Shift du 2 février 2024 | |
La clé PA est resté enclenchée hier. Il faut penser à la tourner avant de partir (demande de Maher)
8h15 : Mise en chauffe machine (aimants, chillers, laser, modulateur).
Pas de mesure de charge (WAC, délai ?)
Recherche de la cause de la perte de puissance
** Klystron 1090 ==> 2MW en Pi Load
Initial : TL/BPM.02 à 0 (Dipôle 160.8A) ==> 1.27dB
On test les sources de pertes de puissance :
* Changement frequence RF (-500Hz)
pas de changement
* Changement temperature section ( consigne 29.5°C ==> 29.2°C)
TL/BPM.02 à 0 ==> 1.39dB
On continue pour trouver l'optimum
optimum trouvé autour de 27.0°C en consigne.
TL/BPM.02 à 0 ==> 1.73dB
** Essaie de rentrer dans l'anneau. Impossible de faire un tour. Reprise du septum, on gagne 2 BPM mais les deux dernier ne voit pas de faisceau.
==> problème de délai des EP ?
Hier modification du retard du laser PC pour vérifier que l'on était bien dans l'impulsion RF au niveau de la section LIL. Passage du retard de -8.2µ à -8.4µs (pas de changement sur l'energie faisceau)
remise du retard à -8.2µs
parametre pour mardi
recette good for Xray and EL opérationel (atténuateur section 1.385dB 29.2°C)
Arret machine
|
| Attachment 1: Screenshot_2024-02-02_12-05-19.png
|
 |
|
839
|
Thu Feb 1 16:30:20 2024 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024 | Under Process | Shift summary | LI | TL | LE | Ring |
|
Complement de la fin du elog 837 | |
En complement de la fin de l'entree elog 837 ou il est ecrit a la fin :
on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2 sans succes
j'ajoute qu'on a aussi fait le stest suivant :
a la phase LIL =133 (10MW PiS power-meter casemate, courant dipole ~148 A au lieu des 159.3 nominal), le faisceau est bien visible sur YAGTL2, au minumum de dipersion et a x ~ 0 sur BPMTL2
on passe a +5 (138) en phase : faisceau disperse qui va vers la gauche de l'ecran et valeurs negatives BPM.
on passe a -5 (128) en phase : idem (= disperse qui va vers la gauche de l'ecran et valeurs negatives BPM).
--> Ca semble montrer qu'on est bien sur la crete de l'impusion, que la perte des 5 MeV d'energie depuis le redemarrage sem derniere n'est pas due au fait qu'on serait par erreur sur un front montant ou descendant de l'impulsion ... |
|
838
|
Thu Feb 1 11:50:28 2024 |
MJ | Not Fixed | Shift summary | LI | TL | LE | Ring | Linac Commissionning |
|
Attenuateur LIL / Puissance LIL / Energie electrons | |
La puissance entree canon a ete verifie et conforme a l'atterndu (6 MW = 18/3 MW)
Avec l'attenuateur a 2 db, le power meter dans la casemate affiche 9 mW entree LIL.
--> Le faisceau est detecte sur BPMTL2 et sur YAGTL2 pour I_DIPOLE = 143 A ce qui, avec les caracteristique du dipole, correspond a une energie sortie section de 45.5 MeV |
|
837
|
Thu Feb 1 08:10:14 2024 |
VK VC HG SC ME | Under Process | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
commitionning | |
8h10 rémarrage machine chauffage klystron frigo et chiller
pB DS calc/er_sy/rac.17-elr.01-rdp.0X.Y (tous les DS redpy baie 17 )
Cycling ok
ready to start at 9h15
Sophie; Hayg peresent. Other people for ring formation are missing without
Mohamed installed powermeter in the casemate.
Sophie prepare linac.
PROBLEM: Observation: too many missed triggers from modumator. Call Vincent.Incertitude synchro: IMPORTANT solution by Vincent (more details ask Vincent):
Problem solution: change RF frequency 250000-250001 ; confirm on synchoro scope frequency sweep; change back 250000-250001; Problem solved, confirmed on scope http://192.168.229.21
Resolution d'instabilité de déclenche du modulateur:
si le signal observé sur ICT 1 (Gun) n'apparait pas à 10Hz (ie nBs de coups manqués sup à 1:100) => pB de synchro
pour le résoudre il faut changer la phase entre le 500MHz ri et le 33MHz ri.
solutions:
1- changer la fréquence 500MHz ri , +1Hz et -1Hz (aller retour)
2- changer la fréquence du 33MHz ri +1Hz et -1Hz (aller retour)
3- changer la phase du 33MHz ri (0.1°)
Attention la phase injection anneau et la phase FP/ electrons peut changer
test à faire pour expliquer la perte d'énergie du faisceau.
10.43 PROBLEM no explanation of : beam energy wrt to attenuator and section power
section 9.8 MW att 2 dB
canon 6.35 MW
Beam at TL2 for att 2dB for dipole 147.3 . Section Power 10.4MW
12.30-13.30h Lunch pause
14h restart , try to understand power vs electrons energy mismatch.
We can not proceed to ring injection at wrong electron beam energy. Attenuator should be reduced to 1.3 , which is not allowed by Mohamed, since section power should not exceed 11 MW.
