  840   Fri Feb 2 08:16:50 2024 Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024Under ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Shift du 2 février 2024 

La clé PA est resté enclenchée hier. Il faut penser à la tourner avant de partir (demande de Maher)

8h15 : Mise en chauffe machine (aimants, chillers, laser, modulateur).

Pas de mesure de charge (WAC, délai ?)

 

Recherche de la cause de la perte de puissance

** Klystron 1090 ==> 2MW en Pi Load

Initial : TL/BPM.02 à 0 (Dipôle 160.8A) ==> 1.27dB

On test les sources de pertes de puissance :

* Changement frequence RF (-500Hz)

pas de changement

* Changement temperature section ( consigne 29.5°C ==> 29.2°C)

TL/BPM.02 à 0 ==> 1.39dB

On continue pour trouver l'optimum

optimum trouvé autour de 27.0°C en consigne.

TL/BPM.02 à 0 ==> 1.73dB

 

** Essaie de rentrer dans l'anneau. Impossible de faire un tour. Reprise du septum, on gagne 2 BPM mais les deux dernier ne voit pas de faisceau.

==> problème de délai des EP ?

Hier modification du retard du laser PC pour vérifier que l'on était bien dans l'impulsion RF au niveau de la section LIL. Passage du retard de -8.2µ à -8.4µs (pas de changement sur l'energie faisceau)

 

remise du retard à -8.2µs

parametre pour mardi

recette good for Xray and EL opérationel  (atténuateur section 1.385dB   29.2°C)

Arret machine

 

 

Attachment 1: Screenshot_2024-02-02_12-05-19.png
Screenshot_2024-02-02_12-05-19.png
  839   Thu Feb 1 16:30:20 2024 Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024Under ProcessShift summaryLI | TL | LE | Ring Complement de la fin du elog 837 

En complement de la fin de l'entree elog 837 ou il est ecrit a la fin :

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes

j'ajoute qu'on a aussi fait le stest suivant :

a la phase LIL =133 (10MW PiS power-meter casemate, courant dipole ~148 A au lieu des 159.3 nominal), le faisceau est bien visible sur YAGTL2,  au minumum de dipersion et a x ~ 0 sur BPMTL2

on passe a +5 (138) en phase : faisceau disperse qui va vers la gauche de l'ecran et valeurs negatives BPM.

on passe a -5 (128) en phase : idem (= disperse qui va vers la gauche de l'ecran et valeurs negatives BPM).

--> Ca semble montrer qu'on est bien sur la crete de l'impusion, que la perte des 5 MeV d'energie depuis le redemarrage sem derniere n'est pas due au fait qu'on serait par erreur sur un front montant ou descendant de l'impulsion ...

  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons 

La puissance entree canon a ete verifie et conforme a l'atterndu (6 MW = 18/3 MW)

Avec l'attenuateur a 2 db, le power meter dans la casemate affiche 9 mW entree LIL.

--> Le faisceau est detecte sur BPMTL2 et sur YAGTL2 pour I_DIPOLE = 143 A ce qui, avec les caracteristique du dipole, correspond a une energie sortie section de 45.5 MeV

  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 

8h10 rémarrage machine chauffage klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y  (tous les DS redpy baie 17 )

Cycling ok

ready to start at 9h15
 

Sophie; Hayg peresent. Other people for ring formation  are  missing  without 

 

Mohamed installed powermeter in the casemate.

Sophie prepare linac.

PROBLEM: Observation: too many missed triggers from modumator. Call Vincent.Incertitude synchro: IMPORTANT solution by Vincent (more details ask Vincent):

Problem solution: change RF frequency 250000-250001 ; confirm on synchoro scope frequency sweep; change back 250000-250001; Problem solved, confirmed on scope http://192.168.229.21

Resolution d'instabilité de déclenche du modulateur:

si le signal observé sur  ICT 1 (Gun) n'apparait pas à 10Hz  (ie nBs de coups manqués sup à 1:100) => pB de synchro

pour le résoudre il faut changer la phase entre le 500MHz ri et le 33MHz ri. 

solutions:

1- changer la fréquence 500MHz ri  , +1Hz et -1Hz    (aller retour)

2- changer la fréquence du 33MHz ri  +1Hz et -1Hz    (aller retour)

3- changer la phase du 33MHz ri (0.1°)

Attention la phase injection anneau et la phase FP/ electrons peut changer

test à faire pour expliquer la perte d'énergie du faisceau.

