HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 30 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast 
Entry   IC, VM; Restart of the accelerator GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png
Entry   IC, VM; Restart of the accelerator Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png
Entry   IC, VM; Restart of the accelerator Screenshot_from_2026-06-26_15-41-00.pngIMG-20260626-WA0001.jpgScreenshot_from_2026-06-26_16-07-50.pngScreenshot_from_2026-06-26_17-17-00.png
Entry   VC; redpitaya 
icon1.gif   Hayg; DS pour les températures des chillers 
Entry   Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021; Alignement PhotoCathode Image__2021-07-15__12-34-45_PCVirtuelle.bmp
    Reply   Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021; RE: Alignement PhotoCathode Image__2021-07-15__12-34-45_PCVirtuelle.bmp
icon3.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021; Comment éteindre le laser 
Entry   Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021; energie laser 
Entry   Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022; Iris Motorisé 
Entry   Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022; Paramètres Faisceau 
Entry   VK, AL, IC; Beam is stored 6x
Entry   Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023; référence axe mag Canon 
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
Entry   KD; run du 27 septembre 2023 
Entry   Entered by Super Team from 134.158.195.141 on Thu Oct 5 08:38:51 2023; run du 5 octobre 2023 
Entry   KD; run du 6 octobre 2023 
Entry   KD; shift du 10 octobre 2023 
Entry   KD; shift du 11 octobre 2023 
ELOG V3.1.4-395e101