Check de la postion temporelle du faisceau d'électron dans la RF de la section: la position actuelle est bonne une avance de 200ns (passage de -8.2µs à -8.4µs ) de l'impulsion laser PC dans l'impulsion RF ne change pas l'energie du faisceau
(test sur la varation de position sur SST0.2)
test Puissance dasn la secteur LIL
Pin section wattmetre sur coupleur d'entrée 10.5MW
Pout charge mesure demain...
on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2 sans succes
16:00; Stop shift machine et arret machine
|
|
836
|
Wed Jan 31 14:12:25 2024 |
RC VC MJ | Under Process | Other | Ring Commissioning |
|
commitionning | |
Chauffage mod 11h
demarrage machine 14H
on suit le star faisceau step par step
14: formation CFP + machine (anneau et extraction line)
==> alignement point cathode sur courant d'obscurité + alignement dans Quad (cf. screenshot)
==> affinage extraction line (cf. Screenshot)
Recette sauvegardée dans "good_20240131_16_01_08"
La recette précédente à permis d'injecter directement dans l'anneau (aucune modification autre que phase + atténuateur) (pas de changement de phase cavité RF)
X: trouvé directement (phase 500MHz ajusté à 7.3V)
17h30 : arrât machine |
| Attachment 1: 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 2: 2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
|
 |
|
835
|
Fri Jan 26 09:36:01 2024 |
ND, Anna K, Elene K | | Shift summary | LI | TL | LE |
|
Data taking 26/01 | |
9:30 Warm-up
11:00 Modulator OFF => restart warm-up
Pb temperature section.
12h15: Pb temperature canon.
12h30 Lunch break
13h30 Pb temperature fixed by Kevin.
Restart
Beam jittery.
Phase shifter was at 4530.
Recipe: LI_TL_RI_all_20240125_16_29_34
Beam seen on EL/DG/SST.01 but strongly spread horizontally. Attempts to focus it but with limited success.
Faraday cup study: Noise from the kickers is very strong difficult to see any other signal.
See images attached: 2 kickers: Screenshot_from_2024-01-26_17-06-36.png
ext kicker only: Screenshot_from_2024-01-26_17-09-19.png
inj kicker only: Screenshot_from_2024-01-26_17-07-16.png
No kicker: Screenshot_from_2024-01-26_17-08-36.png
17h40 Stop |
| Attachment 1: health_check_2024_01_26_09_45.png
|
 |
| Attachment 2: scan_Laser_vs_RF_phase_2024_01_26_13_53.png
|
 |
| Attachment 3: Screenshot_from_2024-01-26_17-06-36.png
|
 |
| Attachment 4: Screenshot_from_2024-01-26_17-07-16.png
|
 |
| Attachment 5: Screenshot_from_2024-01-26_17-09-19.png
|
 |
| Attachment 6: Screenshot_from_2024-01-26_17-08-36.png
|
 |
| Attachment 7: 2024-01-26_17_26_05_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
|
 |
|
834
|
Thu Jan 25 08:49:29 2024 |
VC DN ND, IC, VM, KD, AS RC , VK... | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
commitionning | |
8h45 demarrage chauffage Modulateur et frigo
Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible (pc laser demarré par Kevin)
8h50 demarrage chiller et cycling magnet => OK
9h13 demarrage ampli laser PC
9h30 Git pull
10h20 Demarrage faisceau
10h27 Recette chargee: all_20240124_18_17_03
10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge
Phase RF section 126
10h53 Etude de l'influence de la phase laser sur la phase RF.
10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0
10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000
11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000
11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000
11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000
11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000
11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000
Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...
11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.
11h32 phase anneau initiale 2320, new phase: 4500
Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved. The new receipt is
recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt
For this receipt the x- beam position @TL BPM2 should be 0 mm.
During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.
The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)
Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%
The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)
Plein de choses a ecrire... Acces PERLE, des rayons X,...
Une dizaine de personnes en SdC.
15h30 scan en temps du kicker d 'extraction.
Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.
Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).
Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.
Suggestion de retard pour le kicker d 'extraction: -8.310us
Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.
Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)
** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé
** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.
** image prise du centre du faisceau
** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)
** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)
Paramètre synchro CFP/Anneau :
* delai trig/cfp (19.4ns),
* dephaseur 500MHz (7.2V),
* setpoint cavité CFP (0V) sur pente négative,
