer TL et soleno à 200A --> pour 159.3 A au dipole, 1db

soleno à 225 A, QP4 =0, réglage phase section minimum de dispersion 107 degrés __> TL SST2 (set1)

QP4=1.98A --> TLSST2 enregistrée, m^eme chose sur TL SST1, on baisse un tout petit peu 1.25 dB

hp gui installé dimension aux écrans LI SST1 0.3/0.32mm, TLSST1 3.24/0.16mm, TLSST2 2/0.66 (40 keV, pas optim pour mesure), TL SST3 4.81/0.12mm

Matching avec les twiss suposé (différence à noter entre alignement Marie et Christelle) --> a traiter sur un run dédié

Chargement en A [-0.34 3.48 -3.55 2.02 1.73 -4.06 3.98] A physique [-0.7 10.13 -9.54 6.01 5.2 -10.98 11.49] mesure set 2

changement quad en A [-1.57 4.40 -3.32 1.99 1.75 -4.05 3.94], mesure set 3

changement quad en A : [-1.46 4.52 -3.22 ... ... -4.10 4] mesure set 4

changement quad en A : [] set5

changement quad en A : [-1.5 4.6 -3.26 1.99 1.75 -4.10 4.00] set6

changement quad en A : [-1.65 4.75 -3.44 ... ..... ] set7

changement quad en A : [-1.60 4.67 -3.35 ... ..... ] set8

test anneau a faie avec ces valeurs en bougeant uniquement les steerers pour l'orbite

Ring tests with today transport settings. Check screens and correspondance with simulation at given values.

Injection to the ring OK. Optimisation of Beam injection in the Ring at 159.3 A for Ring dipoles. Successful . Reasonable orbit. 

BPMs LIbera 3,4,5 are not recovered after 1000->10000->5000 turns setting in TBT. Need to reboot hardware.

Need to understand TL optics simulation for today quad settings.

Below are screenshots for exactly the same values as are in the  machine and another one with slight modification by 0.2 A of QP3 (found manually, correspondence not exact).

 

 

 

 

 

 

 

 

 

 

Attachment 1: Screenshot_2023-03-01_at_19.27.13.png
Screenshot_2023-03-01_at_19.27.13.png
Attachment 2: Screenshot_2023-03-01_at_19.26.29.png
Screenshot_2023-03-01_at_19.26.29.png
  704   Mon Mar 6 09:09:52 2023 VCUnder ProcessProblemLinac Commissionning pB synchro suite 

Test des signaux de "Timing" en calle de controle

1- la communication avec l'IHM admin_delays est instable à chaque commande, l'IHM "plante" et je suis obligé de la fermer et de relancer pour pouvoir changer de valeur de retard et ou plus d'1 mn pour pouvoir à nouveau changer de valeur!

2- en sdc le signaux de "timing" sont en phase (DEG 1=> 4 2=>4  3=>4 sdev 140ps) avec une fréquence anneau de 500MHz (rappel fréquence linac 2998.55MHz)

3- changement de la fréquance anneau 500.5MHz (dans l'igloo... je n'ai pas acces au scryp en salle de controle)   pas de changement de comportement (sdev 140ps)    (fin de manip retour à 500MHz)

 

pB resolu:

c'est une perturbation de la PLL*24 dans la trigger box  => elle doit renvoyer du bruit à travers le 3GHz dans ERL 1 à travers le mélangeur.

nous avons déconnecté (alimentation) la PLL.

 

 

 

 

  706   Mon Mar 6 12:16:31 2023 MJ HG KD VCNot FixedUrgentLinac Commissionning URGENT SST off  

Camera SST inutilisable en debut de shift. IL FAUT ABSOLUMENT ARRETER de faire des trucs sur les cameras entre 2 shifts ! je n'ai pas les competences pour remettre les sst en marche. Les boutons n'y font rien;

Nicolas peux-tu agir pour qu'on puisse commencer le shift. Merci

Force kill force start des servers necessaire pour toutes les cameras (merci Hayg)

phase charge max max foc 331 bpmLI 0.6/1.6

charge 65 pC

energie max -50

scan soleno yag1

passage section phase 110 1.42db
scan soleno yag2 a la main car script ne marche pas : shutter pc ne marche plus  ER/HF/RAC.17-API.DO1/DO14

passage TL phase section 110 1.45db

ihm SST HS : se ferme ou pas selon la camera demandee, selon le sens du vent peut-etre, qui sait ...

