Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png

Coordinator: ND

9h12: Modulator start

PSS: Default centrale SSI

10h30 Beam

Load recipe: LI_TL_straight_test_20231027_11_21_15

12:15 Lunch break

Strange message left on one of the computer screens.

14:15: The shutter was moved over lunch time without it being logged.

14h20 Access to check MRSV

14h40 Restart beam

Some signal observed beam on and not beam off. But strongly misaligned.

Several access, trying to align the MRSV. No luck. More time to be spent on it.

17h30 Stop beam

 

Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024; Shift du 2 février 2024 Screenshot_2024-02-02_12-05-19.png

La clé PA est resté enclenchée hier. Il faut penser à la tourner avant de partir (demande de Maher)

8h15 : Mise en chauffe machine (aimants, chillers, laser, modulateur).

Pas de mesure de charge (WAC, délai ?)

 

Recherche de la cause de la perte de puissance

** Klystron 1090 ==> 2MW en Pi Load

Initial : TL/BPM.02 à 0 (Dipôle 160.8A) ==> 1.27dB

On test les sources de pertes de puissance :

* Changement frequence RF (-500Hz)

pas de changement

* Changement temperature section ( consigne 29.5°C ==> 29.2°C)

TL/BPM.02 à 0 ==> 1.39dB

On continue pour trouver l'optimum

optimum trouvé autour de 27.0°C en consigne.

TL/BPM.02 à 0 ==> 1.73dB

 

** Essaie de rentrer dans l'anneau. Impossible de faire un tour. Reprise du septum, on gagne 2 BPM mais les deux dernier ne voit pas de faisceau.

==> problème de délai des EP ?

Hier modification du retard du laser PC pour vérifier que l'on était bien dans l'impulsion RF au niveau de la section LIL. Passage du retard de -8.2µ à -8.4µs (pas de changement sur l'energie faisceau)

 

remise du retard à -8.2µs

parametre pour mardi

recette good for Xray and EL opérationel  (atténuateur section 1.385dB   29.2°C)

Arret machine

 

 

Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024; Complement de la fin du elog 837 

En complement de la fin de l'entree elog 837 ou il est ecrit a la fin :

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes

j'ajoute qu'on a aussi fait le stest suivant :

a la phase LIL =133 (10MW PiS power-meter casemate, courant dipole ~148 A au lieu des 159.3 nominal), le faisceau est bien visible sur YAGTL2,  au minumum de dipersion et a x ~ 0 sur BPMTL2

on passe a +5 (138) en phase : faisceau disperse qui va vers la gauche de l'ecran et valeurs negatives BPM.

on passe a -5 (128) en phase : idem (= disperse qui va vers la gauche de l'ecran et valeurs negatives BPM).

--> Ca semble montrer qu'on est bien sur la crete de l'impusion, que la perte des 5 MeV d'energie depuis le redemarrage sem derniere n'est pas due au fait qu'on serait par erreur sur un front montant ou descendant de l'impulsion ...

Entry   MJ; Attenuateur LIL / Puissance LIL / Energie electrons 

La puissance entree canon a ete verifie et conforme a l'atterndu (6 MW = 18/3 MW)

Avec l'attenuateur a 2 db, le power meter dans la casemate affiche 9 mW entree LIL.

--> Le faisceau est detecte sur BPMTL2 et sur YAGTL2 pour I_DIPOLE = 143 A ce qui, avec les caracteristique du dipole, correspond a une energie sortie section de 45.5 MeV

Entry   VK VC HG SC ME; commitionning 

8h10 rémarrage machine chauffage klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y  (tous les DS redpy baie 17 )

Cycling ok

ready to start at 9h15
 

Sophie; Hayg peresent. Other people for ring formation  are  missing  without 

 

Mohamed installed powermeter in the casemate.

Sophie prepare linac.

