  568   Wed Sep 28 08:31:27 2022 VC VK AM IC & allUnder ProcessShift summaryRing Commissioning Shift du 28/09/2022 icon14.gif AM :

git pull sur $HOME_IHM


pression vanne vide : 8
 Screenshot_from_2022-09-28_19-05-00.pngScreenshot_from_2022-09-28_19-08-26.pngfirst_turn28092022.png 
  783   Mon Jul 24 16:29:07 2023 ND,LS, KD, JNC Shift summaryLI | TL Shift du 24/07/2023 10h: Accès casemate

Ajout de deux cables près
de TL/ICT.02, un jouant le role d'antenne
  
  564   Fri Sep 23 08:48:20 2022 Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 Shift summaryRing Shift du 23/09/2022 AM :


État a l'arrivé
:
 6x 
  598   Thu Oct 20 08:56:39 2022 SC, ND AnneauDiag Shift du 20/10/2022 8h56 Démarrage modulateur et refroidissement

9h20: git pull => mise a jour
des IHM SST et BPM (git pull qui n'avait
 8x 
  840   Fri Feb 2 08:16:50 2024 Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024Under ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Shift du 2 février 2024 La clé PA est resté enclenchée
hier. Il faut penser à la tourner
avant de partir (demande de Maher)
 Screenshot_2024-02-02_12-05-19.png 
  916   Tue Sep 17 09:08:45 2024 KD MJ HGUnder ProcessShift summaryLI | Linac Commissionning Shift du 17 septembre 2024 9h: mise en chauffe (sauf cyclage)

remise de SF6: 2.4bars --> 2.6bars

programme :
 9x 
  590   Fri Oct 14 09:05:46 2022 ND, VK, IC, VM, ALUnder ProcessShift summaryRing | Ring Commissioning Shift du 14/10/2022 8:50 Mise en chauffe modulateur, allumage
frigo+chiller

Resisistivete eau: 6,6Mo
 10x 
  586   Wed Oct 12 20:11:14 2022 KD, MJ, RCFixedShift summaryLI | Diag | MECA | Linac Commissionning Shift du 12/10/2022 (prise de données) Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz
de la CFP par Ronic
 2022-10-12_15_38_25_li_dg_sst_01-ccd_01_RAW_16bits.tiff 
  569   Wed Sep 28 19:14:11 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 Shift summaryLinac Commissionning Shift du 12-13/09 en image  En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09).
 2022-09-28-elog.pdf 
  Draft   Mon Oct 18 11:26:58 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 18 11:26:41 2021    Shift condionnement RF : passage à 5Hz     
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
 Screenshot-ICTLI.png 
  117   Wed Oct 13 17:54:58 2021 Entered by Hayg Guler from 134.158.195.141 on Wed Oct 13 17:54:31 2021Under ProcessShift summaryLinac Commissionning Shift Linac Laser-Canon  Shift Linac


Programme prévisionnel
:
 charge_phase.jpg 
  534   Tue Aug 30 08:56:43 2022 KDUnder ProcessShift summaryDiag | Aimants | Laser | RF D1 | SY | Linac Commissionning Shift Linac + TL + Injection 30/08/2022 8h57 : Démarrage modulateur, laser
(Gate False), chillers

Programme de la journée
  
  542   Fri Sep 9 12:36:23 2022 Entered by Super Team from 134.158.195.141 on Fri Sep 9 12:36:09 2022Under ProcessShift summaryDiag | Linac Commissionning Shift Linac + TL + Injection  Demarrage 12h30 :
- difficile, modulateur passe difficilement
en Trig
  
  540   Thu Sep 8 13:20:04 2022 Entered by Super Team from 134.158.195.141 on Thu Sep 8 13:19:52 2022Under ProcessShift summaryLinac Commissionning Shift Linac + TL + Injection Alignement laser :

position iris :
- X: 5.985 mm
 charge_phase__at_08-09-2022__12-36-04.jpg 
  546   Wed Sep 14 15:18:17 2022 CB/KD/HGUnder ProcessInfoLinac Commissionning Shift Linac + TL  Phase Qmax : 368°

Alignement / centre QP3( QP1 et
QP2 éteints) --> LI : STR1H : -1.62, 
 Emittance.jpgtransportfwhm.jpgquadscan_20h46.pngquadscan_k_20h39.png 
  538   Mon Sep 5 15:58:21 2022 Entered by Super Team from 134.158.195.141 on Mon Sep 5 15:58:08 2022Under ProcessInfoLinac Commissionning Shift Linac + TL 15h30 : intervention equipe Diag : redemarrage
wavecatcher et DS associés

16h claquage qui stoppe la machine
  
  531   Thu Aug 25 15:43:38 2022 VC/KD/HM/HGUnder ProcessLinacLinac Commissionning Shift Linac + LT 25 aout 2022 14h00 : injection dans la TL avec faisceau
sur TL-SST2

avec les parametres QP1=+1.6A,
  
  165   Tue Nov 16 11:44:06 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 11:43:53 2021Under ProcessInfoLinac Commissionning Shift Alignement tete de machine  Laser : 


Nouveaux
hublots pour le Laser photocathode 
Environ
50 µJ sur la photocathode
Stabilité
 charge_pahse.jpg 
  647   Thu Dec 8 10:05:38 2022 ND, IC, VK, VM, MEUnder ProcessShift summaryRing | Ring Commissioning Shift 8/12 9h: Mise en Chauffe modulateur + Frigo
+ Laser
Il n'y a plus de perte de pression
 14x 