  572   Mon Oct 3 12:51:26 2022 Slava, Viktor M, IrynaFixedProblemRing Commissioning Check the QUADs in the ring 

On last Friday, we found that there is a potential problem with QUAD 9, 10 an 12 as by switching them OFF, we obtained better transport and finally had the evidance of the seconf full turn.

RI-C2/PS/QP.09

RI-C2/PS/QP.10

RI-C2/PS/QP.12

Today, we checked the polarity and found that the polarity of the RI-C2/PS/QP.10 was inversed at the level of power supply (even though was checked last time in July). We have restore the good polarity of the RI-C2/PS/QP.10 by swapping the cables at the PS. 

We plan to check the beam transport in the afternoon.

  Draft   Mon Oct 3 14:08:06 2022 VC/KD/SCNew SolutionLinacLinac Commissionning Faisceau linac 

13h : MO : Mise en chauffe modulateur et mise en route refroidissement

14h : Fermeture casemate, démarrage

Problème avec client 2

14h11 : Cyclage des aimants de la TL

Démarrage modulateur, Interlock vide sur le MPS

Mesure Pic environ 216mV et Prc environ 14 mV (mesure moyennée prise en fin de pulse)

Mise en route du feedback position laser

Phase de charge max = 266 degres

Iris 2 mm charge = 35 pC +/- 14 pC

Iris 1 mm charge = 10 pC +/- 14 pC

Iris 3 mm charge = 67 pC +/- 15 pC

Mesure energie faisceau, phase canon = 226 et phase section = 96

 

remarque: quand on sauve une recette avec IHM recette, les valeurs sauvées sont les valeurs de commande des éléments. (meme si les valeurs ne sont pas validées et effectives dans les éléments) lors du chargement des recettes nous avons eu des surprises!

 

 

 

 

 

 

 

 

  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored 

Shift started at 18h

With the current injector settings, it was difficult to inject.  We loaded the settings from last Friday 30/09 (19-22-04).

 

Principal steps:

- Correction of the one quadrupole polarity this morning

-injection tuning, observation of Turn-by-Turn-X, Turn-by-Turn-Y and Sum

-quads focusing, defocusing +-.0.5%

-iterative manual adjustments of corrctors, DPI, Septum, Kicker

-orbit correction with open line model response matrix 

- several datasets taken for further postprocessing

 

Beam is stored !!!!! ~400 turns (limited by the Libera response)

 

Stored beam, visible  more than 300 turns,  signal decay as estimated  due to Libera cutoff filters. To store more, RF cavity should be used.

Stable closed orbit!

Important milestone is achieved.

No losses at scintillator/fiber except for the injection, see oscilloscope screenshot.

Current machine settings are stored in recipe_recipe_LI_TL_RI_20221003_20_24_01.txt

Orbit is stable for more than one hour. End of the shift.

 

 

 

  Draft   Tue Oct 4 15:47:22 2022 MJ/HG/SC LinacLinac Commissionning Alignement linac 

Modulateur HV=1090V enregistrement des Pic

Faisceau linac en cours

Programme : Mesures d'alignement linac

 

  Draft   Tue Oct 4 17:34:09 2022 Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 Shift summary  Planning shift Thursday 6th October 

- Study beam position on SST and BPM vs iris size / TL/BPM.01

- Start AcQAttrManager

- Study RDP vs TL/BPM.02

- Start MRSV

 

  Draft   Wed Oct 5 19:02:28 2022 VK, VM, HG,IC, AL      

Shift started with machine receipy from Monday .

Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.

15.55 Energy , charge not stable, asked Hayg to stabilize .

Ring Dipoles up 160.4A

Problem with steerers : RIC2 STR02-V01 and RIC1/ STR.05-H01 NEED TO BE REPAIRED

Fixed orbit correction gui. Units in libera are [nm] should be in [mm] to correctly scale currents.

 

 

 

 

 

 

 

 

 

  578   Thu Oct 6 10:18:03 2022 VK/ND/SC AnneauRing Commissioning Faisceau Anneau 

Modulateur Impossible à passer en Standby ==> problème manque d'eau.

      * Remise à ~4bars le réseau principal

      *  Restart du soft du modulateur (sinon l'erreur reste)

      * Conductivité à 7MOhm

10h : Démarrage modulateur et refroidissement (MO)

Modulateur 1090V, Mise en place du feedback position laser

Scan charge phase avec iris à 4 mm, phase de charge max phi = 366 degres

Iris 4 mm  Qmax sur LI/SST.01 = 80.7 pC std 14.2

Iris 3 mm Qmax = 64.6 std 14.2 pC

Iris 2 mm Qmax = 32.4 std 11.2 pC

Iris 1 mm Qmax = 10.4 std 11.9 pC

Mesure energie avec les steerers : 52 MeV

Chargement recette du vendredi 30/09 (19-22-04)

-------------------------------------------------------------------------------------------------------------

Problème licence matlab :

Warning: Directory already exists. 
> In quad_TLSST1_thomx_Dark_dim_bary_v3 (line 87) 
License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.

Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4

Diagnostic Information:
Feature: Image_Toolbox
License path: /data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.

Error in quad_TLSST1_thomx_Dark_dim_bary_v3 (line 154)
        h1=drawrectangle('Position',[length(K(1,:,1))/2-50 length(K(:,1,1))/2/2-50 50 50]);pos = round(customWait(h1));% position signal

-------------------------------------------------------------

Faisceau pour anneau

Ouverture iris 2 mm (25 pC environ)

Ouverture iris 4 mm Qenergie max = 66 pC (phi energie max = 216)

Ok pour injection et tours dans l'anneau

Sauvegarde recette recepe_LI_TL_RI

 

13h13 Recipe saved for the ring. Injection optimised.

14h Camera MRSV non accessible => a verifier dans la casemate

14h05 etude de l' effet de l' iris laser sur LI/DG/BPM.01. Les 4 copies d'ecran correspondent a 4 valeurs d'iris different de 4mm a 1mm.

16h Etude systematique de la position sur LI/DG/BPM.01 vs iris. Cf images jointes.

L'attenuation etait trop forte, a basse charge (iris ferme) la position etait domine par le bruit.

Si l 'attenuation est trop forte (32dB), les mesures saturent. Il faut regler l 'attenuation de LI/DG/BPM.01 a -15dB.

Étude similaire sur TL/DG/BPM.01. Cf images jointes. Il faut regler l 'attenuation de TL/DG/BPM.01 a 0dB.

Arret machine 16h26.

Note: RI-C2/DG/MRSV n'était pas branché. Il va falloir se procurer les câbles correspondants.

 

 

 

  579   Fri Oct 7 00:30:24 2022 Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 Shift summaryLinac Commissionning shifts LINAC 4/10 et 6/10 

4/10 : Prise de donnees "Alignement LINAC" (Hayg Marie)

Iris 1.5

Charge Ict_LI : 18-20 pC

E_canon = 5.2 MeV

Charge Ict_TL : 16-18 pC

E_section 52 MeV

CR a venir

06/10 17-20h30 Prise de donnees "Alignement LINAC (Marie)

Iris 1.5

Charge Ict_LI : 48-49 pC

E_canon = 5.3 MeV

Charge Ict_TL : 18-20 pC

E_section 53 MeV

CR a venir

ict_LI ~ 48-49 pC et ict_TL ~ 20 pC. Aucune valeur de steerer ne m'a permis de transmettre plus ... Je ne comprends pas pourquoi on perd un facteur 2 aujourd'hui en passant la LIL et/ou pourquoi en sortie canon  on a ~50 pC aujourd'hui et seulement 20 mardi ... A suivre

  580   Fri Oct 7 11:57:24 2022 IC, VM, VK, AL, JHUnder ProcessShift summaryRing Commissioning Optimization of the ring 

Start of the modulator at 9h45

11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller for RF gun. We stopped at the settings as attached.

12h20 Trying to set-up the beam

13h Problem with the Linac Trigger Laser delay, laser pulse is after the RF pulse end (see screenshot attached). We tried to ajust the delays but inthis case the dark current is very large ~80 pC, bigger then the actual beam charge. We came back to the initial settings.

Not clear what has been changed since yesterday. Need help from the injector team.

15h30 Problem is solved. It was the wrong value of the Largeur pulse HT. The nominal value is 5 us.

16h Setting the injector and try to inject in the ring

Optimization of the TL. It would be really good to have the

- Closed dispersion

- Beam centered in the QUADs (at least 2 last ones)

The TL was set, so that we can inject with almost no losses (see screenshot)

Was difficult to get several turns. It turnned out that the kicket timig was not correct. Not clear who chqnge it.

19h We reistablished the storage and try to optimize it.

 

  581   Mon Oct 10 14:44:44 2022 KD, VS, SCFixedShift summaryLI | Laser shift du 10 octobre 2022 

Viktor est intervenu ce matin pour réaligner le laser sur un autre point du chemin optique (éviter la partie endommagée des miroirs). 

Nouvelles mesures d'énergie :

Iris 3mm - 92µJ

     2mm - 62µJ

     1mm - 23µJ

14h46 Démarrage du modulateur 

--> mesure scan-charge phase à 1mm d'iris : ~ 69pC charge max.

==> nécessité de mettre en place un telescope pour augmenter la charge. 

* Prise de mesure pour alignement photoCathode.