 

 

 

10.43 PROBLEM no explanation of : beam energy  wrt to attenuator and section power

section 9.8 MW att 2 dB

canon 6.35 MW

Beam at TL2 for att 2dB for dipole 147.3 . Section Power 10.4MW

12.30-13.30h Lunch pause

14h restart , try to understand power vs electrons energy mismatch.

We can not proceed to ring injection at wrong electron  beam energy. Attenuator should be reduced to 1.3 , which  is not allowed by Mohamed, since section power should not exceed 11 MW. 

Check de la postion temporelle du faisceau d'électron dans la RF de la section: la position actuelle est bonne une avance de 200ns (passage de -8.2µs à -8.4µs ) de l'impulsion laser PC dans l'impulsion RF ne change pas l'energie du faisceau 

(test sur la varation de position sur SST0.2)

 

test Puissance dasn la secteur LIL

Pin section wattmetre sur coupleur d'entrée 10.5MW

Pout charge mesure demain...

 

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes

 

 

 

16:00; Stop shift machine et arret machine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  836   Wed Jan 31 14:12:25 2024 RC VC MJ Under ProcessOtherRing Commissioning commitionning 

Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par step

14:  formation CFP + machine (anneau et extraction line)

==> alignement point cathode sur courant d'obscurité + alignement dans Quad (cf. screenshot)

==> affinage extraction line (cf. Screenshot)

Recette sauvegardée dans "good_20240131_16_01_08"

La recette précédente à permis d'injecter directement dans l'anneau (aucune modification autre que phase + atténuateur) (pas de changement de phase cavité RF)

X: trouvé directement (phase 500MHz ajusté à 7.3V)

17h30 : arrât machine

Attachment 1: 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png
2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png
Attachment 2: 2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
  835   Fri Jan 26 09:36:01 2024 ND, Anna K, Elene K Shift summaryLI | TL | LE Data taking 26/01 

9:30 Warm-up

11:00 Modulator OFF => restart warm-up

Pb temperature section.

12h15: Pb temperature canon.

12h30 Lunch break

13h30 Pb temperature fixed by Kevin.

Restart

Beam jittery.

Phase shifter was at 4530.

Recipe: LI_TL_RI_all_20240125_16_29_34

Beam seen on EL/DG/SST.01 but strongly spread horizontally. Attempts to focus it but with limited success.

Faraday cup study: Noise from the kickers is very strong difficult to see any other signal.

See images attached: 2 kickers: Screenshot_from_2024-01-26_17-06-36.png

ext kicker only: Screenshot_from_2024-01-26_17-09-19.png

inj kicker only: Screenshot_from_2024-01-26_17-07-16.png

No kicker: Screenshot_from_2024-01-26_17-08-36.png

17h40 Stop

Attachment 1: health_check_2024_01_26_09_45.png
health_check_2024_01_26_09_45.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_26_13_53.png
scan_Laser_vs_RF_phase_2024_01_26_13_53.png
Attachment 3: Screenshot_from_2024-01-26_17-06-36.png
Screenshot_from_2024-01-26_17-06-36.png
Attachment 4: Screenshot_from_2024-01-26_17-07-16.png
Screenshot_from_2024-01-26_17-07-16.png
Attachment 5: Screenshot_from_2024-01-26_17-09-19.png
Screenshot_from_2024-01-26_17-09-19.png
Attachment 6: Screenshot_from_2024-01-26_17-08-36.png
Screenshot_from_2024-01-26_17-08-36.png
Attachment 7: 2024-01-26_17_26_05_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
2024-01-26_17_26_05_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
  834   Thu Jan 25 08:49:29 2024 VC DN ND, IC, VM, KD, AS RC , VK...Under ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 

8h45 demarrage chauffage Modulateur et frigo

Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible  (pc laser demarré par Kevin)

8h50 demarrage chiller et cycling magnet   => OK

9h13 demarrage ampli laser PC

9h30 Git pull

10h20 Demarrage faisceau

10h27 Recette chargee: all_20240124_18_17_03

10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge

Phase RF section 126

10h53 Etude de l'influence de la phase laser sur la phase RF.