* phase rigol (0° voie1, 204° voie2).
|
| Attachment 1: health_check_2024_01_25_10_20.png
|
 |
| Attachment 2: scan_Laser_vs_RF_phase_2024_01_25_10_24.png
|
 |
| Attachment 3: scan_Laser_vs_RF_phase_2024_01_25_10_55.png
|
 |
| Attachment 4: scan_Laser_vs_RF_phase_2024_01_25_10_58.png
|
 |
| Attachment 5: scan_Laser_vs_RF_phase_2024_01_25_11_00.png
|
 |
| Attachment 6: scan_Laser_vs_RF_phase_2024_01_25_11_02.png
|
 |
| Attachment 7: scan_Laser_vs_RF_phase_2024_01_25_11_04.png
|
 |
| Attachment 8: scan_Laser_vs_RF_phase_2024_01_25_11_07.png
|
 |
| Attachment 9: scan_Laser_vs_RF_phase_2024_01_25_11_12.png
|
 |
| Attachment 10: Screenshot_from_2024-01-25_11-18-55.png
|
 |
| Attachment 11: bpm_0_vs_ext_kicker_second_15h59.png
|
 |
| Attachment 12: Screenshot_from_2024-01-25_15-53-54.png
|
 |
| Attachment 13: Screenshot_from_2024-01-25_15-58-31.png
|
 |
| Attachment 14: bpm_0_vs_ext_kicker_second_16h22.png
|
 |
| Attachment 15: Screenshot_from_2024-01-25_17-14-11.png
|
 |
| Attachment 16: Screenshot_from_2024-01-25_17-13-45.png
|
 |
| Attachment 17: Screenshot_from_2024-01-25_17-12-36.png
|
 |
| Attachment 18: Screenshot_from_2024-01-25_13-05-25.png
|
 |
| Attachment 19: S_HisPhase.png
|
 |
| Attachment 20: S_Phase25012025.png
|
 |
| Attachment 21: S_Ampl25012025.png
|
 |
| Attachment 22: figSRorbit_25012024.png
|
 |
| Attachment 23: TbtX_BPM2_999turn_20_turn_24Jan25Jan_comparizon.pdf
|
| Attachment 24: untitled.png
|
 |
| Attachment 25: mesures_X_stable_table_presque_opt2.dat
|
# DATASET= "xli/op/tmd.01/i1[0]"
# SNAPSHOT_TIME= 2024-01-25_17:03:29.091516
2024-01-25_16:12:21.277546 264.5495076651646
2024-01-25_16:12:21.478000 265.0835657916696
2024-01-25_16:12:21.478000 265.0835657916696
2024-01-25_16:12:21.577264 263.86286150251533
2024-01-25_16:12:21.677515 265.9990940085354
2024-01-25_16:12:21.777712 271.30152826454946
2024-01-25_16:12:21.877894 268.02088548744723
2024-01-25_16:12:21.978116 265.5794769091386
2024-01-25_16:12:22.077270 265.6557709272107
2024-01-25_16:12:22.177491 264.81653672841713
2024-01-25_16:12:22.277726 264.5495076651646
2024-01-25_16:12:22.377911 265.0072717735975
2024-01-25_16:12:22.478151 272.2170564814152
2024-01-25_16:12:22.577393 264.9691247645614
2024-01-25_16:12:22.677632 1651.6510502348424
2024-01-25_16:12:22.777818 278.24428390911476
2024-01-25_16:12:22.878015 273.3614667524974
2024-01-25_16:12:22.977183 268.1734735235915
2024-01-25_16:12:23.077366 266.11353503564357
2024-01-25_16:12:23.177565 264.5495076651646
2024-01-25_16:12:23.277781 264.5876546742007
2024-01-25_16:12:23.378020 265.80835896335503
2024-01-25_16:12:23.477223 263.5958324392628
2024-01-25_16:12:23.577437 271.1107932193691
2024-01-25_16:12:23.677707 275.57399327658965
2024-01-25_16:12:23.777916 268.74567865913264
2024-01-25_16:12:23.877121 263.21436234890206
2024-01-25_16:12:23.977303 268.7838256681687
2024-01-25_16:12:24.077539 270.1571179934673
2024-01-25_16:12:24.177809 263.3288033760103
2024-01-25_16:12:24.278045 1591.3787759578474
2024-01-25_16:12:24.377244 278.93093007176407
2024-01-25_16:12:24.477436 267.6394153970865
2024-01-25_16:12:24.577622 266.11353503564357
2024-01-25_16:12:24.677844 267.7920034332308
2024-01-25_16:12:24.778039 264.20618458383996
2024-01-25_16:12:24.877239 263.6721264573349
2024-01-25_16:12:24.977431 264.1298905657678
2024-01-25_16:12:25.077607 262.7947452495053
2024-01-25_16:12:25.177770 263.78656748444314
2024-01-25_16:12:25.277942 270.42414705671985
2024-01-25_16:12:25.377142 272.1789094723792
2024-01-25_16:12:25.477380 264.3969196290203
2024-01-25_16:12:25.577595 264.20618458383996
2024-01-25_16:12:25.677821 263.51953842119065
2024-01-25_16:12:25.778028 274.0862599241828
2024-01-25_16:12:25.877228 271.4922633097298
2024-01-25_16:12:25.977437 3400.2336504303457
2024-01-25_16:12:26.077637 286.1025677705457
2024-01-25_16:12:26.177807 272.7892616169563
2024-01-25_16:12:26.278018 268.36420856877186
2024-01-25_16:12:26.377234 264.6258016832367
2024-01-25_16:12:26.477434 266.0753880266075
2024-01-25_16:12:26.577672 264.4732136470925
2024-01-25_16:12:26.677854 264.3587726199843
2024-01-25_16:12:26.778043 264.4732136470925
2024-01-25_16:12:26.877240 264.24433159287605
2024-01-25_16:12:26.977435 273.93367188803853
2024-01-25_16:12:27.077629 263.86286150251533
2024-01-25_16:12:27.177810 263.2906563669742
2024-01-25_16:12:27.278020 262.90918627661347
2024-01-25_16:12:27.377220 264.0154495386596
2024-01-25_16:12:27.477421 261.91736404167557
2024-01-25_16:12:27.577639 262.3751281501085
2024-01-25_16:12:27.677854 2779.8869894857307
2024-01-25_16:12:27.778060 284.1189233006699
2024-01-25_16:12:27.877248 270.08082397539516
2024-01-25_16:12:27.977432 265.6939179362468
2024-01-25_16:12:28.077614 277.3669027012851
2024-01-25_16:12:28.177834 264.77838971938104
2024-01-25_16:12:28.278036 264.6639486922728
2024-01-25_16:12:28.377231 264.89283074648927
2024-01-25_16:12:28.477467 262.26068712300025
2024-01-25_16:12:28.577695 263.6339794482989
2024-01-25_16:12:28.677937 265.2361538278139
2024-01-25_16:12:28.777151 269.81379491214267
