HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 29 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icondown Text Attachments
  551   Fri Sep 16 10:10:36 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Sep 16 09:12:19 2022FixedUrgentLinac Commissionning RE: RE: Shutters Laser Shutter casemate ouvert

Shutter salle laser encore fermé

  
  552   Fri Sep 16 10:11:24 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Sep 16 09:12:19 2022FixedUrgentLinac Commissionning RE: RE: RE: Shutters Laser Problème shutter résolu




  
  553   Fri Sep 16 13:39:24 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Sep 16 13:39:08 2022FixedInfoLinac Commissionning Laser status Bonjour, j'ai changé 2 miroirs
du parcous optique (2 moroirs du periscope
dans la salle laser). La distribution est
  
  Draft   Fri Sep 16 16:13:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:13:31 2022 Shift summaryLinac Commissionning       
  555   Fri Sep 16 16:27:49 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Sep 16 16:27:35 2022FixedInfoLinac Commissionning Laser status Bonjour, voici l"énergie sur
la cathode (µJ) en fonction du diamètre
de l'iris (mm)
  
  556   Fri Sep 16 16:39:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:39:35 2022 Shift summaryLinac Commissionning shifts des 12 et 13 septembre - axes MAG vs BPM_TL et YAG_TL Données prises les 12 et
13 septembre

Très faible charge (<10
  
  557   Mon Sep 19 11:15:51 2022 Entered by Super Team from 134.158.195.141 on Mon Sep 19 11:15:38 2022Under ProcessLinacLI Démarrage technique Démarrage modulateur et chillers
(MO)

Problème avec les icepap
  
  558   Tue Sep 20 14:32:09 2022 SC VCUnder ProcessShift summaryLinac Commissionning Commissonning Linac 13H demarage modulateur

14H cyclage aimant (4 quads de
l'anneau ne cycle pas + EL PS DP (acces
  
  Draft   Wed Sep 21 09:28:54 2022 VCUnder ProcessShift summaryRing | Linac Commissionning Shift du jour Demarrage modulateur et refroidissement
9h30.

Pb alim quad anneau (Ri-C2-QP6)
 E_vs_phase.png 
  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? Aujourd'hui Iriya m'a montre en
salle de controle une "etendue"
de ~4mm de l'orbite du faisceau mesuree
  
  561   Thu Sep 22 00:00:43 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLI | Diag | Linac Commissionning RE: BPM LINAC + TL : dispersion tir a tir ? CALC/DG/MeanStd1 permet déjà
d'avoir la déviation standard
de la position mesurée sur 100 tirs
  
  562   Thu Sep 22 00:29:04 2022 ND, SC, AM, VK, IC, VIUnder ProcessShift summaryRing | Diag Mesures du 22/09 9h demarrage modulateur et schillers

Cyclage aimants

Asservissement laser ON
 7x 
  Draft   Thu Sep 22 10:08:30 2022 Entered by Hayg Guler from 134.158.91.29 on Thu Sep 22 10:08:17 2022Fixed   , entered from 134.158.91.29     
  564   Fri Sep 23 08:48:20 2022 Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 Shift summaryRing Shift du 23/09/2022 AM :


État a l'arrivé
:
 6x 
  565   Mon Sep 26 09:58:14 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Sep 26 09:57:59 2022FixedInfoLaser | Linac Commissionning Laser status Bonjour, le shutter-linac a été
replacé, on peut le sceller maintenant
(il faut fixer une date). L'énergie
  
  566   Mon Sep 26 16:30:56 2022 Vincent ChaumatUnder ProcessLinacLI | Linac Commissionning Mesure puissance Canon et section Mesure de la puissance dans la bouble (cristal
+ redpitaya)

mesure sur les 20 derniers points
 pBoucle.pngPisection.png 
  567   Tue Sep 27 08:40:33 2022 VC SC CBUnder ProcessShift summaryLI | Linac Commissionning Shift du jour Summary:

- Mesure du jitter et de la position
relative de pulse laser PC avec la RF canon
  
  569   Wed Sep 28 19:14:11 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 Shift summaryLinac Commissionning Shift du 12-13/09 en image  En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09).
 2022-09-28-elog.pdf 
  570   Thu Sep 29 07:59:51 2022 AM, IC, VK, VI, SC, ND Shift summaryLI | TL | Ring | Diag Shift du 29/09/2022 AM :

git pull sur $HOME_IHM


pression vanne vide : 5.7
 9x 
  571   Fri Sep 30 08:30:38 2022 AM, VI, VK, IC, VC, NDNew SolutionShift summaryRing Commissioning Shift du 30/09/2022 AM :

Hier soir : extinction des PC clients1
et clients 2
 16x 
ELOG V3.1.4-395e101