10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0

10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000

11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000

11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000

11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000

11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000

11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000

Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...

11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.

11h32 phase anneau initiale 2320, new phase: 4500

Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved.  The new receipt is

recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt

For this receipt the x- beam position @TL BPM2 should be 0 mm.

During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.

The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)

Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%

The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)

 

Plein de choses a ecrire... Acces PERLE, des rayons X,...

Une dizaine de personnes en SdC.

 

15h30 scan en temps du kicker d 'extraction.

Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.

Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).

Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.

Suggestion de retard pour le kicker d 'extraction: -8.310us

Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.

Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)

** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé

** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.

** image prise du centre du faisceau

** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)

** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)

Paramètre synchro CFP/Anneau :

* delai trig/cfp (19.4ns),

* dephaseur 500MHz (7.2V),

* setpoint cavité CFP (0V) sur pente négative,

* phase rigol (0° voie1, 204° voie2).

Attachment 1: health_check_2024_01_25_10_20.png
health_check_2024_01_25_10_20.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_25_10_24.png
scan_Laser_vs_RF_phase_2024_01_25_10_24.png
Attachment 3: scan_Laser_vs_RF_phase_2024_01_25_10_55.png
scan_Laser_vs_RF_phase_2024_01_25_10_55.png
Attachment 4: scan_Laser_vs_RF_phase_2024_01_25_10_58.png
scan_Laser_vs_RF_phase_2024_01_25_10_58.png
Attachment 5: scan_Laser_vs_RF_phase_2024_01_25_11_00.png
scan_Laser_vs_RF_phase_2024_01_25_11_00.png
Attachment 6: scan_Laser_vs_RF_phase_2024_01_25_11_02.png
scan_Laser_vs_RF_phase_2024_01_25_11_02.png
Attachment 7: scan_Laser_vs_RF_phase_2024_01_25_11_04.png
scan_Laser_vs_RF_phase_2024_01_25_11_04.png
Attachment 8: scan_Laser_vs_RF_phase_2024_01_25_11_07.png
scan_Laser_vs_RF_phase_2024_01_25_11_07.png
Attachment 9: scan_Laser_vs_RF_phase_2024_01_25_11_12.png
scan_Laser_vs_RF_phase_2024_01_25_11_12.png
Attachment 10: Screenshot_from_2024-01-25_11-18-55.png
Screenshot_from_2024-01-25_11-18-55.png
Attachment 11: bpm_0_vs_ext_kicker_second_15h59.png
bpm_0_vs_ext_kicker_second_15h59.png
Attachment 12: Screenshot_from_2024-01-25_15-53-54.png
Screenshot_from_2024-01-25_15-53-54.png
Attachment 13: Screenshot_from_2024-01-25_15-58-31.png
Screenshot_from_2024-01-25_15-58-31.png
Attachment 14: bpm_0_vs_ext_kicker_second_16h22.png