2024-01-25_16:12:28.877348 266.72388718022074
2024-01-25_16:12:28.977550 274.200700951291
2024-01-25_16:12:29.077761 264.24433159287605
2024-01-25_16:12:29.178000 263.48139141215455
2024-01-25_16:12:29.277185 270.69117611997234
2024-01-25_16:12:29.377358 2381.25074505877
2024-01-25_16:12:29.477570 280.9145745416398
2024-01-25_16:12:29.577804 270.42414705671985
2024-01-25_16:12:29.677975 265.84650597239107
2024-01-25_16:12:29.777175 265.6557709272107
2024-01-25_16:12:29.877378 270.9200581741888
2024-01-25_16:12:29.977582 263.4432444031185
2024-01-25_16:12:30.077809 278.4350189542951
2024-01-25_16:12:30.178027 264.8546837374532
2024-01-25_16:12:30.277264 262.0699520778199
2024-01-25_16:12:30.377481 271.7974393820184
2024-01-25_16:12:30.477697 262.29883413203635
2024-01-25_16:12:30.577949 265.6557709272107
2024-01-25_16:12:30.677194 265.3887418639582
2024-01-25_16:12:30.777424 263.2906563669742
2024-01-25_16:12:30.877653 263.9773025296235
2024-01-25_16:12:30.977896 266.41871110793215
2024-01-25_16:12:31.077096 1745.6834275087617
2024-01-25_16:12:31.177263 305.8627184512314
2024-01-25_16:12:31.277489 273.3614667524974
2024-01-25_16:12:31.377689 268.2116205326276
2024-01-25_16:12:31.477891 266.9527692344372
2024-01-25_16:12:31.577108 265.6939179362468
2024-01-25_16:12:31.677331 266.41871110793215
2024-01-25_16:12:31.777536 264.20618458383996
2024-01-25_16:12:31.877699 264.1298905657678
2024-01-25_16:12:31.977881 269.470471830818
2024-01-25_16:12:32.078082 262.26068712300025
2024-01-25_16:12:32.177287 265.0072717735975
2024-01-25_16:12:32.277497 276.56581551152755
2024-01-25_16:12:32.377770 266.41871110793215
2024-01-25_16:12:32.478008 265.77021195431894
2024-01-25_16:12:32.577232 262.52771618625275
2024-01-25_16:12:32.677495 271.1489402284052
2024-01-25_16:12:32.777675 263.21436234890206
2024-01-25_16:12:32.877910 299.30143289702687
2024-01-25_16:12:32.977138 269.3178837946737
2024-01-25_16:12:33.077363 267.71570941515864
2024-01-25_16:12:33.177562 265.3124478458861
2024-01-25_16:12:33.277771 263.17621533986596
2024-01-25_16:12:33.377921 274.6203180506878
2024-01-25_16:12:33.477062 262.4132751591445
2024-01-25_16:12:33.577290 264.9691247645614
2024-01-25_16:12:33.677536 262.7565982404692
2024-01-25_16:12:33.777752 270.65302911093625
2024-01-25_16:12:33.877990 262.8710392675774
2024-01-25_16:12:33.977222 261.95551105071166
2024-01-25_16:12:34.077415 262.90918627661347
2024-01-25_16:12:34.177614 263.17621533986596
2024-01-25_16:12:34.277827 262.4895691772167
2024-01-25_16:12:34.378076 263.710273466371
2024-01-25_16:12:34.477286 268.7838256681687
2024-01-25_16:12:34.577526 311.4703287795341
2024-01-25_16:12:34.677702 271.37782228262165
2024-01-25_16:12:34.777888 265.4268888729943
2024-01-25_16:12:34.877122 271.07264621033306
2024-01-25_16:12:34.977355 263.21436234890206
2024-01-25_16:12:35.077548 263.09992132179383
2024-01-25_16:12:35.177782 263.3288033760103
2024-01-25_16:12:35.277989 263.4050973940824
2024-01-25_16:12:35.377220 264.3969196290203
2024-01-25_16:12:35.477426 263.6721264573349
2024-01-25_16:12:35.577661 264.1680375748039
2024-01-25_16:12:35.677837 262.94733328564956
2024-01-25_16:12:35.778038 268.09717950551936
2024-01-25_16:12:35.877242 261.84107002360344
2024-01-25_16:12:35.977444 269.5086188398541
2024-01-25_16:12:36.077636 263.2906563669742
2024-01-25_16:12:36.177815 265.1217128007057
2024-01-25_16:12:36.278038 319.7482297403619
2024-01-25_16:12:36.377284 272.63667358081204
2024-01-25_16:12:36.477460 266.0753880266075
2024-01-25_16:12:36.577637 276.7184035476718
2024-01-25_16:12:36.677838 266.2279760627518
2024-01-25_16:12:36.778008 264.6258016832367
2024-01-25_16:12:36.877204 264.1680375748039
2024-01-25_16:12:36.977400 264.7020957013089
2024-01-25_16:12:37.077594 264.1680375748039
2024-01-25_16:12:37.177795 262.7565982404692
2024-01-25_16:12:37.277998 262.0318050687838
2024-01-25_16:12:37.377196 264.3206256109482
2024-01-25_16:12:37.477432 263.2906563669742
2024-01-25_16:12:37.577646 262.3369811410724
2024-01-25_16:12:37.677891 261.87921703263953
2024-01-25_16:12:37.777089 263.2906563669742
2024-01-25_16:12:37.877260 262.10809908685593
2024-01-25_16:12:37.977495 4114.765276685025
2024-01-25_16:12:38.077803 289.26876952053976
2024-01-25_16:12:38.178073 277.4050497103211
2024-01-25_16:12:38.277296 275.0399351500846
2024-01-25_16:12:38.377537 269.2034427675655
2024-01-25_16:12:38.477774 269.12714874949336
2024-01-25_16:12:38.577981 263.86286150251533
2024-01-25_16:12:38.677218 280.7238394964595
2024-01-25_16:12:38.777414 263.51953842119065
2024-01-25_16:12:38.877686 264.81653672841713
2024-01-25_16:12:38.977905 263.21436234890206
2024-01-25_16:12:39.077143 262.8710392675774
2024-01-25_16:12:39.177337 262.3369811410724
2024-01-25_16:12:39.277532 264.9691247645614
2024-01-25_16:12:39.377746 261.87921703263953
2024-01-25_16:12:39.477949 270.80561714708057
2024-01-25_16:12:39.577167 261.7647760055313
2024-01-25_16:12:39.677381 262.9854802946856
2024-01-25_16:12:39.777610 263.1380683308299
2024-01-25_16:12:39.877872 263.55768543022674