Plantage camera --> Force kill force start des servers necessaire pour toutes les cameras

modulateur tombe 14h34

Modulateur ON

Synthe_ring passe de 500 a 500.5MHz --> image 2023-03-06_14-44-27.png

Synthe_ring passe de 500.5MHz  a 500 --> image 2023-03-06_14-49-54.png

pB synchro corrigé

données enregistrées (dans mesure)

connecteur ressere ~ 17h20

donnee PiS BPMTL2 enregistree

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: SST_HS_023-03-06_12-14-40.png
SST_HS_023-03-06_12-14-40.png
Attachment 2: 2023-03-06_14-44-27.png
2023-03-06_14-44-27.png
Attachment 3: 2023-03-06_14-49-54.png
2023-03-06_14-49-54.png
  708   Wed Mar 8 11:47:20 2023 Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023 Shift summaryLinac Commissionning (suite elog 28 fev) data X_TLBPM02 vs I_Dipole - Plot Mesures/Simul  

Tue Feb 28 08:48:29 2023

8H50-demarrage chiller et chauffage klystron

   * Laser réaligné avec phase (foc max) et (foc max -3deg).

    - Comparaisson avant (Xlaser = 3.97mm/Ylaser = 1.88mm) et après (Xlaser = 4.95mm/Ylaser = 2.35mm) en P.J avec les screenshots.

Attention, la phase de foc max avait drifté de 3deg pendant l'alignement, les images prise après sont avec background substraction.

   - Position LI/BPM.01 sans steerer : X = 1.2mm, Y = 1.8mm

   - Solenoïde 234A (cf. e-log du 27/02/2023) Phase Canon-Laser (foc max - 50deg). Mesure d'énergie = 5.18MeV, mesure position LI/BMP.01 : X = 1.7mm, Y = 1.1mm (revoir alignement solénoïde)

  * Passage section (1.8dB, phase 110deg)

   - Les BPM saturent (cf. screenshot) ==> on change le power (-57 à -10)

   - Steerer à revoir à cause du point laser procedure pour réalignement  (utilisation script KD de minimisation du déplacement en fonction du PQ) :

      1) LI/STR.01 sur QP.01

      2) TL/STR.01 sur QP.03

      3) rafinement avec valeur de QP.01 à QP.03 et atténuation section OK

==> cf. recette générale : recipe_recipe_LI_TL_RI_good_20230228_16_51_45.txt

   - Position BPM une fois aligné : LI/BPM.01 : X = 0mm, Y = 1.7mm, TL/BPM.01 : X = 0.2mm, Y = -0.2mm

   - Mesure énergie sortie Linac (soléno à 200A) : Calib (28.7/28.6 um/pixel) on obtient 50.4 MeV

  * Passage TL :

   - TL/BPM.02 saturé également cf. image, la puissance est réajusté (-58 à -10)

   - Alignement Horizontal sans QUAD. Pas de désalignement horizontal lorsque TL/BPM.02 X = 0mm TL/BPM.03 et TL/BPM.04 ~ 0mm ==> les paire de dipôles font bien à 90°

   - Alignement des QUAD :

    QP.04 : Ajustement du dipôle pour être sur l'axe mag horizontal ==> dipôle 159.3A à ~ 159.1A, aligné avec QP.01 à QP.03 verticalement

    QP.05 : Ajustement avec QP.04 aligné (DP = 159.1A), TL/STR.02 : H = -8A et V = -4.3A

    QP.06 : TL/STR.02 : H = -3/-5A et V = -4.7A (difficile en horizontal pour cause de saute en énergie)

  * Passage LE (on s'aligne dans QP.04 et QP.05, cf. recette générale) ==> utilisation des valeurs de QP.01 à QP.07 de la recette de Christelle du 27/02/2023 :

     - On rentre dans la LE immédiatement avec EL/DPE = -7.4A et EL/DP = 159.3A ==> alignement pour utiliser EL/DPE = -7.72A (l'alignement se fait sur EL/BPM.01 afin que EL/DPE ne produise plus de shift vertical avec le changement de courant)

     - faisceau intense et visible avec EL/SST.01 à 1s et gain 1dB. ==> caméra EL/SST.01 mal triguée il faut passer à 0.1s pour voir le faisceau

     - Valeur des EL/QP ajusté la main pour avoir un faisceau bien focalisé (cf. photo) ==> cf. recette générale du jour

     - Fin du shift, machine plutôt stable (cf. screenshot BPM)

==> energie finale 49.1MeV (soleno à 200A), et au dipôle 159.3A ==> TL/BPM.02 : X = 0mm ==> pas de shift en énergie

==> phase shift d'environ 10 deg  (cf. courbe).

