    Reply   Entered by Super Team from 134.158.195.141 on Tue Feb 8 16:04:17 2022; RE:  

Oui j'ai l'impression qu'il y a encore un souci avec redpi,

dis moi quand tu les redemarre

Entered by Super Team from 134.158.195.141 on Tue Feb 8 16:04:17 2022 wrote:

Je pense que l'IHM est morte car elle est figée, il faut redémarrer?

 

Entry   Entered by Nicolas Delerue from 80.119.21.73 on Sat Dec 21 01:08:39 2024; Question de logique... IMG_20241220_132433_1.jpg

Ci-joint, message sur l'affichage à l'entrée de la casemate ce midi.

Question de logique: Si l'accès est interdit aux personnes autorisées, est-il autorisé aux personnes interdites?

Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 

9h10 (ND): Mise en chauffe modulateur et laser

9h15 mise en chauffe Chiller (SC)

Démarrage MPS (DN,SC,NE) :

- Mode anneau sans FP impossible car les vannes cavités FP doivent être fermées pour tourner en mode anneau et on ne souhaite pas fermer ces vannes pour éviter de polluer les miroirs.

- Mode ThomX ie anneau avec FP : Le vide dans la cavité FP est en rouge ce qui empêche l'autorisation de tir. Forçage possible du tir cad si on considère que le vide cavité FP n'est pas un problème et si tout le monde est d'accord.

Seuil du vide modifié dans la cavité FP : tir ok si on allume tous les dipoles (LI, TL, Anneau + une valeur d'injection).

NB : Pour les tirs qui utiliseront la cavité FP dans le futur, il faudra que celle-ci soit démarrée avant la fermeture de la casemate.

 

 

 

 

Entry   HG, MJ; Quads scans Q3 et Q7 + Courbe energie vs Phase section 2025-09-17-Energie_vs_PhaseSection.pdf

Modulateur HT @600 V indecision

Question : Quand on switch off le Dipole de la TL (Linac) le faisceau prend un kick ( - 0.1 mm sur le BPMx,  et 0.2 mm BPMy) --> déjà observé ?

Vers 13h30

Min de dispersion pour phi_Section 246° et Att : 0.15

** Energie vs Ph_sec

Phi246 : Ekin :68.05 (Dispersion min Yag TL2)
Phi248 : Ekin :68.49
Phi250 : Ekin :68.27
Phi252 : Ekin :67.88
Phi254 : Ekin :67.65
Phi256 : Ekin :68.17
Phi258 : Ekin :66.8
Phi260 : Ekin :66.9
Phi264 : Ekin :65.5

244° (avec backlash) pour avoir disp min TL2  -  250.8 dipole pour BPMTL2X = 0

** Quad Scans

Conditions : q1 q2 q3 q4 q5 q6 : -0.25  / 4.9 / -4.77 / 2.94 / 2.94 / -5.6

Scan Q7 a Phi_sec=248
       emitX=3.1  (14h04)
       emitY=2.2  (13h59)

Dipole OFF  -  Scan Q3 a Phi_sec=248  (14h56 seulement car probleme de code qui beuguait)
       emitX=1.6
       emitY=3.9

Dipole ON  -  Scan Q7 a Phi_sec=248 (bis)   15h08
       emitX=2.8
       emitY=2.6

Dipole ON  -  Scan Q7 a Phi_sec=248 (ter)   15h14
       emitX=2.8
       emitY=2.5

Dipole ON  -  Scan Q7 a Phi_sec=246   15h17
       emitX=2.3
       emitY=2.5

Dipole ON  -  Scan Q7 a Phi_sec=244   15h23
       emitX=3.1
       emitY=2.4

Dipole ON  -  Scan Q7 a Phi_sec=246 (bis)   15h35
       emitX=2.5
       emitY=2.8