bpm_0_vs_ext_kicker_second_16h22.png
Attachment 15: Screenshot_from_2024-01-25_17-14-11.png
Screenshot_from_2024-01-25_17-14-11.png
Attachment 16: Screenshot_from_2024-01-25_17-13-45.png
Screenshot_from_2024-01-25_17-13-45.png
Attachment 17: Screenshot_from_2024-01-25_17-12-36.png
Screenshot_from_2024-01-25_17-12-36.png
Attachment 18: Screenshot_from_2024-01-25_13-05-25.png
Screenshot_from_2024-01-25_13-05-25.png
Attachment 19: S_HisPhase.png
S_HisPhase.png
Attachment 20: S_Phase25012025.png
S_Phase25012025.png
Attachment 21: S_Ampl25012025.png
S_Ampl25012025.png
Attachment 22: figSRorbit_25012024.png
figSRorbit_25012024.png
Attachment 23: TbtX_BPM2_999turn_20_turn_24Jan25Jan_comparizon.pdf
Attachment 24: untitled.png
untitled.png
Attachment 25: mesures_X_stable_table_presque_opt2.dat
# DATASET= "xli/op/tmd.01/i1[0]"
# SNAPSHOT_TIME= 2024-01-25_17:03:29.091516
2024-01-25_16:12:21.277546	264.5495076651646
2024-01-25_16:12:21.478000	265.0835657916696
2024-01-25_16:12:21.478000	265.0835657916696
2024-01-25_16:12:21.577264	263.86286150251533
2024-01-25_16:12:21.677515	265.9990940085354
2024-01-25_16:12:21.777712	271.30152826454946
2024-01-25_16:12:21.877894	268.02088548744723
2024-01-25_16:12:21.978116	265.5794769091386
2024-01-25_16:12:22.077270	265.6557709272107
2024-01-25_16:12:22.177491	264.81653672841713
2024-01-25_16:12:22.277726	264.5495076651646
2024-01-25_16:12:22.377911	265.0072717735975
2024-01-25_16:12:22.478151	272.2170564814152
2024-01-25_16:12:22.577393	264.9691247645614
2024-01-25_16:12:22.677632	1651.6510502348424
2024-01-25_16:12:22.777818	278.24428390911476
2024-01-25_16:12:22.878015	273.3614667524974
2024-01-25_16:12:22.977183	268.1734735235915
2024-01-25_16:12:23.077366	266.11353503564357
2024-01-25_16:12:23.177565	264.5495076651646
2024-01-25_16:12:23.277781	264.5876546742007
2024-01-25_16:12:23.378020	265.80835896335503
2024-01-25_16:12:23.477223	263.5958324392628
2024-01-25_16:12:23.577437	271.1107932193691
2024-01-25_16:12:23.677707	275.57399327658965
2024-01-25_16:12:23.777916	268.74567865913264
2024-01-25_16:12:23.877121	263.21436234890206
2024-01-25_16:12:23.977303	268.7838256681687
2024-01-25_16:12:24.077539	270.1571179934673
2024-01-25_16:12:24.177809	263.3288033760103
2024-01-25_16:12:24.278045	1591.3787759578474
2024-01-25_16:12:24.377244	278.93093007176407
2024-01-25_16:12:24.477436	267.6394153970865
2024-01-25_16:12:24.577622	266.11353503564357
2024-01-25_16:12:24.677844	267.7920034332308
2024-01-25_16:12:24.778039	264.20618458383996
2024-01-25_16:12:24.877239	263.6721264573349
2024-01-25_16:12:24.977431	264.1298905657678
2024-01-25_16:12:25.077607	262.7947452495053
2024-01-25_16:12:25.177770	263.78656748444314
2024-01-25_16:12:25.277942	270.42414705671985
2024-01-25_16:12:25.377142	272.1789094723792
2024-01-25_16:12:25.477380	264.3969196290203
2024-01-25_16:12:25.577595	264.20618458383996
2024-01-25_16:12:25.677821	263.51953842119065
2024-01-25_16:12:25.778028	274.0862599241828
2024-01-25_16:12:25.877228	271.4922633097298
2024-01-25_16:12:25.977437	3400.2336504303457
2024-01-25_16:12:26.077637	286.1025677705457
2024-01-25_16:12:26.177807	272.7892616169563
2024-01-25_16:12:26.278018	268.36420856877186
2024-01-25_16:12:26.377234	264.6258016832367
2024-01-25_16:12:26.477434	266.0753880266075