** Remarques Générales **

- Variation importante de la puissance en sortie Klystron en fonction de la phase caon/Laser. ==> Vincent est en cours d'investigation (surment problème de saturation du PA)

- "Grande" variation de puissance Klystron quelques mm sur TL/BPM.02 ==> correction avec l'atténuation du klystron de quelque 0.01dB (1.8dB -> 1.98dB). En fin de shift c'était beaucoup plus stable plus de reprise de l'attenuation (1.98dB)

- Pas de point de fonctionnement stable plus qu'un autre en fonction (atténuateur et HV modulateur)

==> cf différentes images du jour.

 

- Idipole = 158.5A, TL/BPM.02 : X = 5mm

- Idipole = 159A, TL/BPM.02 : X = 1.8mm

- Idipole = 159.8A, TL/BPM.02 : X = -4mm

        ==> Mesures TLbpm02 vs simul en pj

       ===> TLBPM02 n'est lui non plus pas correctement calibre

 

Attachment 1: 2023-02-28-I_Dip_vs_X_TLBPM02.png
2023-02-28-I_Dip_vs_X_TLBPM02.png
  711   Mon Mar 13 12:18:02 2023 MJNot FixedUrgentLinac Commissionning IHM SST HS - URGENT 

IHM sst HS en debut de shift cf image : toutes les cases show camera sont blanches yag 2 3 4 !! RIEN ne marche

URGENT

Nicolas ?

C'est resolu.

Attachment 1: IHM_HS_2023-03-13_12-42-01.png
IHM_HS_2023-03-13_12-42-01.png
Attachment 2: Screenshot_from_2023-03-13_12-55-32.png
Screenshot_from_2023-03-13_12-55-32.png
  712   Mon Mar 13 12:33:40 2023 Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023FixedInfoLinac Commissionning Laser status 

Bonjour, lundi matin (le 13/03) j'ai trouvé le laser allumé, donc il fonctionne pendant le week-end !!!

Viktor.

  713   Mon Mar 13 13:54:31 2023 MJNot FixedUrgentLinac Commissionning Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!!  

Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !

plus d'acces a la phase canon.

Nicolas t'as fait qqchiose ?

  714   Tue Mar 14 09:14:05 2023 Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023FixedInfoLinac Commissionning RE: Laser status 

Bonjour Viktor,

c'est moi (KD) qui ai allumé le laser lundi matin. Le laser était bien éteint le matin.

++,

Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 wrote:

Bonjour, lundi matin (le 13/03) j'ai trouvé le laser allumé, donc il fonctionne pendant le week-end !!!

Viktor.

 

  721   Wed Mar 29 13:35:25 2023 MJ ProblemLinac Commissionning ICT1 ?? 

demarrage vers 13h

Pb de vide depuis une demi-heure (MV-1 rouge sur le pss) Bruno est venu + Nourredine tel

pb resolu

ICT 1 ne fonctionne pas

ICT1 re fonctionne , par contre pB moyennaage et std   DS mean std ne fonctionne pas bien? 

 

Attachment 1: ICT1_2023-03-29_14-05-01.png
ICT1_2023-03-29_14-05-01.png
Attachment 2: ICT1_2023-03-29_14-06-38.png
ICT1_2023-03-29_14-06-38.png
  722   Thu Mar 30 09:34:24 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 Shift summaryLinac Commissionning Nouvelle position laser/cathode (du 29 mars) 

Nouvelle position laser/cathode du 29 mars : x=4.91mm / y=2.40mm

  723   Thu Mar 30 13:35:13 2023 Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023Under ProcessLinacLinac Commissionning Faisceau Linac 

14h38 : Démarrage faisceau linac

Modulateur 1090V, Position laser horizontale 4.910 mm et verticale 2.40 mm

Iris 1.3 mm

Attenuation laser = 344

Attenuation canon RF = 0.0 dB et Attenuation section = 1.50 dB

temperature consigne canon = 31.50° et temperature consigne section = 29°

Sans solénoide, Phase de charge max = 204 donnée par le scan charge phase du DS, on ne voit pas le faisceau à cette phase, en focalisant le faisceau pour le voir sur l'écran on est dans une gamme de phase allant de 209 à 216

Charge 124 pC

Arret faisceau

Détection de fuite pour le vide en cours

 

  724   Thu Mar 30 17:20:43 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 Shift summaryLinac Commissionning   

Shift ce matin

** YagTL1 vs soleno avec alignement a la Kev ou a la Hayg (mais chaque fois aligne dans Q1-Q3). --> trajet dans la LIL differents - Mesures avec soustraction courant obscurite (df la pj)

** pour Sol=180A, taille sur YAG 1 pour plusieurs str1 ---> taille horix sur YAGTL1 varie de 0.2 a 0.8 (cf la pj)

Meme si le passage dans la LIL avec des desalignement differents a un effet, ca n'explique toujours pas le desaccord data/simul ASTRA ...

Fin de shift vers 13h