2024-01-25_16:12:39.977091 261.84107002360344
2024-01-25_16:12:40.077334 263.7484204754071
2024-01-25_16:12:40.177527 266.9527692344372
2024-01-25_16:12:40.277787 1665.7654435781892
2024-01-25_16:12:40.377997 400.009536752259
2024-01-25_16:12:40.477201 290.6420618458384
2024-01-25_16:12:40.577375 274.6203180506878
2024-01-25_16:12:40.677551 270.6148821019002
2024-01-25_16:12:40.777798 280.9527215506759
2024-01-25_16:12:40.878030 265.1217128007057
2024-01-25_16:12:40.977266 266.5331521350404
2024-01-25_16:12:41.077443 270.00452995732303
2024-01-25_16:12:41.177625 265.1217128007057
2024-01-25_16:12:41.277860 264.3206256109482
2024-01-25_16:12:41.377069 263.09992132179383
2024-01-25_16:12:41.477330 263.6339794482989
2024-01-25_16:12:41.577546 263.5958324392628
2024-01-25_16:12:41.677788 262.8710392675774
2024-01-25_16:12:41.777993 270.6148821019002
2024-01-25_16:12:41.877196 275.8028753308061
2024-01-25_16:12:41.977388 262.4895691772167
2024-01-25_16:12:42.077622 264.6258016832367
2024-01-25_16:12:42.177824 261.87921703263953
2024-01-25_16:12:42.278077 264.3206256109482
2024-01-25_16:12:42.377315 267.10535727058146
2024-01-25_16:12:42.477521 261.2307178790263
2024-01-25_16:12:42.577726 263.5958324392628
2024-01-25_16:12:42.677941 263.710273466371
2024-01-25_16:12:42.777144 264.1298905657678
2024-01-25_16:12:42.877338 261.49774694227875
2024-01-25_16:12:42.977566 263.48139141215455
2024-01-25_16:12:43.077775 262.9854802946856
2024-01-25_16:12:43.177979 263.710273466371
2024-01-25_16:12:43.277202 264.3969196290203
2024-01-25_16:12:43.377433 262.7947452495053
2024-01-25_16:12:43.477634 261.95551105071166
2024-01-25_16:12:43.577851 262.90918627661347
2024-01-25_16:12:43.677081 267.7920034332308
2024-01-25_16:12:43.777343 264.5495076651646
2024-01-25_16:12:43.877538 261.1162768519181
2024-01-25_16:12:43.977754 272.5603795627399
2024-01-25_16:12:44.077958 272.63667358081204
2024-01-25_16:12:44.177169 263.1380683308299
2024-01-25_16:12:44.277389 264.2824786019121
2024-01-25_16:12:44.377609 262.90918627661347
2024-01-25_16:12:44.477799 261.68848198745917
2024-01-25_16:12:44.578005 262.3369811410724
2024-01-25_16:12:44.677239 263.82471449347923
2024-01-25_16:12:44.777436 260.88739479770163
2024-01-25_16:12:44.877665 262.52771618625275
2024-01-25_16:12:44.977858 267.98273847841114
2024-01-25_16:12:45.077056 263.06177431275773
2024-01-25_16:12:45.177292 262.4132751591445
2024-01-25_16:12:45.277522 263.86286150251533
2024-01-25_16:12:45.377724 261.3833059151706
2024-01-25_16:12:45.477969 265.77021195431894
2024-01-25_16:12:45.577274 261.612187969387
2024-01-25_16:12:45.677519 261.53589395131485
2024-01-25_16:12:45.777778 263.09992132179383
2024-01-25_16:12:45.878032 262.29883413203635
2024-01-25_16:12:45.977265 263.6339794482989
2024-01-25_16:12:46.077470 273.2088787163531
2024-01-25_16:12:46.177713 263.4432444031185
2024-01-25_16:12:46.277913 265.7320649452829
2024-01-25_16:12:46.377089 268.2879145506997
2024-01-25_16:12:46.477306 261.95551105071166
2024-01-25_16:12:46.577546 261.2307178790263
2024-01-25_16:12:46.677803 263.4050973940824
2024-01-25_16:12:46.778007 263.86286150251533
2024-01-25_16:12:46.877242 261.49774694227875
2024-01-25_16:12:46.977440 263.48139141215455
2024-01-25_16:12:47.077612 261.3833059151706
2024-01-25_16:12:47.177856 260.8111007796295
2024-01-25_16:12:47.277050 261.99365805974776
2024-01-25_16:12:47.377250 262.68030422239707
2024-01-25_16:12:47.477465 262.60401020432494
2024-01-25_16:12:47.577657 261.53589395131485
2024-01-25_16:12:47.677876 262.26068712300025
2024-01-25_16:12:47.777047 262.0318050687838
2024-01-25_16:12:47.877248 262.3369811410724
2024-01-25_16:12:47.977420 263.6339794482989
2024-01-25_16:12:48.077659 261.87921703263953
2024-01-25_16:12:48.177825 261.53589395131485
2024-01-25_16:12:48.278037 262.0318050687838
2024-01-25_16:12:48.377240 261.7266289964952
2024-01-25_16:12:48.477480 261.91736404167557
2024-01-25_16:12:48.577690 264.0917435567317
2024-01-25_16:12:48.677915 270.00452995732303
2024-01-25_16:12:48.777119 271.30152826454946
2024-01-25_16:12:48.877386 261.1925708699902
2024-01-25_16:12:48.977643 263.4050973940824
2024-01-25_16:12:49.077843 262.3751281501085
2024-01-25_16:12:49.177044 261.87921703263953
2024-01-25_16:12:49.277281 272.2552034904513
2024-01-25_16:12:49.377482 262.68030422239707
2024-01-25_16:12:49.477686 262.8710392675774
2024-01-25_16:12:49.577895 263.0236273037217
2024-01-25_16:12:49.677122 262.4132751591445
2024-01-25_16:12:49.777317 269.81379491214267
2024-01-25_16:12:49.877524 261.4214529242066
2024-01-25_16:12:49.977745 261.68848198745917
2024-01-25_16:12:50.077962 260.9255418067377
2024-01-25_16:12:50.177168 262.10809908685593
2024-01-25_16:12:50.277370 261.87921703263953
2024-01-25_16:12:50.377620 273.3996137615335
2024-01-25_16:12:50.477829 260.6585127434852
2024-01-25_16:12:50.577037 262.10809908685593
2024-01-25_16:12:50.677279 261.078129842882
2024-01-25_16:12:50.777470 261.3451589061345
2024-01-25_16:12:50.877682 268.5549436139523
2024-01-25_16:12:50.977894 264.6258016832367
... 29982 more lines ...