Dipole OFF  -  Scan Q3 a Phi_sec=246  15h39
       emitX=1.7
       emitY=3.6

** Check min espread ecran TL2 : min espread ph_sec 245-246   (15h43)

** De nouveau Energie vs Ph_sec (q1 q2 q3 = 0) (pour voir precision, effet aller-retour, backlash)   (16h)

Data ci-dessous ==> data traitees : cf. pj

Phi245 : Ekin :68.7
Phi246 : Ekin :69.0
Phi247 : Ekin :69.0
Phi248 : Ekin :69.9
Phi249 : Ekin :68.5
Phi250 : Ekin :68.4
Phi252 : Ekin :67.7
Phi254 : Ekin :67.1
Phi256 : Ekin :67.3
Phi260 : Ekin :67.0
Phi264 : Ekin :64.3
Phi267 : Ekin :62.9

Je repars de plus bas et je monte
Phi225 : Ekin :67.4
Phi215 : Ekin :64.5
Phi225 : Ekin :65.2
Phi230 : Ekin :67.5
Phi235 : Ekin :68.2
Phi235bis : Ekin :68.7
Phi235ter : Ekin :68.1
Phi237 : Ekin :67.8
Phi239 : Ekin :68.3
Phi240 : Ekin :69.0
Phi241 : Ekin :68.9
Phi242 : Ekin :69.3
Phi243 : Ekin :68.7
Phi244 : Ekin :69.9
Phi245 : Ekin :69.8
Phi246 : Ekin :69.5
Phi247 : Ekin :69.4
Phi248 : Ekin :68.7
Phi249 : Ekin :68.4
Phi251 : Ekin :68.2
Phi254 : Ekin :64.3
Phi254bis : Ekin :68.3
Phi257 : Ekin :67.9
Phi262 : Ekin :66.7

Je redescends
Phi257 : Ekin :66.0
Phi257bis : Ekin :68.4
Phi257ter : Ekin :66.0
Phi257quatro : Ekin :67.2
Phi254 : Ekin :67.0
Phi251 : Ekin :67.6
Phi248 : Ekin :67.7
Phi248bis : Ekin :67.8
Phi247 : Ekin :69.5
Phi246 : Ekin :69.2
Phi246bis : Ekin :68.3
Phi246ter : Ekin :68.3
Phi246quatro : Ekin :69.9
Phi245 : Ekin :69.3
Phi244 : Ekin :69.8
Phi244bis : Ekin :67.7
Phi244ter : Ekin :67.3
Phi244quatro : Ekin :69.2
Phi243 : Ekin :67.2
Phi242 : Ekin :68.3
Phi241 : Ekin :69.0
Phi240 : Ekin :67.0
Phi237 : Ekin :69.7
Phi235 : Ekin :67.0
Phi232 : Ekin :68.6
Phi232bis : Ekin :68.5
Phi228 : Ekin :66.1
Phi225 : Ekin :66.4
Phi225bis : Ekin :67.2
Phi225ter : Ekin :66.9
Phi225quatro : Ekin :65.5

 

 

 

 

Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:02:45 2022; Q beam versus E laser 

9H demarrage chauffage Klystron + frigo

9H 10 demarrage chiller canon et section

Entry   Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025; Programme shift (X-rays spectres vs atte & phases) 

08h17 Warm-up ThomX: Modulator, Laser, Fridge

08h24 Chillers were started, cycling all magnets

09h18 HV is ON

09h21 HV 1215 V

The receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers were adjusted

10h10 RF Gun phase 202 dg., Sect Phase 206 dg., Sect. Att. 2.57 dB, Linac steerers: H [0.61 -2.91], V [-2.63 3.21], Laser Att. 274, Charges (BPMs): -94 -94 -97 -97 pC TL/BPM02 X = -1 mm

10h20 Beam in the ring. RF cavity 100 kV, phase 6.5 dg. 

the receipt saved: recipe_recipe_LI_TL_RI_good_20251030_10_50_55.txt

The good receipt saved to references 50MeV_last....