2024-01-25_16:12:26.577672	264.4732136470925
2024-01-25_16:12:26.677854	264.3587726199843
2024-01-25_16:12:26.778043	264.4732136470925
2024-01-25_16:12:26.877240	264.24433159287605
2024-01-25_16:12:26.977435	273.93367188803853
2024-01-25_16:12:27.077629	263.86286150251533
2024-01-25_16:12:27.177810	263.2906563669742
2024-01-25_16:12:27.278020	262.90918627661347
2024-01-25_16:12:27.377220	264.0154495386596
2024-01-25_16:12:27.477421	261.91736404167557
2024-01-25_16:12:27.577639	262.3751281501085
2024-01-25_16:12:27.677854	2779.8869894857307
2024-01-25_16:12:27.778060	284.1189233006699
2024-01-25_16:12:27.877248	270.08082397539516
2024-01-25_16:12:27.977432	265.6939179362468
2024-01-25_16:12:28.077614	277.3669027012851
2024-01-25_16:12:28.177834	264.77838971938104
2024-01-25_16:12:28.278036	264.6639486922728
2024-01-25_16:12:28.377231	264.89283074648927
2024-01-25_16:12:28.477467	262.26068712300025
2024-01-25_16:12:28.577695	263.6339794482989
2024-01-25_16:12:28.677937	265.2361538278139
2024-01-25_16:12:28.777151	269.81379491214267
2024-01-25_16:12:28.877348	266.72388718022074
2024-01-25_16:12:28.977550	274.200700951291
2024-01-25_16:12:29.077761	264.24433159287605
2024-01-25_16:12:29.178000	263.48139141215455
2024-01-25_16:12:29.277185	270.69117611997234
2024-01-25_16:12:29.377358	2381.25074505877
2024-01-25_16:12:29.477570	280.9145745416398
2024-01-25_16:12:29.577804	270.42414705671985
2024-01-25_16:12:29.677975	265.84650597239107
2024-01-25_16:12:29.777175	265.6557709272107
2024-01-25_16:12:29.877378	270.9200581741888
2024-01-25_16:12:29.977582	263.4432444031185
2024-01-25_16:12:30.077809	278.4350189542951
2024-01-25_16:12:30.178027	264.8546837374532
2024-01-25_16:12:30.277264	262.0699520778199
2024-01-25_16:12:30.377481	271.7974393820184
2024-01-25_16:12:30.477697	262.29883413203635
2024-01-25_16:12:30.577949	265.6557709272107
2024-01-25_16:12:30.677194	265.3887418639582
2024-01-25_16:12:30.777424	263.2906563669742
2024-01-25_16:12:30.877653	263.9773025296235
2024-01-25_16:12:30.977896	266.41871110793215
2024-01-25_16:12:31.077096	1745.6834275087617
2024-01-25_16:12:31.177263	305.8627184512314
2024-01-25_16:12:31.277489	273.3614667524974
2024-01-25_16:12:31.377689	268.2116205326276
2024-01-25_16:12:31.477891	266.9527692344372
2024-01-25_16:12:31.577108	265.6939179362468
2024-01-25_16:12:31.677331	266.41871110793215
2024-01-25_16:12:31.777536	264.20618458383996
2024-01-25_16:12:31.877699	264.1298905657678
2024-01-25_16:12:31.977881	269.470471830818
2024-01-25_16:12:32.078082	262.26068712300025
2024-01-25_16:12:32.177287	265.0072717735975
2024-01-25_16:12:32.277497	276.56581551152755
2024-01-25_16:12:32.377770	266.41871110793215
2024-01-25_16:12:32.478008	265.77021195431894
2024-01-25_16:12:32.577232	262.52771618625275
2024-01-25_16:12:32.677495	271.1489402284052
2024-01-25_16:12:32.777675	263.21436234890206
2024-01-25_16:12:32.877910	299.30143289702687
2024-01-25_16:12:32.977138	269.3178837946737
2024-01-25_16:12:33.077363	267.71570941515864
2024-01-25_16:12:33.177562	265.3124478458861
2024-01-25_16:12:33.277771	263.17621533986596
2024-01-25_16:12:33.377921	274.6203180506878
2024-01-25_16:12:33.477062	262.4132751591445
2024-01-25_16:12:33.577290	264.9691247645614
2024-01-25_16:12:33.677536	262.7565982404692