|
| Attachment 26: image_00140.tif
|
| Attachment 27: image_00143.tif
|
|
833
|
Wed Jan 24 08:57:25 2024 |
VC, IC, VK, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Commissioning | |
Demmarrage machine à 8h45
IHM ThomX warm-up
8H55 Chauffage klystron, Frigo Ampli laser
9H Chiller
PB er/hf/rac.17-api.di1 et TL/PS/DPI.01
Demarrage cyclage aimants
Start of the RF cavity 500.25 MHz and 50 kV
Start of the accelerator (mode THOMX on MPS)
Loading the receipt good_20240117_17_22_41
Charge-phase scan, tuning of the RF section phase (Gun phase = 273, LIL phase = 114, Att = 1.35)
Transport to the Ring but only 1 turtn. Optimization of the injection but no big imrovement
Loading the receipt from 16/11/223
Optimization of the transport
At 11h50 the modulator interlocked . Then on the MPS there are errorrs (see photo). Need the intervention of support.
13.50 Eric came and fixed the probmlem of one of vacuum valves of the ring, that was causing interlock.
Synchro problem, Kevin repaired.
14.40. Kevin , Ronic entered the bunker to change cable on FPC.
15.10 Restart the machine. Tune of the injector (gun phase 230 and LIL phase 111, charge 72 pC ICT1). it seems that now the energy is not very stable, at TL BPM2 the SpX goes from +2 to -6 (see the screenshot attached). Injection in the ring.
Restart of the RF cavity (problem to start from the interface in the control room)
Only one turn in the ring
During the phase scan of the RF cavity (with rigol) strange bahavior of the trigger. Misstriggering (see the screenshot attached). Problem to be understood. Conclusion: to change the phase of the RF cavity better to use the phase shifter (old position 6094 and nez position 2320).
Storage is reisteblished and improved after optization of the injection : the last good receip is
recipe_recipe_LI_TL_RI_all_20240124_18_17_03.txt
The injection stability to be further investigated (see the screenshot attached)
Use of the trigger on demand. Works well. Checked the duration of beam circulating in the ring (5-10 sec on the scope).
Some tests to check the correlqtino of the energy jumps on TL BPM2 with RF cavity and pulsed elements and dipoles. It seems that there are no effect.
|
| Attachment 1: IMG_2821.jpg
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_53_38.png
|
 |
| Attachment 3: Screenshot_from_2024-01-24_15-13-14.png
|
 |
| Attachment 4: Screenshot_from_2024-01-24_15-35-21.png
|
 |
| Attachment 5: Screenshot_from_2024-01-24_18-15-17.png
|
 |
| Attachment 6: Screenshot_from_2024-01-24_17-54-34.png
|
 |
| Attachment 7: Screenshot_from_2024-01-24_17-33-47.png
|
 |
| Attachment 8: Screenshot_from_2024-01-24_18-41-04.png
|
 |
| Attachment 9: Screenshot_from_2024-01-24_18-43-51.png
|
 |
| Attachment 10: Screenshot_from_2024-01-24_18-45-28.png
|
 |
|
832
|
Tue Jan 23 17:23:32 2024 |
JNC/CB | | Linac | LI | TL | LE |
|
run du 23/01/2024 en cours | |
Iris ajusté à 1.1, image enregistrée à 17h20 dans le répertoire laserPb autorisation de tir, vanne fermée, réouverte
Chargemax à 330 degrés, on se place à 280 degrés.
Focalisation max sur LISST à 227A, energie steerer 4.93MeV, l'énergie est un peu basse
on se met à 235A sur le soleno et on ajuste la phase pour avoir un inimum --> phase 270 degrés--> energy steerer 4.95 MeV
le faisceau est tranmis à 180A sans steerer ni sur li ni sur TL
phase section 110deg, att +1.2dB energy steerer....
