  684   Fri Feb 17 12:08:33 2023 JNC/CB/HG ProblemLinac Commissionning démarrage 17/02/2023, urgent pb LI SST1, TL SST1  Démarrage

Pd régulation chiller canon

12h Pb camera TLSST1, état
 TLSST_statusScreenshot_from_2023-02-17_12-10-53.png 
  685   Fri Feb 17 21:02:38 2023 JNC/CB Shift summaryLinac Commissionning run de 17/02/2023 Température chiller 32 degrés
canon, et section 29.2, moduleteur 1090V

Dimension laser 0.33/0.30mm iris
  
  686   Sat Feb 18 14:37:40 2023 Entered by Marie Jacquet from 134.158.205.50 on Sat Feb 18 14:37:01 2023 Shift summaryLinac Commissionning Comparaisons mesures-simuls ASTRA versus I_Soleno - Complements elog 676 et 681 En pj  2023-02-18-elog.pdf 
  690   Tue Feb 21 10:23:56 2023 MJ KD HGNot FixedUrgentLinac Commissionning Synchro HS 10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas
 sst1charge.png 
  691   Tue Feb 21 12:32:54 2023 NDFixedUrgentLinac Commissionning RE: Tentative identification pb synchro Tentative de comprehesion de ce que veux
dire "Synchro HS on ne peut rien faire".

- Health Check: Pb RF resolu par
 health_check_2023_02_21_12_34.pngScreenshot_from_2023-02-21_12-39-39.png 
  693   Tue Feb 21 12:58:08 2023 NDFixedUrgentLinac Commissionning RE: RE: Tentative identification pb synchro Pour plus d'explication et d'observation
pour tests de vérification :

- La phase canon glissait sans
  
  694   Tue Feb 21 13:20:06 2023 NDFixedUrgentLinac Commissionning RE: RE: RE: Tentative identification pb synchro Si c'était un glissement "doux"
cela peut-être un problème de
thermalisation. Est-ce que la température
  
  697   Mon Feb 27 19:51:39 2023 CB/JNC Shift summaryLinac Commissionning run du 27 février 2023 Problème démarrage de caméra
LI/SST1 (forcage plosieurs fois), les autres
ont redémarrée au deuxième
  
  699   Wed Mar 1 10:18:28 2023 CB/JNC/MJ/ VK/VM Shift summaryLinac Commissionning run du 1er mars 2023 9h30 mise en chauffage

Température canon 31.75,
section 29.2 degrés
 Screenshot_2023-03-01_at_19.27.13.pngScreenshot_2023-03-01_at_19.26.29.png 
  704   Mon Mar 6 09:09:52 2023 VCUnder ProcessProblemLinac Commissionning pB synchro suite Test des signaux de "Timing"
en calle de controle

1- la communication avec l'IHM
  
  706   Mon Mar 6 12:16:31 2023 MJ HG KD VCNot FixedUrgentLinac Commissionning URGENT SST off  Camera SST inutilisable en debut de shift.
IL FAUT ABSOLUMENT ARRETER de faire
des trucs sur les cameras entre 2 shifts
 SST_HS_023-03-06_12-14-40.png2023-03-06_14-44-27.png2023-03-06_14-49-54.png 
  708   Wed Mar 8 11:47:20 2023 Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023 Shift summaryLinac Commissionning (suite elog 28 fev) data X_TLBPM02 vs I_Dipole - Plot Mesures/Simul  Tue Feb 28 08:48:29
2023

8H50-demarrage chiller et chauffage
 2023-02-28-I_Dip_vs_X_TLBPM02.png 
  711   Mon Mar 13 12:18:02 2023 MJNot FixedUrgentLinac Commissionning IHM SST HS - URGENT IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche
 IHM_HS_2023-03-13_12-42-01.pngScreenshot_from_2023-03-13_12-55-32.png 
  712   Mon Mar 13 12:33:40 2023 Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023FixedInfoLinac Commissionning Laser status Bonjour, lundi matin (le 13/03) j'ai
trouvé le laser allumé, donc
il fonctionne pendant le week-end !!!
  
  713   Mon Mar 13 13:54:31 2023 MJNot FixedUrgentLinac Commissionning Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!!  Le bouton PHASE CANON sur le panneau
IHM NE FONCTIONNE PLUS !

plus d'acces a la phase canon.
  
  714   Tue Mar 14 09:14:05 2023 Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023FixedInfoLinac Commissionning RE: Laser status Bonjour Viktor,

c'est moi (KD) qui ai allumé
le laser lundi matin. Le laser était
  
  721   Wed Mar 29 13:35:25 2023 MJ ProblemLinac Commissionning ICT1 ?? demarrage vers 13h

Pb de vide depuis une demi-heure
(MV-1 rouge sur le pss) Bruno est venu +
 ICT1_2023-03-29_14-05-01.pngICT1_2023-03-29_14-06-38.png 
  722   Thu Mar 30 09:34:24 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 Shift summaryLinac Commissionning Nouvelle position laser/cathode (du 29 mars) Nouvelle position laser/cathode
du 29 mars : x=4.91mm / y=2.40mm
  
  723   Thu Mar 30 13:35:13 2023 Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023Under ProcessLinacLinac Commissionning Faisceau Linac 14h38 : Démarrage faisceau linac

Modulateur 1090V, Position laser
horizontale 4.910 mm et verticale 2.40 mm
  
  724   Thu Mar 30 17:20:43 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 Shift summaryLinac Commissionning   Shift ce matin

** YagTL1 vs soleno avec alignement
a la Kev ou a la Hayg (mais chaque fois aligne
 2023-03-30-YAGTL1_vs_Soleno.png 