2024-01-25_16:12:33.777752	270.65302911093625
2024-01-25_16:12:33.877990	262.8710392675774
2024-01-25_16:12:33.977222	261.95551105071166
2024-01-25_16:12:34.077415	262.90918627661347
2024-01-25_16:12:34.177614	263.17621533986596
2024-01-25_16:12:34.277827	262.4895691772167
2024-01-25_16:12:34.378076	263.710273466371
2024-01-25_16:12:34.477286	268.7838256681687
2024-01-25_16:12:34.577526	311.4703287795341
2024-01-25_16:12:34.677702	271.37782228262165
2024-01-25_16:12:34.777888	265.4268888729943
2024-01-25_16:12:34.877122	271.07264621033306
2024-01-25_16:12:34.977355	263.21436234890206
2024-01-25_16:12:35.077548	263.09992132179383
2024-01-25_16:12:35.177782	263.3288033760103
2024-01-25_16:12:35.277989	263.4050973940824
2024-01-25_16:12:35.377220	264.3969196290203
2024-01-25_16:12:35.477426	263.6721264573349
2024-01-25_16:12:35.577661	264.1680375748039
2024-01-25_16:12:35.677837	262.94733328564956
2024-01-25_16:12:35.778038	268.09717950551936
2024-01-25_16:12:35.877242	261.84107002360344
2024-01-25_16:12:35.977444	269.5086188398541
2024-01-25_16:12:36.077636	263.2906563669742
2024-01-25_16:12:36.177815	265.1217128007057
2024-01-25_16:12:36.278038	319.7482297403619
2024-01-25_16:12:36.377284	272.63667358081204
2024-01-25_16:12:36.477460	266.0753880266075
2024-01-25_16:12:36.577637	276.7184035476718
2024-01-25_16:12:36.677838	266.2279760627518
2024-01-25_16:12:36.778008	264.6258016832367
2024-01-25_16:12:36.877204	264.1680375748039
2024-01-25_16:12:36.977400	264.7020957013089
2024-01-25_16:12:37.077594	264.1680375748039
2024-01-25_16:12:37.177795	262.7565982404692
2024-01-25_16:12:37.277998	262.0318050687838
2024-01-25_16:12:37.377196	264.3206256109482
2024-01-25_16:12:37.477432	263.2906563669742
2024-01-25_16:12:37.577646	262.3369811410724
2024-01-25_16:12:37.677891	261.87921703263953
2024-01-25_16:12:37.777089	263.2906563669742
2024-01-25_16:12:37.877260	262.10809908685593
2024-01-25_16:12:37.977495	4114.765276685025
2024-01-25_16:12:38.077803	289.26876952053976
2024-01-25_16:12:38.178073	277.4050497103211
2024-01-25_16:12:38.277296	275.0399351500846
2024-01-25_16:12:38.377537	269.2034427675655
2024-01-25_16:12:38.477774	269.12714874949336
2024-01-25_16:12:38.577981	263.86286150251533
2024-01-25_16:12:38.677218	280.7238394964595
2024-01-25_16:12:38.777414	263.51953842119065
2024-01-25_16:12:38.877686	264.81653672841713
2024-01-25_16:12:38.977905	263.21436234890206
2024-01-25_16:12:39.077143	262.8710392675774
2024-01-25_16:12:39.177337	262.3369811410724
2024-01-25_16:12:39.277532	264.9691247645614
2024-01-25_16:12:39.377746	261.87921703263953
2024-01-25_16:12:39.477949	270.80561714708057
2024-01-25_16:12:39.577167	261.7647760055313
2024-01-25_16:12:39.677381	262.9854802946856
2024-01-25_16:12:39.777610	263.1380683308299
2024-01-25_16:12:39.877872	263.55768543022674
2024-01-25_16:12:39.977091	261.84107002360344
2024-01-25_16:12:40.077334	263.7484204754071
2024-01-25_16:12:40.177527	266.9527692344372
2024-01-25_16:12:40.277787	1665.7654435781892
2024-01-25_16:12:40.377997	400.009536752259
2024-01-25_16:12:40.477201	290.6420618458384
2024-01-25_16:12:40.577375	274.6203180506878
2024-01-25_16:12:40.677551	270.6148821019002
2024-01-25_16:12:40.777798	280.9527215506759
2024-01-25_16:12:40.878030	265.1217128007057