17h10 Stop ThomX

Shift Program

  • Start the Archivage OK

  • Align 50 MeV beam in QP1 QP3 with Kevin script

  • TL_bpm2 : adjust espread and put beam at x=0

  • Store the beam in the ring with an orbit as flat as possible around the IP

  • Make a vertical FPC scan - Then put the table at maximum OK

  • Align the CdTe spectro on the on-axis position, approximatively by eyes with the Photonic science camera ==> take a spectrum OK

  • Change gun phase only  OK

in positive direction   ==> take a spectrum
return to "nominal"      ==> spectrum
in negative direction ==> spectrum
return to "nominal"      ==> spectrum
  • Change section attenuator only ==> idem (positive, "nominal", negative, "nominal") ==> 4 spectra  OK

  • Change the section phase only ==> idem ==> 4 spectra  OK

To not be affected too much by the motor hysteresis and by the boucle d'eau, "nominal" means that the beam has to return to its previous X position on TL_bpm2

Entry   ND, Sandry Wallon; Programme prise de donnée 9/03/2023 health_check_2023_03_09_10_51.pnghealth_check_2023_03_09_11_30.pngscan_charge_phase_min_20.0_max_60.0_12_2_35.png

9h15 Les stations etaient laissees ouvertes

9h15 Mise en chauffe modulateur

9h30 PSS gele => Appel MO

10h15 PSS gele. MO non joignable=> Appel PCR.

10h30 Intervention PCR => PSS redemarre => Vannes et gauge du linac en erreur (pression a 10-3mbar)

10h45 Appel groupe Vide => Intervention Bruno Mercier (pb coupure courant ; au retour du courant, toutes les alim ne se remettent pas en fonctionnement) ; retour au vert après acquitemment sur MPS

10h51 : nombreuses erreurs dans health check

11h05 : Perte adresse IP icepaps ? => Alim icepaps off puis on ;

11h30 : Pb health check résolu

12h00 : phase réglée à 1 deg

15h00 Analyse stabilite BPM linac

16h45 Faisceau dans TL

Mesure position vs TL/DP.01

18h05 Stop ThomX

 

 

===

Programme de la prise de donnée:

1) Démarrage du faisceau, transport dans TL et si possible EL

2) Mesure bruit sur chaque BPM: acquisition avec faisceau stable, comparaison avec écran

a) LI+TL ligne directe

b) LI+TL+EL

3) Même mesure avec variation de la charge

a) Gain contrôlé manuellement

b) Changements de gain automatique

4) Mesure de la position mesurée en fonction du courant dans TL/PS/DP.01

5) Mesure de la position mesurée en fonction du courant dans les actuateurs de la TL puis du linac

Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022; Programme prise de donnée 28/10 

 

 

===

Program for the shift on 28/10

0) Git pull

1) Start beam

2) Measure respone of TL/SST.2  as function of time

3) Try to put TL/SST2 on negative polarity

4) Study BPM attenuation

 

Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png

9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve.

Observation des soufflets pres de RI-C2/AE/DP.04 ils semblent legerement deformes mais pres de RI-C1/AE/DP.01 aussi.

11:30 Tentative de demarrage mais probleme temperature eau...

12:00 Intervention Maher. Demarrage possible.

Pb declenchement wavecatcher... Resolu (le serveur etait plante)

14:00 BPM polarity studies

15:30 Measure frequency

16:30 To to steer the beam around the chamber

18:20 Stop

 

===

Programme de la prise de données du 8/06:

0) During warm up:

0a)check physically BPMs where there seem to be a polarity issue (needs 2 persons, a battery and a multimeter).

0b) CHeck vacuum chamber around RI-C2/AE/DP.04

1) Transport to TL/FC.01 (TL/DP.01 off). Record FC  signal

2) Transport to TL/SST.02 and TL/BPM.02. Record BPM adc signal while closing dispersion (for Mouad's studies).

3) Transport to EL/FC.01. Record FC  signal and compare with TL/FC.01. If needed swap filters and compare again.

4) Activate position feedback on TL/BPM.02

5) Inject in ring, no RF power. Record with high res oscilloscope travel time for different magnets settings. If needed use a mixer.