PROBLEM: Observation: too many missed triggers from modumator. Call Vincent.Incertitude synchro: IMPORTANT solution by Vincent (more details ask Vincent):

Problem solution: change RF frequency 250000-250001 ; confirm on synchoro scope frequency sweep; change back 250000-250001; Problem solved, confirmed on scope http://192.168.229.21

Resolution d'instabilité de déclenche du modulateur:

si le signal observé sur  ICT 1 (Gun) n'apparait pas à 10Hz  (ie nBs de coups manqués sup à 1:100) => pB de synchro

pour le résoudre il faut changer la phase entre le 500MHz ri et le 33MHz ri. 

solutions:

1- changer la fréquence 500MHz ri  , +1Hz et -1Hz    (aller retour)

2- changer la fréquence du 33MHz ri  +1Hz et -1Hz    (aller retour)

3- changer la phase du 33MHz ri (0.1°)

Attention la phase injection anneau et la phase FP/ electrons peut changer

test à faire pour expliquer la perte d'énergie du faisceau.

 

 

 

10.43 PROBLEM no explanation of : beam energy  wrt to attenuator and section power

section 9.8 MW att 2 dB

canon 6.35 MW

Beam at TL2 for att 2dB for dipole 147.3 . Section Power 10.4MW

12.30-13.30h Lunch pause

14h restart , try to understand power vs electrons energy mismatch.

We can not proceed to ring injection at wrong electron  beam energy. Attenuator should be reduced to 1.3 , which  is not allowed by Mohamed, since section power should not exceed 11 MW. 

Check de la postion temporelle du faisceau d'électron dans la RF de la section: la position actuelle est bonne une avance de 200ns (passage de -8.2µs à -8.4µs ) de l'impulsion laser PC dans l'impulsion RF ne change pas l'energie du faisceau 

(test sur la varation de position sur SST0.2)

 

test Puissance dasn la secteur LIL

Pin section wattmetre sur coupleur d'entrée 10.5MW

Pout charge mesure demain...

 

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes

 

 

 

16:00; Stop shift machine et arret machine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entry   RC VC MJ ; commitionning 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png

Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par step

14:  formation CFP + machine (anneau et extraction line)

==> alignement point cathode sur courant d'obscurité + alignement dans Quad (cf. screenshot)

==> affinage extraction line (cf. Screenshot)

Recette sauvegardée dans "good_20240131_16_01_08"

La recette précédente à permis d'injecter directement dans l'anneau (aucune modification autre que phase + atténuateur) (pas de changement de phase cavité RF)

X: trouvé directement (phase 500MHz ajusté à 7.3V)

17h30 : arrât machine

Entry   ND, Anna K, Elene K; Data taking 26/01 7x

9:30 Warm-up

11:00 Modulator OFF => restart warm-up

Pb temperature section.

12h15: Pb temperature canon.

12h30 Lunch break

13h30 Pb temperature fixed by Kevin.

Restart

Beam jittery.

Phase shifter was at 4530.

Recipe: LI_TL_RI_all_20240125_16_29_34

Beam seen on EL/DG/SST.01 but strongly spread horizontally. Attempts to focus it but with limited success.

Faraday cup study: Noise from the kickers is very strong difficult to see any other signal.

See images attached: 2 kickers: Screenshot_from_2024-01-26_17-06-36.png

ext kicker only: Screenshot_from_2024-01-26_17-09-19.png

inj kicker only: Screenshot_from_2024-01-26_17-07-16.png

No kicker: Screenshot_from_2024-01-26_17-08-36.png

17h40 Stop

Entry   VC DN ND, IC, VM, KD, AS RC , VK...; commitionning 27x

8h45 demarrage chauffage Modulateur et frigo

Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible  (pc laser demarré par Kevin)

8h50 demarrage chiller et cycling magnet   => OK

9h13 demarrage ampli laser PC

9h30 Git pull

10h20 Demarrage faisceau

10h27 Recette chargee: all_20240124_18_17_03

10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge

Phase RF section 126

10h53 Etude de l'influence de la phase laser sur la phase RF.

10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0

10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000

11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000

11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000

11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000

11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000

11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000

Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...

11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.

11h32 phase anneau initiale 2320, new phase: 4500

Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved.  The new receipt is

recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt

For this receipt the x- beam position @TL BPM2 should be 0 mm.

During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.

The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)

Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%

The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)

 

Plein de choses a ecrire... Acces PERLE, des rayons X,...

Une dizaine de personnes en SdC.

 

15h30 scan en temps du kicker d 'extraction.

Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.

Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).

Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.

