766
|
Tue Jun 13 14:42:16 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023 | Fixed | Info | Linac Commissionning |
|
arręt de la machine | | Bonjour,
avant d'arrêter completement
de la machine il faut absolument fermer le |
|
|
765
|
Tue Jun 13 13:55:41 2023 |
SC, ND | New Solution | Info | LI |
|
RE: Effet changement de phase RF Canon sur TL/BPM.02 | | Le code lock_position_tl_bpm_02.py a ete
mis a jour pour prendre cet effet en compte.
|
|
|
764
|
Tue Jun 13 13:51:05 2023 |
SC, ND | New Solution | Info | LI |
|
Effet changement de phase RF Canon sur TL/BPM.02 | | Quelques changements de phase canon. On
voit que quand l'orbite derive vers des
valeurs negatives sur Tl/BPM.02/SpX le fait |
|
|
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | | Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit. |
    |
|
762
|
Wed Jun 7 16:02:33 2023 |
LS, MB, VC, ND | Reference Solution | Shift summary | Ring |
|
Programme prise de donnees 8/06 | | 9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification |
   |
|
761
|
Wed May 31 21:36:49 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
RE: Studies on the Ring revolution frequency | | Bonjour,
Pouvez vous enregistrer les images
de l'oscilloscope et le donnée |
|
|
760
|
Wed May 31 14:46:21 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
Studies on the Ring revolution frequency | | Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles. |
8x |
|
759
|
Tue May 30 09:44:07 2023 |
MJ, KD | Under Process | Shift summary | RF Anneau | Ring Commissioning |
|
RE: RF et anneau | |
Mercredi 24 j'ai fait un test
sur la cavité RF : |
|
|
758
|
Fri May 26 13:56:17 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Studies on the beam revolution frequency | | The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer. |
12x |
|
757
|
Thu May 25 15:08:18 2023 |
NC,IC, VM,lS | | Shift summary | Ring |
|
| | 9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase |
  |
|
756
|
Tue May 23 11:36:24 2023 |
LS, ND | | Shift summary | LI | Diag |
|
Prise de donnees 23/05 | | 9:30 Demarrage machine
Fin installation Cerenkov + tests
MRSV |
|
|
755
|
Fri May 19 20:22:42 2023 |
MJ, KD | Under Process | Shift summary | RF Anneau | Ring Commissioning |
|
RF et anneau | | Apres 18h30 : prise ne main de la machine
pour aller dans la LE ==> le kicker d'extraction
est interlocké (abdandon) |
 |
|
754
|
Fri May 19 18:05:29 2023 |
VK, IC | | Shift summary | Ring Commissioning |
|
RF frequency of the Ring | | In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the |
   |
|
753
|
Wed May 17 09:16:47 2023 |
VK, IC. AL | | Shift summary | Ring Commissioning |
|
Understanding of the shift in RF frequency | | 8:40 Start warming up, problem with PSS.
It was restarted.
Problems to start and tune the |
18x |
|
752
|
Tue May 16 10:28:43 2023 |
LS, ND, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 16/5 | | 9:33 Start warming up
9:45 Ducre is working on the plumbing
but it shuld not affect operations |
   |
|
751
|
Mon May 15 11:31:43 2023 |
ND, LS, IC, VK, VM, SW | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 15/5 | | 10:00 Machine warm up
Magnets cycling
11:00 Start machine |
7x |
|
750
|
Fri May 5 08:47:28 2023 |
KD VM VK JN SL | Under Process | Shift summary | Ring Commissioning |
|
shift du 5 mai 2023 | | 8h30 : accès casemate controlé
==> septum et kickers OFF et
cavité RF OFF |
    |
|
749
|
Thu May 4 16:14:06 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 | | Shift summary | Linac Commissionning |
|
RE: Stabilite LINAC | |
|
|
|
748
|
Thu May 4 11:41:53 2023 |
VK, VM, IC, LS | | Shift summary | Ring Commissioning |
|
Restart storage in the Ring | | ~9h Start of the modulator
10h Tuning of the injector with
KD |
|
|
747
|
Thu May 4 10:09:43 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023 | Fixed | Info | Linac Commissionning |
|
Laser status | | Bonjour l'énergie UV actuelle
sur la cathode = 58µJ avec l'iris
1.3mm |
|