6) Study the effect of correctors around RI-C2/AE/DP.04

7) Use extraction kicker scan to measure beam travel time after several turns

8) Finish BPM polarities study

9) Repeat (5) and (7) with different RF powers at 2 different frequencies (500.0202MHz and 500.4MHz). Look at oscillations on TbtX and TbtY vs frequency.

 

Entry   Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025; Programme mercredi 2/04 spectres_synchro_desynchro.png

9h: mise en chauffe machine depuis bureau (Modulateur, laser, frigo/chiller, cyclage aimants)

Problème sur les Dipôles TL et EL (erreur à acquitter sur place)
Erreurs acquittees

Pas de timing (oscillo plat diode chassi synchro eteinte) - Appel Vincent - J'attends qu'il passe .....
11h30 Fixed frequency and trigger issue - Probleme resolu (bouger frequence dans panneau cavite RF ...)

Modulateur ON

11h59 RF gun phase is 222 dg. Sect. phase is 205 dg., Att. 2.534 dB, linac steerers H [0.75 -2.88], V [-3.36 2.8], Charges: -91 pC, -90 pC, -100 pC

12h05 The beam passed to the ring after the DP ring power supply was reset. Receipt from 20250321_12_30_52.

Problem with RF Cav. interlock - Appel Mohamed
12h40  The “Start RF” button does not start the RF cavity power supply, fixed by restart RF cavity PID

13h15 Beam in the ring, RF gun phase is 222 dg. Sect. phase is 209 dg., Att. 2.47 dB, Charges: -93 pC, -92 pC, -102 pC, RF cav. at 150 kV, phase 24 dg. Freq. 500.10051 MHz, manual shifter 3087, ring chrge stability: 2.4% rms during 220 s 

Pb signal synchro cavite FP
14h11 The modulator set to 'Standby' the RF cavity stoped.
14h30 Access to the bunker - pb fixed

14h42 HV is 'ON' 

14h57 RF Gun phase is 217 dg., Sect. phase is 209 dg.  RF Cav. 150 kV, phase 22.5 dg., Freq. 500.10051 MHz, TL/BPM2 X= 4 mm

X-rays vers 15h30-16h

---------------------------------------------

Programme shift 02/04

A 50 MeV :

** Prendre un spectre en mode SYNCHRO
** Prendre un spectre en mode DESYNCHRO

      - completement desynchro = sans aucun pics
      - sans changement des conditions anneau)
        (le but est de voir si c'est sensiblement different ou non)

FAIT - cf pj  ( ...... ??? a expliquer ...)

** Calibration positions fente 2 vs hexa echantillon

** Demarrage commissioning transfocateur avec camera photonic science
         Pas demarre

5h45 Stop ThomX

 

Entry   Entered by Super Team from 134.158.195.142 on Fri Jan 14 11:10:43 2022; Programme journée 

Programme de la journée (AlexM, ND, SC, 2 étudiants M2) :

  • Mesure de charge
  • OTR
  • Mesure de charge avec BPMs
  • Tests DS fréquence
  • Test tir unique avec faisceau
Entry   ND, AM, VC, ML, SC; Programme faisceau 15/9 2022-09-15_scan_charge_phase.png

15-09-2022:

Marie Labat, VC, ND, AM

9h30 Mise en chauffe modulateur tombe

10h Mise en cyclage des aimants

10h Modulateur tombe

10h10 PB air comprime, RI/PS/DP aimants en defaut

10h20 Le modulateur ne redemarre pas

10h30 L'alignement de la ligne Cerenkov a été amélioré (point (1) du programme) mais n'est pas terminé.

10h30 L 'une des balises de mesure des radiations est en defaut (2 fois)

11h10 Balise reparee, pb MPS

11h45 C'etait un probleme d'eau arrete (pas de bruit). Il fallait appuyer sur le buton jaune rearm. de l'armoire electrique des pompes.

11h50 Modulateur en chauffe

Pb aimants.