Suggestion de retard pour le kicker d 'extraction: -8.310us

Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.

Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)

** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé

** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.

** image prise du centre du faisceau

** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)

** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)

Paramètre synchro CFP/Anneau :

* delai trig/cfp (19.4ns),

* dephaseur 500MHz (7.2V),

* setpoint cavité CFP (0V) sur pente négative,

* phase rigol (0° voie1, 204° voie2).

Entry   VC, IC, VK, VM; Commissioning 10x

Demmarrage machine à 8h45

IHM ThomX warm-up

8H55 Chauffage klystron, Frigo  Ampli laser

9H   Chiller  

PB    er/hf/rac.17-api.di1   et TL/PS/DPI.01

Demarrage cyclage aimants

Start of the RF cavity 500.25 MHz and 50 kV

Start of the accelerator (mode THOMX on MPS)

Loading the receipt good_20240117_17_22_41

Charge-phase scan, tuning of the RF section phase (Gun phase = 273, LIL phase = 114, Att = 1.35)

Transport to the Ring but only 1 turtn. Optimization of the injection but no big imrovement

Loading the receipt from 16/11/223

Optimization of the transport

At 11h50 the modulator interlocked . Then on the MPS there are errorrs (see photo). Need the intervention of support.

13.50 Eric came and fixed the probmlem of one of vacuum valves of the ring, that was causing interlock.

Synchro problem, Kevin repaired.

14.40. Kevin , Ronic entered the bunker to change cable on FPC.

15.10 Restart the machine. Tune of the injector (gun phase 230 and LIL phase 111, charge 72 pC ICT1). it seems that now the energy is not very stable, at TL BPM2 the SpX goes from +2 to -6 (see the screenshot attached). Injection in the ring.

Restart of the RF cavity (problem to start from the interface in the control room)

Only one turn in the ring

During the phase scan of the RF cavity (with rigol) strange bahavior of the trigger. Misstriggering (see the screenshot attached). Problem to be understood. Conclusion: to change the phase of the RF cavity better to use the phase shifter (old position 6094 and nez position 2320).

Storage is reisteblished and improved after optization of the injection : the last good receip is

recipe_recipe_LI_TL_RI_all_20240124_18_17_03.txt

The injection stability to be further investigated (see the screenshot attached)

Use of the trigger on demand. Works well. Checked the duration of beam circulating in the ring (5-10 sec on the scope).

Some tests to check the correlqtino of the energy jumps on TL BPM2 with RF cavity and pulsed elements and dipoles. It seems that there are no effect.

 

 

Entry   JNC/CB; run du 23/01/2024 en cours 

Iris ajusté à 1.1, image enregistrée à 17h20 dans le répertoire laserPb autorisation de tir, vanne fermée, réouverte

Chargemax à 330 degrés, on se place à 280 degrés. 

Focalisation max sur LISST à 227A, energie steerer 4.93MeV, l'énergie est un peu basse

on se met à 235A sur le soleno et on ajuste la phase pour avoir un inimum --> phase 270 degrés--> energy steerer 4.95 MeV

le faisceau est tranmis à 180A sans steerer ni sur li ni sur TL

phase section 110deg, att +1.2dB energy steerer....

.....................125deg ......+1.8..............................

on charge la recette pour l'orbite, on met le soleno à 180A

on vérifie les phases pour l'espread minimale : impossible de lancer l'IHM SST, 10 plantages de suite

270 phase canon, 120 phase section, att +1.35dB, dipole 159.3A

quad scan QP3, QP1= -1.9A, QP2 = +2.35 @180A

quad scan QP3, QP1= -1.8A, QP2 = +2 @195A

On passe du temps à aligner sur QP3 (TL/STr1V=-6A, 1H =-6A) --> quad scan 3 195A

quand scan à 185A (QP1=1.5A, QP2=-1.7A), on retrouve des scan plus cohérent

Arret 20h30

 

 

 

 

 

 

Entry   VK,VM,IC,ND; Operations 18/1 10x

9:05 Git pull

9h14: Demarrage modulateur

10h22 Client 3 does not respond; Reboot the machine

10h42 PSS Gele ...

10h46 PSS reparti

10h47 Tension modulateur 1090V  (a-t-on une nouvelle consigne?)