Mise en place du téléscope /2. 

iris 3 mm : 120uJ

      2 mm : 97 uJ

      1 mm : 57uJ

Tout semble Ok. Mesure de la charge à 1mm et ajustement avec l'atténuateur. 

Le PA a disjoncté ==> Maher doit intervenir dans le modulateur. Mesure de charge à faire demain. 

 

  582   Mon Oct 10 15:10:36 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 15:10:21 2022FixedInfoLinac Commissionning Laser status 

Bonjour, l'énergie UV actuelle sur la cathode:

Iris 3mm - 92µJ

     2mm - 62µJ

     1mm - 23µJ

Viktor.

  583   Mon Oct 10 17:20:11 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 17:19:55 2022FixedInfoLinac Commissionning Laser status 

Bonjour, un téléscope (F1=150mm, F2=-75mm, réduction=2) a été installé sur la table optique dans la casemate (la monture du téléscope est très instable !!!)

l'énergie actuellle sur la cathode:

Iris 1mm - 57µJ

      2mm - 96µJ

     3mm - 120µJ

Viktor.

  584   Tue Oct 11 11:09:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022Not FixedProblemLinac Commissionning Valeurs des BPM LI et TL_1 surestimees ? 

Ci-jointes des donnees BPM et YAG LI et TL_1, prise le 20/06 puis le 06/10, en fonction de valeurs des steerers 1 (pour LI) et 3 (pour TL)

--> Les valeurs mesurees au BPM ont l'air surestimees d'environ 30%.

  585   Tue Oct 11 11:57:19 2022 HG/CB InfoLI | TL | LE | Linac Commissionning run du 11/10/2022 

Iris de 2mm, prise d'image @12h --> dimension H 0.37mm et V 0.34mm

iris 1mm, prise d'image @12h14 --> dimension 0.28mm, 0.25mm

Iris 1.5mm, prise d'image @12h19 --> dimension 0.34mm, 0.3mm

Iris 1.3mm, prise d'image @ 12h22, 0.31mm, 0.29 mm, charge phase at 12h25, attenuation de 400 (Qmax290, Emax250pC)

Réalignement laser : position 5.856mm en x, et 3.41 en v

Compresseur à 60000 --> durée ?

Attenuation : 300--> 60 pC; 330 --> 140pC

focmax 247deg --> 197 deg, soleo at 198A

** REMARQUES **

    ---- Il semblerait que le BPM TL/DG/BPM.01 sature (cf. figure) les waveformes semblent écrétées. 

 

 

 

 

  586   Wed Oct 12 20:11:14 2022 KD, MJ, RCFixedShift summaryLI | Diag | MECA | Linac Commissionning Shift du 12/10/2022 (prise de données) 

Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz de la CFP par Ronic

Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.

Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK

Faisceau à 11h.

Marie à refait les mesures d'alignement Quad.

Prise de donnée pour alignement automatique du laser sur la PhotoCathode

Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)

==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.

==> Les données sont peut être à jeter.

Arrêt machine 17h15

*** OBSERVATIONS ***

Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :

- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge

- Insensible à la variation de phase à charge max

- Charge plus important (200pC au lieu de 150pC)

- Le faisceau est plus déformé  (cf. image en PJ)

  587   Thu Oct 13 00:49:19 2022 NDFixedShift summaryLI | Diag | MECA | Linac Commissionning RE: Shift du 12/10/2022 (prise de données) 

Sur l'image jointe le pixel maximum est à ~750 donc on est loin de la saturation...

KD, MJ, RC wrote:

Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz de la CFP par Ronic

Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.

Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK

Faisceau à 11h.

Marie à refait les mesures d'alignement Quad.

Prise de donnée pour alignement automatique du laser sur la PhotoCathode

Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)

==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.

==> Les données sont peut être à jeter.

Arrêt machine 17h15

*** OBSERVATIONS ***

Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :

- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge

- Insensible à la variation de phase à charge max

- Charge plus important (200pC au lieu de 150pC)

- Le faisceau est plus déformé  (cf. image en PJ)

 

  588   Thu Oct 13 10:26:06 2022 ND, VC, KD, VKUnder ProcessShift summaryDiag | Ring Commissioning Operations du 13/10/2022 

Les limites en courant ont été implémentées  dans les DS alimentation pour toutes la machine comformément au fichier "https://atrium.in2p3.fr/c40d9e45-476b-4e9a-9a0b-e05bb635888a"

 

9h15: Le frigo, le chiller et les elements pulses etaient encore allumes depuis hier soir.

Demarrage modulateur

Acces CFP. Clef acces laser oublies dans la casemate =>  acces complet.

Installation du MRSV (mise en hors service temporaire de EL/DG/SST).

11h Ronde fermeture casemate

11h05 Pb modulateur. Tentative appel support

Absence permis zone modulateur...

11:25 La ronde de la zone modulateur n'avait pas ete faite.