12h20 Cyclage dipoles en cours

13h : Faisceau
13h15 modulateur tombé (redemarrer sans pb)

scan charge-phase => charge Max : 360
Charge energy max : 320

13h45 : modulateur tombé

14h00 Mesures intensité sur les caméras en fonction du retard (point 3 du programme)

17h Jitter sur faisceau en fin de linac et apres dipole

Claquages observés sur les cameras

 L'énergie du faisceau est trsè basse (courant dipole à 154 A pour voir le faisceau sur TL/SST .02

18h05 : fin du run 

===

Programme pour le faisceau 15/9

*** Accès casemate

1) alignement Cerenkov + retournement des caméras (Démarrage machine à 10h30 au plus tard).

***  Faisceau linac

2) Observation Cerenkov jusqu'à 12h

*** Faisceau LI+TL+EL

3) Mesure intensité vs retard sur chacune des stations SST LI+TL+EL

4) Injection anneau

5) Balayage en temps du Septum. Observation de l'effet sur RI-C1/DG/BPM.02 et BPM.03

6) Balayage en tension du Septum. Observation de l'effet sur RI-C1/DG/BPM.02 et BPM.03

7) Balayage en temps du Kicker. Observation de l'effet sur RI-C1/DG/BPM.03

8) Balayage en tension du Kicker. Observation de l'effet sur RI-C1/DG/BPM.03

9)Try to use TL/PS/STR.04 V+H to try to optimise the trajectory in the ring (I will use the QP values that were saved tonight).

10) Adjust RI-C1/PS/DP to center the beam in the BPMs

11) Use steerers before each BPM to try to center the beam in that BPM. See how far we can go like this...

 

 

 

Entry   Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025; Programme de la journee : preparation des valeurs a remplir  Compare_Align_ALL.pngTrend_Position_Yag_Sautes.pngJauges_2025-03-06_18-47-14.png2025-03-06-Q1Q3_Q4Q5.pdf

1 : Alignement Axe Q1-Q3 avec SCRIPT - Conditions : 5Hz et Q2 = 0

Str1_H =0.49
Str1_V =-3.10
Str2_H =-2.85
Str2_V =3.29

Feedback linac mis sur ON
Mesure avec Q1 Q3 ON

bpmTL1_X =-0.56 / -0.50 / -0.54
bpmTL1_Y =0.02 / 0.04 / 0.01
YagTL1_X =338 / 348 / 347
YagTL1_Y =268 / 269 / 264

2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V=0

Repasser en Linac

bpmTL1_X = pas remesure
bpmTL1_Y =   ¨
YagTL1_X =    ¨
YagTL1_Y =    ¨

3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = -8.10

4 : Determiner StrTL2_V pour passer au centre de Q6 - Condition : eteindre Q5

StrTL2_V = -7.90

5 : Determiner StrTL2_V pour passer au centre de Q7 - Condition : eteindre Q5 et Q6

Pas possible d'eteindre Q5 et Q6 a la fois. On se met a Q5 =0 et Q6=-4
150 microns de variations avec +/-3 ampere sur Q7

==> centre Q7 ok avec la valeur str de Q6

Courbe ROSE sur la pj

--------------------------------------------------------------------------------------------------------

6 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)

Str1_H =
Str1_V = -2.60
Str2_H =
Str2_V = 3.29

6/2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V= -5.6

Repasser en Linac

bpmTL1_X = -0.38 / -0.40
bpmTL1_Y = 1.98 / 2.07
YagTL1_X =  402 / 402
YagTL1_Y = 275 / 274

6/3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = + 8.7

Courbe BLEUE CLAIRE sur la pj

--------------------------------------------------------------------------------------------------------

On recommence encore avec un autre axe

7 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)

Str1_H =
Str1_V = -3.2
Str2_H =
Str2_V = 3.29

6/2 : Determiner StrTL1_V pour passer au centre de Q4

StrTL1_V= +2.3

Repasser en Linac

bpmTL1_X = -0.34 / -0.33
bpmTL1_Y = -1.19 / -1.18
YagTL1_X =  403 / 403
YagTL1_Y =
256 / 256

6/3 : Determiner StrTL2_V pour passer au centre de Q5

StrTL2_V = ¨-15 ... 17¨ estime car en bout de course

Courbes ROUGE sur la pj (2 courbes pour 2 steerers StrTL2_V differents , mais ca ne change presaue rien)

==> On ne comprend rien (bug code reconstruction peut-etre?)