Scan des EP

14h18 Modulateur pb at the end of the scan. Resolu 14h30.

14h22 Intervention Philippe: Redemarrage RDP5B17. termine 14h26

 

15h Comparaison rafraichissement ER/SY/RAC.17-ELR.01-RDP.03 et ER/SY/RAC.17-ELR.01-RDP.04

 Dans jive/Device chosir le device et aller dans "event" "waveform_cha &chb" puis mettre "relative" a 0.001 pour que cela rafraichisse tres vite. (mais 1 semble aussi fonctionner) il ne faut pas mettre None

15h30 Pas de faisecau dans la EL... Ajustement du kicker d'extraction

16h18 Test du bouton "Tir unique" dans Synchro/ Phase + Freq

17h06 Comparaison TL/DG/BPM.04 et EL/DG/BPM.01

Attention il faut s' assurer que le gain des BPMs est le meme.

17h40 arret faisceau

===

Bilan de la journée:

* Tâche #12: Verification charge extraite: Fait

* Tâche #56: Scan réglage EP: Fait

* Tâche #5 Nouvel IHM SST: Testé, déployement au prochain git pull (en cours)

* Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM: Pertinence à  discuter

* Re-re-re-validation du mode tir unique

* Test et validation de l'acquisition des RDP B17

===

Tâches de la liste de priorité (par ordre de priorité):

Tâche #12: Verification charge extraite

Tâche #56: Scan réglage EP

Tâche #5 Nouvel IHM SST

Tâche #8: démarrer MRSV

Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM

Test diags LE

 

Entry   VC-KD; commitionning 10x

8H50

Demarrage chauffage, chiller, et cyclage aimants

TL/PS/DPI.01 en défaut resolu par un reset sur l'ATK pannel

 

les redpitaya étaient parametrées en defaut (comme s'il y avait eu une coupure de courant entre hier et aujourd'hui)

les waveform de la er\sy\rac.17-elr.01\RDP.03 (redpitaya 3 baie 17) sont toujours acquisent plus lentement que les autres (alors que le event ID compte comme les autres RDP vérifiers sur 1000 events ID dans ATK pannel)

alingnement laser sur PC avec courant d'oscurité

alignement du triplet linac

TL\DG\SST.02 en disfonctionne (caméra ok mais pas de faisceau sur le YAG on voit bien la mire)

alignement des quad sur la TL

Arret et redemarage des serveurs TL\DG\SST.02\CCD.01 dans ASTOR

le reglage du dipole et phase et att section

dipole 159.3

phase lil 107

Att lil 1.31dB

position centre faisceau sur TL\BPM2 X 4mm Y 0mm

redemarrage modulateur 13h30     1090V

charge faiceau

LI/DG/ICT.01 103pC

TL/DG/ICT.01 108pC

TL/DG/ICT.02 110pC

 

EP alumés manuellement  (reset en local )

Ri-c1/dg/BMP.05-LIB04 pas de signal (TbT ne fonctionne pas) serveur redemarré OK

quelques tour dans l'anneau (sans cavité RF)

on bouge delay kicker d'extraction de -7.97µs à -7.10µs

V kicker 6600 V => faisceau au milieu du BPM LE

sur IHM retards synchro : il faut pouvoir piloter les retards avec une précision d'une ns au moins pour les kickers

PB led allumées sur DG\EL\SST.01 

pB résolu par Nicolas et Kevin les leds EL sst.0.1 est sur le powerswitch

fisceau sur l'ecran yag ... non optimisé

RECETTE pour aller dans la LE en passant par l'anneau sauvé sous : good_20240117_17_22_41 avec Kicker d'extraction à 6150V (à ajouter dans la recette)

voir image. Il reste à optimiser le faisceau (ligne horizontal actuellement).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entry   MJ et SC;  2024-01-16_10-49-54_yag_bpm_LI.png2024-01-16_13-25-52_charges.png2024-01-16_13-28-26_bpmTL2.png2024-01-16_14-37-22-TLbpm.png

9h Mise en chauffe modulateur et refroidissements

Démarrage ampli laser

9h07 fermeture casemate

faisceau sur yag

bpmLI1 sature (screenshot) + mesure charge marche pas - Intervention nicolas et vincent :