.....................125deg ......+1.8..............................
on charge la recette pour l'orbite, on met le soleno à 180A
on vérifie les phases pour l'espread minimale : impossible de lancer l'IHM SST, 10 plantages de suite
270 phase canon, 120 phase section, att +1.35dB, dipole 159.3A
quad scan QP3, QP1= -1.9A, QP2 = +2.35 @180A
quad scan QP3, QP1= -1.8A, QP2 = +2 @195A
On passe du temps à aligner sur QP3 (TL/STr1V=-6A, 1H =-6A) --> quad scan 3 195A
quand scan à 185A (QP1=1.5A, QP2=-1.7A), on retrouve des scan plus cohérent
Arret 20h30
|
|
831
|
Thu Jan 18 00:11:51 2024 |
VK,VM,IC,ND | | Shift summary | LI | TL | LE | Diag |
|
Operations 18/1 | |
9:05 Git pull
9h14: Demarrage modulateur
10h22 Client 3 does not respond; Reboot the machine
10h42 PSS Gele ...
10h46 PSS reparti
10h47 Tension modulateur 1090V (a-t-on une nouvelle consigne?)
Scan des EP
14h18 Modulateur pb at the end of the scan. Resolu 14h30.
14h22 Intervention Philippe: Redemarrage RDP5B17. termine 14h26
15h Comparaison rafraichissement ER/SY/RAC.17-ELR.01-RDP.03 et ER/SY/RAC.17-ELR.01-RDP.04
Dans jive/Device chosir le device et aller dans "event" "waveform_cha &chb" puis mettre "relative" a 0.001 pour que cela rafraichisse tres vite. (mais 1 semble aussi fonctionner) il ne faut pas mettre None
15h30 Pas de faisecau dans la EL... Ajustement du kicker d'extraction
16h18 Test du bouton "Tir unique" dans Synchro/ Phase + Freq
17h06 Comparaison TL/DG/BPM.04 et EL/DG/BPM.01
Attention il faut s' assurer que le gain des BPMs est le meme.
17h40 arret faisceau
===
Bilan de la journée:
* Tâche #12: Verification charge extraite: Fait
* Tâche #56: Scan réglage EP: Fait
* Tâche #5 Nouvel IHM SST: Testé, déployement au prochain git pull (en cours)
* Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM: Pertinence à discuter
* Re-re-re-validation du mode tir unique
* Test et validation de l'acquisition des RDP B17
===
Tâches de la liste de priorité (par ordre de priorité):
Tâche #12: Verification charge extraite
Tâche #56: Scan réglage EP
Tâche #5 Nouvel IHM SST
Tâche #8: démarrer MRSV
Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM
Test diags LE
|
| Attachment 1: health_check_2024_01_18_09_15.png
|
 |
| Attachment 2: scan_Laser_vs_RF_phase_2024_01_18_10_50.png
|
 |
| Attachment 3: bpm_1_vs_kicker_inj12H55.png
|
 |
| Attachment 4: bpm_1_vs_septum_13h28.png
|
 |
| Attachment 5: bpm_1_vs_septum_14h16.png
|
 |
| Attachment 6: bpm_0_vs_septum_14h16.png
|
 |
| Attachment 7: bpm_0_vs_ext_kicker_second_16h41.png
|
 |
| Attachment 8: bpm_0_vs_ext_kicker_second_16h53.png
|
 |
| Attachment 9: bpm_0_vs_ext_kicker_second_16h59.png
|
 |
| Attachment 10: Screenshot_from_2024-01-18_17-06-02.png
|
 |
|
830
|
Wed Jan 17 08:55:07 2024 |
VC-KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
commitionning | |
8H50
Demarrage chauffage, chiller, et cyclage aimants
TL/PS/DPI.01 en défaut resolu par un reset sur l'ATK pannel
les redpitaya étaient parametrées en defaut (comme s'il y avait eu une coupure de courant entre hier et aujourd'hui)
les waveform de la er\sy\rac.17-elr.01\RDP.03 (redpitaya 3 baie 17) sont toujours acquisent plus lentement que les autres (alors que le event ID compte comme les autres RDP vérifiers sur 1000 events ID dans ATK pannel)
alingnement laser sur PC avec courant d'oscurité
alignement du triplet linac
TL\DG\SST.02 en disfonctionne (caméra ok mais pas de faisceau sur le YAG on voit bien la mire)
alignement des quad sur la TL
Arret et redemarage des serveurs TL\DG\SST.02\CCD.01 dans ASTOR
le reglage du dipole et phase et att section
dipole 159.3
phase lil 107
Att lil 1.31dB
position centre faisceau sur TL\BPM2 X 4mm Y 0mm
redemarrage modulateur 13h30 1090V
charge faiceau
LI/DG/ICT.01 103pC
TL/DG/ICT.01 108pC
TL/DG/ICT.02 110pC
EP alumés manuellement (reset en local )
Ri-c1/dg/BMP.05-LIB04 pas de signal (TbT ne fonctionne pas) serveur redemarré OK
quelques tour dans l'anneau (sans cavité RF)
on bouge delay kicker d'extraction de -7.97µs à -7.10µs
V kicker 6600 V => faisceau au milieu du BPM LE
sur IHM retards synchro : il faut pouvoir piloter les retards avec une précision d'une ns au moins pour les kickers
PB led allumées sur DG\EL\SST.01
pB résolu par Nicolas et Kevin les leds EL sst.0.1 est sur le powerswitch
fisceau sur l'ecran yag ... non optimisé
RECETTE pour aller dans la LE en passant par l'anneau sauvé sous : good_20240117_17_22_41 avec Kicker d'extraction à 6150V (à ajouter dans la recette)
voir image. Il reste à optimiser le faisceau (ligne horizontal actuellement).