==================================================

18h Etude kicks faiscau sur LI (Yag et BPM)

Steerers OFF
Soleno 200

Kicks visibles sur Yag (cf screenshot)
Correles avec jauge 2 et jauge 3
Kicks declenches par la jauge 3 (puis la jauge 2 se declenche juste apres) - Vu en direct - Data sauvees

19h fin de shift

===================================================

Post shift : autre reconstruction des axes Quads, avec un code "Marie" - Cf pj

 

 

 

 

Entry   shift team; Production de rayons X Scan_vertical_recherche_rayonsX.pngSynchronized_Xray.pngtbtsum_trend_all.pngcharge_18h.png

demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route 

 

Programme :

* injection faisceau dans l'anneau 

    Phase canon charge max (86°)
    Energie Max (36°) avec 100pC

     -  On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte

* Stockage puissance Laser

* Recherche des rayons-X en phase (500MHz, 33MHz)

      -  Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau

      - On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z

      - On essaye de synchroniser

Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V

Phase 33MHz 265°

Delay scope Laser/Trig : 1.25ns

On fait un scan vertical de la table en désynchronisé (impossible en synchrone)  

(~80 pC injecté et ~ 83kW dans la cavité)

* Mesure flux, stabilité spectre des rayons-X

Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)

 

Vers 18h :
   La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
   Idem TBT sum trend plus stable après.

 

Entry   Entered by Moutardier Alexandre from 134.158.195.144 on Tue Nov 30 17:11:17 2021; Problème pc client2 

Le client 2 a freeze.
Il était impossible de fermer les intefaces ouverte, d'ouvrir un nouveau terminal, de ce déconnecter ...
Parfois il fasait in bruit similaire a celui qu'on n'a lorsque l'on reste appuyé sur la touche retour sur un terminal.
J'ai essayer de me connecter depuis un autre client et la connection ssh ne voulais pas ce faire non plus.

Le pc a était éteint de force. Il semble refonctionner maintenant.

Entry   Entered by sophie chance from 134.158.89.243 on Fri Oct 29 11:19:37 2021; Problème modulateur 

Scandinova a été contacté, pas de retour pour l'instant.

Harware reset pour voir si cela améliore les choses pour la suite de la journée en attendant la réponse de scandinova

En chauffe pour l'instant.

Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 18 13:46:53 2022; Problème anoxie réglé 

Plus de défaut d'anoxie, le disjoncteur d'alimentation du détecteur était mis sur off.

Le problème est réglé.

Entry   Entered by Moutardier Alexandre from 134.158.195.144 on Fri Oct 29 10:51:23 2021; Problème Modulateur 

Un interlock modulateur tombe a chaque fois avant que la chauffe ne soit fini.

Maher doit recontater le fabricant et essaye de regler le problème.

En attendant on ne peut rien faire.

Entry   Entered by SC/HG/VC from 134.158.195.141 on Fri Feb 11 10:57:02 2022; Problème DS calc et miroirs 

Impossible de faire bouger les miroirs

Failed to connect to device calc/sy/freq : impossible d'ouvrir l'interface

Entry   Entered by SC/HM/OD/VS from 134.158.195.141 on Fri Feb 11 13:30:23 2022; Problème DS calc et miroirs 

Le problème de commande des miroirs laser est résolu.

La procédure après coupure de courant et en cas de problèmes moteurs est :

- Eteindre et rallumer les IcePap en hard (baie 6 et baie 17 pour les miroirs lasers M4 et M5)

- Ouvrir Astor. Aller dans divers/ srv-3

- Restart level 1 de la baie 6 pour le miroir 4 (Icepapcontroller/Icepap-B6)

- Restart level 1 de la baie 17 pour le miroir 5 (Icepapcontroller/Icepap-B17)

- Restart ou start des DSs moteurs level 2 : Icepapcontroller/mot-mir4* et Icepapcontroller/mot-mir5*

 