11:30 Trig

11h35 Pb Vide...

11:45 Pas de laser sur la camera laser photocathode mais photocourant en scan charge phase a 200-250.

Camera laser photocathode defaillante

Charge max 200pc (iris laser 2.3mm), phase 254.

Ajustement iris laser 1mm => Charge moyenne 100pC

Pas de recette de cette semaine?

Chargement recette: recipe_recipe_LI_TL_RI_20221007_20_09_40.txt

Extinction TL/PS/DP

Observation faisceau sur TL/DG/SST01: Pas de saturation; Pixel max a 600.AcqAttrManager ne demarre pas. CC contacte.

Observation ADC BPM TL/BPM.01: Pas de saturation

12h30 Pb demarrage septum

13h IHM EP added to Plateforme IHM

13h05 Pb septum resolu

13h25 Transport jusqu'a TL/SST3

Sur TL/SST2 le faisceau est a -2mm en X...

14h Acces pour reparation TL/SST.02 (ne fonctionnait pas sur routeur avec RI-C2/MRSV)

14h30 Iris mis a 1.3mm

14h40 Pb jive (cf image attachee)

15h Scan image saturee

16h Test AcqAttrManager: cela fonctionne mais des erreurs a analyser. L'acquisition tombe a 1Hz avec 2 BPM et deux ICTs.

17h Injection dans l'anneau. Recette sauvee: recipe_recipe_LI_TL_RI_20221013_16_51_32.txt

Valeurs de positions:

TL/DG/BPM.03_LIB.02: SpX=-1.95 SpY=-0.09

TL/DG/BPM.04_LIB.02: SpX=-1.36 SpY=1.00

Image TL/DG/SST.03 sauvee

17h15 Arret machine

git pull

===

Here is the program:

- Start modulator with automated script: Not done

- Access CFP until 10:00: OK

=> Disconnect TL/EL/SST.01 and connect MRSV: OK

- Test AcqAttrManager => Attente CC

- Emittance measurement on TL/SST.03 + Viktor

- Re-establish transport to the ring. Done

- Record TL/SST.03 + TL/BPM.03 and TL/BPM.04 for good ring injection.


- Adjust timing on TL/SST.02

  589   Thu Oct 13 17:41:13 2022 Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 13 17:41:00 2022 Shift summaryLinac Commissionning Alignement LINAC (canon-LIL-QUADs) 

Ci-joint le bilan, au jour d'aujourd'hui, des reconstructions Horizontales et Verticales des axes MAG Canon, LIL et QUADs a l'aide de diverses prises de donnees.

Marie

  590   Fri Oct 14 09:05:46 2022 ND, VK, IC, VM, ALUnder ProcessShift summaryRing | Ring Commissioning Shift du 14/10/2022 

8:50 Mise en chauffe modulateur, allumage frigo+chiller

Resisistivete eau: 6,6Mo

9:05 Client2 plant'e => redemarrage

9:45 HV On

Scan charge phase. Max charge=255

Phase E_max 207

Q~ 130pC

Fermeture Iris laser jusqu'a 1mm

Q~100pC

Phase section dispersion min: 103.

TL/BPM.02:

X=1.08

Y=0.7

RMS position: 0.2mm

10:26 Beam in the ring

Optimization of the injection and storage (see fig attached). At the end, injection with no losees!

Preparation for the orbit correction eluminating not working correctors. After several studies and iterations, we suceeded to correct the orbit (see the fig attached). Meanwhile, it seems that the BPM  ri-c2/dg/bpm.04-lib.05 (quite certain as it did not respond to the corrector change) and probably  ri-c1/dg/bpm.04-lib.03 do not give the proper readings. This point should be checked as soon as possible.

Problem with ChD of the ri-c2/dg/bpm.04-lib.05 (see the fig attached). We checked the connection in the rack5. We found that the BPM ri-c2/dg/bpm.04-lib.05 ChA was swaped with ChA BPM ri-c2/dg/bpm.06-lib.05 => Slava changed it. Now it is OK. BUT still ChD stays without signal. The problem is in the casemat probably. To be checked.

Starting the preparation for the first tune estimation. For this, we switched ON the sextupoles (see fig attached). Withour sextupoles, the FFT signal is too "noisy".

Optimization of the injection with the multiparameter optimizer RCDS, work in progress.

Alims IHM is updated by Slava to have separetly hor. and vert. correctors displayed.

18h30 End of the Shift.

 

 

 

 

 

 

 

  591   Fri Oct 14 12:59:34 2022 Entered by Marie Jacquet from 134.158.205.43 on Fri Oct 14 12:59:10 2022 InfoLinac Commissionning Schema position elements LINAC 

Demande par plusieurs personnes, je vous transmets ici mon schema de la position des elements dans le LINAC