|
| Attachment 1: 2024-01-17_11_50_48_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 2: 2024-01-17_11_49_00_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 3: 2024-01-17_11_48_11_tl_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 4: 2024-01-17_11_47_40_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 5: 2024-01-17_15_11_47_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 6: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 7: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 8: EL_BPM_after_ring.png
|
 |
| Attachment 9: Storage_ring.png
|
 |
| Attachment 10: StorageRingExtraction.png
|
 |
|
829
|
Tue Jan 16 09:00:27 2024 |
MJ et SC | | Shift summary | Linac Commissionning |
|
| |
9h Mise en chauffe modulateur et refroidissements
Démarrage ampli laser
9h07 fermeture casemate
faisceau sur yag
bpmLI1 sature (screenshot) + mesure charge marche pas - Intervention nicolas et vincent :
Mesure de charge ictLI remarche decalage du linac trigger laser gun de -8 us à -8.20 us en retard
bpmLI1 redevenu OK
charge 100 pC (attenuateur laser 310)
-50 pour phase pour energie max - soleno 210 - phase canon 316
steerer LI ne s'allument pas (appel Jean noel ) - probleme regle par JN
mesure energie : 5.2 MeV
passage section --> faisceau sur yagtl1
mesure energie section :
53 MeV pour 1.75 db phase 110
50.7 MeV pour 2 db phase 110
ictTL01 MARCHE PAS (screenshot) --> demande a Nicolas
Dipole on : 159.3
faisceau sur bpmTL2 (screenshot) - RIEN sur YAGTL2 impossible de visualiser ni faisceau ni courant obscurite --> appel Nicolas
Plus aucune camera ne peut etre mises sur ON - Comme il n' y a personne pour m'aider j'essaye "restart all camera server " - YagTL1 refonctionne apres ca -
mais YAGTL2 ne marche toujours pas, ni ictTL01 (ni sans doute ictTL2 ni yagtl03) - signaux RF ne sont plus visibles sur RF_plot (alors qu'il y a du faisceau)
donc : FIN de shift
Bon finalement on essaye de continuer quand meme ...
On a reussi a avoir du signal sur BPMTL4 en mettant l'attenuateur section a 1.6. Au dessus pas de signal dans BPMTL4 (voir screenshot)
Remesure d'energie a 1.6 attenuateur section : 52.5 MeV (Au debut de shift on avait 50.7 MeV pour 2 db)
Incomprehensible : pourquoi le faisceau passe dans la TL a 1.6 db et PAS a 2 db
Bilan : pas de faisceau sur TL/DG/SST.02 apres dipole
|
| Attachment 1: 2024-01-16_10-49-54_yag_bpm_LI.png
|
 |
| Attachment 2: 2024-01-16_13-25-52_charges.png
|
 |
| Attachment 3: 2024-01-16_13-28-26_bpmTL2.png
|
 |
| Attachment 4: 2024-01-16_14-37-22-TLbpm.png
|
 |
|
828
|
Mon Jan 15 10:41:48 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Jan 15 10:41:24 2024 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Bonjour,
l'état actuel du laser: on a passé le width du Pockels de 1330 à 1550 ns.
On a Eir=1.4mJ; Euv=56µJ sur la cathode, la position de atténuateur - 420.
Viktor |
|
827
|
Thu Jan 11 14:47:37 2024 |
ND | Fixed | Info | Diag |
|
Redémarrage diags + synchro | |
Pour la synchro, les generateurs de retard ont ete redemarres.
Pour les diags: redemarrage de icePapControllerB6 et Wavecatchers.
Signal OK (sans faisceau) sur BPM, ICT et sur ecrans.
|
| Attachment 1: health_check_Diag_2024_01_11_14_54.png
|
 |
| Attachment 2: health_check_2024_01_11_14_55.png
|
 |
|
826
|
Wed Dec 13 11:20:19 2023 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 | | Info | LI | SY |
|
Changement fréquence linac | |
Suite à une demande de Jean-Noël, la fréquence linac a été changé.
Nous sommes maintenant à la fréquence nominale + 500Hz: 2998.550500MHz.
La fréquence anneau est inchangée.
|
|
825
|
Tue Dec 12 12:48:58 2023 |
Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 | | Info | SY |
|
Changement de frequence linac | |
Suite discussion avec Jean-Boel et Vincent, la frequence linac a ete remise a 2998550000Hz (nominal).
La frequence anneau est inchangee a 500.250000 MHz
Les frequences peuvent etre verifiee dans PlateformIHM / Synchro / Synthetiser status
|
| Attachment 1: Screenshot_from_2023-12-12_12-57-04.png
|
 |
|
824
|
Mon Dec 11 09:41:41 2023 |
VC,ND | | Shift summary | SY |
|
Tests synchro | |
8H15 démarrage chiller et modulateur
Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76
Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.
On voit régulièrement des arrêts de 8 secondes (ou 16 secondes) dans les données envoyées par la RDP.
16h36: Arrêt |
|
823
|
Thu Dec 7 14:46:29 2023 |
VC, ND | | Shift summary | SY |
|
Tests synchro | |
Objectif: Test nouveau code CPLD
14:44 Mise en chauffe modulateur
Le code semble fonctionner => tests avec modulateur
15:44 Trig
De nombreux coups manqués. Il va falloir augmenter la largeur des portes echantillonant le 33MHz et le 41MHz. Le nombre de coups manqué est le même à 500,250MHz et à 500.002MHz.
16:50 arrêt |
|
822
|
Thu Nov 23 08:51:44 2023 |
SC/KD | | Anneau | LI | TL | LE | Ring |
|
Faisceau LE | |
8h50 Mise en chauffe modulateur
Mise en route chillers et frigo
Problème laser photocathode : en cours d'investigation par Kevin et Viktor
10h Résolution problème laser nécessaire, arret modulateur, chillers et frigo
|
|
821
|
Tue Nov 21 14:29:01 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 | | Shift summary | Diag |
|
Prise de donnees 21/11 | |
13:57 Mise en chauffe
15:00 Faisecau
Tests sur les ecrans
17:00 Arret |