684
|
Fri Feb 17 12:08:33 2023 |
JNC/CB/HG | | Problem | Linac Commissionning |
|
démarrage 17/02/2023, urgent pb LI SST1, TL SST1 | | Démarrage
Pd régulation chiller canon
12h Pb camera TLSST1, état |
 |
|
685
|
Fri Feb 17 21:02:38 2023 |
JNC/CB | | Shift summary | Linac Commissionning |
|
run de 17/02/2023 | | Température chiller 32 degrés
canon, et section 29.2, moduleteur 1090V
Dimension laser 0.33/0.30mm iris |
|
|
686
|
Sat Feb 18 14:37:40 2023 |
Entered by Marie Jacquet from 134.158.205.50 on Sat Feb 18 14:37:01 2023 | | Shift summary | Linac Commissionning |
|
Comparaisons mesures-simuls ASTRA versus I_Soleno - Complements elog 676 et 681 | | En pj |
|
|
690
|
Tue Feb 21 10:23:56 2023 |
MJ KD HG | Not Fixed | Urgent | Linac Commissionning |
|
Synchro HS | | 10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas |
 |
|
691
|
Tue Feb 21 12:32:54 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: Tentative identification pb synchro | | Tentative de comprehesion de ce que veux
dire "Synchro HS on ne peut rien faire".
- Health Check: Pb RF resolu par |
 |
|
693
|
Tue Feb 21 12:58:08 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: RE: Tentative identification pb synchro | | Pour plus d'explication et d'observation
pour tests de vérification :
- La phase canon glissait sans |
|
|
694
|
Tue Feb 21 13:20:06 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: RE: RE: Tentative identification pb synchro | | Si c'était un glissement "doux"
cela peut-être un problème de
thermalisation. Est-ce que la température |
|
|
697
|
Mon Feb 27 19:51:39 2023 |
CB/JNC | | Shift summary | Linac Commissionning |
|
run du 27 février 2023 | | Problème démarrage de caméra
LI/SST1 (forcage plosieurs fois), les autres
ont redémarrée au deuxième |
|
|
699
|
Wed Mar 1 10:18:28 2023 |
CB/JNC/MJ/ VK/VM | | Shift summary | Linac Commissionning |
|
run du 1er mars 2023 | | 9h30 mise en chauffage
Température canon 31.75,
section 29.2 degrés |
 |
|
704
|
Mon Mar 6 09:09:52 2023 |
VC | Under Process | Problem | Linac Commissionning |
|
pB synchro suite | | Test des signaux de "Timing"
en calle de controle
1- la communication avec l'IHM |
|
|
706
|
Mon Mar 6 12:16:31 2023 |
MJ HG KD VC | Not Fixed | Urgent | Linac Commissionning |
|
URGENT SST off | | Camera SST inutilisable en debut de shift.
IL FAUT ABSOLUMENT ARRETER de faire
des trucs sur les cameras entre 2 shifts |
  |
|
708
|
Wed Mar 8 11:47:20 2023 |
Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023 | | Shift summary | Linac Commissionning |
|
(suite elog 28 fev) data X_TLBPM02 vs I_Dipole - Plot Mesures/Simul | | Tue Feb 28 08:48:29
2023
8H50-demarrage chiller et chauffage |
|
|
711
|
Mon Mar 13 12:18:02 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
IHM SST HS - URGENT | | IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche |
 |
|
712
|
Mon Mar 13 12:33:40 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 | Fixed | Info | Linac Commissionning |
|
Laser status | | Bonjour, lundi matin (le 13/03) j'ai
trouvé le laser allumé, donc
il fonctionne pendant le week-end !!! |
|
|
713
|
Mon Mar 13 13:54:31 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!! | | Le bouton PHASE CANON sur le panneau
IHM NE FONCTIONNE PLUS !
plus d'acces a la phase canon. |
|
|
714
|
Tue Mar 14 09:14:05 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 | Fixed | Info | Linac Commissionning |
|
RE: Laser status | | Bonjour Viktor,
c'est moi (KD) qui ai allumé
le laser lundi matin. Le laser était |
|
|
721
|
Wed Mar 29 13:35:25 2023 |
MJ | | Problem | Linac Commissionning |
|
ICT1 ?? | | demarrage vers 13h
Pb de vide depuis une demi-heure
(MV-1 rouge sur le pss) Bruno est venu + |
 |
|
722
|
Thu Mar 30 09:34:24 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 | | Shift summary | Linac Commissionning |
|
Nouvelle position laser/cathode (du 29 mars) | | Nouvelle position laser/cathode
du 29 mars : x=4.91mm / y=2.40mm |
|
|
723
|
Thu Mar 30 13:35:13 2023 |
Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023 | Under Process | Linac | Linac Commissionning |
|
Faisceau Linac | | 14h38 : Démarrage faisceau linac
Modulateur 1090V, Position laser
horizontale 4.910 mm et verticale 2.40 mm |
|
|
724
|
Thu Mar 30 17:20:43 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 | | Shift summary | Linac Commissionning |
|
| | Shift ce matin
** YagTL1 vs soleno avec alignement
a la Kev ou a la Hayg (mais chaque fois aligne |
|