Mesure de charge ictLI remarche decalage du linac trigger laser gun de -8 us à -8.20 us en retard

bpmLI1 redevenu OK

charge 100 pC (attenuateur laser 310)

-50 pour phase pour energie max - soleno 210 -  phase canon 316 

steerer LI ne s'allument pas (appel Jean noel ) - probleme regle par JN

mesure energie : 5.2 MeV

passage section --> faisceau sur yagtl1 

mesure energie section  :

53 MeV    pour 1.75 db phase 110 

50.7 MeV  pour 2 db phase 110

ictTL01 MARCHE PAS (screenshot) --> demande a Nicolas

Dipole on : 159.3 

faisceau sur bpmTL2 (screenshot) - RIEN sur YAGTL2 impossible de visualiser ni faisceau ni courant obscurite --> appel Nicolas

Plus aucune camera ne peut etre mises sur ON - Comme il n' y a personne pour m'aider j'essaye "restart all camera server " - YagTL1 refonctionne apres ca -

mais YAGTL2 ne marche toujours pas, ni ictTL01 (ni sans doute ictTL2 ni yagtl03) - signaux RF ne sont plus visibles sur RF_plot (alors qu'il y a du faisceau)

donc : FIN de shift

Bon finalement on essaye de continuer quand meme ...

On a reussi a avoir du signal sur BPMTL4 en mettant l'attenuateur section a 1.6. Au dessus pas de signal dans BPMTL4 (voir screenshot)

Remesure d'energie a 1.6 attenuateur section : 52.5 MeV (Au debut de shift on avait 50.7 MeV pour 2 db)

Incomprehensible :  pourquoi le faisceau passe dans la TL a 1.6 db et PAS a 2 db

Bilan : pas de faisceau sur TL/DG/SST.02 apres dipole

 

 

Entry   Entered by Viktor Soskov from 134.158.195.153 on Mon Jan 15 10:41:24 2024; Laser status 

Bonjour,

l'état actuel du laser: on a passé le width du Pockels de 1330 à 1550 ns.

On a Eir=1.4mJ; Euv=56µJ sur la cathode, la position de atténuateur - 420.

Viktor

Entry   ND; Redémarrage diags + synchro health_check_Diag_2024_01_11_14_54.pnghealth_check_2024_01_11_14_55.png

Pour la synchro, les generateurs de retard ont ete redemarres.

Pour les diags: redemarrage de icePapControllerB6 et Wavecatchers.

Signal OK (sans faisceau) sur BPM, ICT et sur ecrans.

 

Entry   Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023; Changement fréquence linac 

Suite à une demande de Jean-Noël, la fréquence linac a été changé.

Nous sommes maintenant à la fréquence nominale + 500Hz: 2998.550500MHz.

La fréquence anneau est inchangée.

 

Entry   Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023; Changement de frequence linac Screenshot_from_2023-12-12_12-57-04.png

Suite discussion avec Jean-Boel et Vincent, la frequence linac a ete remise a 2998550000Hz (nominal).

La frequence anneau est inchangee a 500.250000 MHz

Les frequences peuvent etre verifiee dans PlateformIHM / Synchro / Synthetiser status

 

Entry   VC,ND; Tests synchro 

8H15 démarrage chiller et modulateur

Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76

Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.

On voit régulièrement des arrêts de 8 secondes (ou 16 secondes) dans les données envoyées par la RDP.

16h36: Arrêt

Entry   VC, ND; Tests synchro 

Objectif: Test nouveau code CPLD

14:44 Mise en chauffe modulateur

Le code semble fonctionner => tests avec modulateur

15:44 Trig

De nombreux coups manqués. Il va falloir augmenter la largeur des portes echantillonant le 33MHz et le 41MHz. Le nombre de coups manqué est le même à 500,250MHz et à 500.002MHz.

16:50 arrêt

Entry   SC/KD; Faisceau LE 

8h50 Mise en chauffe modulateur

Mise en route chillers et frigo

Problème laser photocathode : en cours d'investigation par Kevin et Viktor

10h Résolution problème laser nécessaire, arret modulateur, chillers et frigo

 