2024-01-25_16:12:40.977266	266.5331521350404
2024-01-25_16:12:41.077443	270.00452995732303
2024-01-25_16:12:41.177625	265.1217128007057
2024-01-25_16:12:41.277860	264.3206256109482
2024-01-25_16:12:41.377069	263.09992132179383
2024-01-25_16:12:41.477330	263.6339794482989
2024-01-25_16:12:41.577546	263.5958324392628
2024-01-25_16:12:41.677788	262.8710392675774
2024-01-25_16:12:41.777993	270.6148821019002
2024-01-25_16:12:41.877196	275.8028753308061
2024-01-25_16:12:41.977388	262.4895691772167
2024-01-25_16:12:42.077622	264.6258016832367
2024-01-25_16:12:42.177824	261.87921703263953
2024-01-25_16:12:42.278077	264.3206256109482
2024-01-25_16:12:42.377315	267.10535727058146
2024-01-25_16:12:42.477521	261.2307178790263
2024-01-25_16:12:42.577726	263.5958324392628
2024-01-25_16:12:42.677941	263.710273466371
2024-01-25_16:12:42.777144	264.1298905657678
2024-01-25_16:12:42.877338	261.49774694227875
2024-01-25_16:12:42.977566	263.48139141215455
2024-01-25_16:12:43.077775	262.9854802946856
2024-01-25_16:12:43.177979	263.710273466371
2024-01-25_16:12:43.277202	264.3969196290203
2024-01-25_16:12:43.377433	262.7947452495053
2024-01-25_16:12:43.477634	261.95551105071166
2024-01-25_16:12:43.577851	262.90918627661347
2024-01-25_16:12:43.677081	267.7920034332308
2024-01-25_16:12:43.777343	264.5495076651646
2024-01-25_16:12:43.877538	261.1162768519181
2024-01-25_16:12:43.977754	272.5603795627399
2024-01-25_16:12:44.077958	272.63667358081204
2024-01-25_16:12:44.177169	263.1380683308299
2024-01-25_16:12:44.277389	264.2824786019121
2024-01-25_16:12:44.377609	262.90918627661347
2024-01-25_16:12:44.477799	261.68848198745917
2024-01-25_16:12:44.578005	262.3369811410724
2024-01-25_16:12:44.677239	263.82471449347923
2024-01-25_16:12:44.777436	260.88739479770163
2024-01-25_16:12:44.877665	262.52771618625275
2024-01-25_16:12:44.977858	267.98273847841114
2024-01-25_16:12:45.077056	263.06177431275773
2024-01-25_16:12:45.177292	262.4132751591445
2024-01-25_16:12:45.277522	263.86286150251533
2024-01-25_16:12:45.377724	261.3833059151706
2024-01-25_16:12:45.477969	265.77021195431894
2024-01-25_16:12:45.577274	261.612187969387
2024-01-25_16:12:45.677519	261.53589395131485
2024-01-25_16:12:45.777778	263.09992132179383
2024-01-25_16:12:45.878032	262.29883413203635
2024-01-25_16:12:45.977265	263.6339794482989
2024-01-25_16:12:46.077470	273.2088787163531
2024-01-25_16:12:46.177713	263.4432444031185
2024-01-25_16:12:46.277913	265.7320649452829
2024-01-25_16:12:46.377089	268.2879145506997
2024-01-25_16:12:46.477306	261.95551105071166
2024-01-25_16:12:46.577546	261.2307178790263
2024-01-25_16:12:46.677803	263.4050973940824
2024-01-25_16:12:46.778007	263.86286150251533
2024-01-25_16:12:46.877242	261.49774694227875
2024-01-25_16:12:46.977440	263.48139141215455
2024-01-25_16:12:47.077612	261.3833059151706
2024-01-25_16:12:47.177856	260.8111007796295
2024-01-25_16:12:47.277050	261.99365805974776
2024-01-25_16:12:47.377250	262.68030422239707
2024-01-25_16:12:47.477465	262.60401020432494
2024-01-25_16:12:47.577657	261.53589395131485
2024-01-25_16:12:47.677876	262.26068712300025
2024-01-25_16:12:47.777047	262.0318050687838
2024-01-25_16:12:47.877248	262.3369811410724
2024-01-25_16:12:47.977420	263.6339794482989
2024-01-25_16:12:48.077659	261.87921703263953
2024-01-25_16:12:48.177825	261.53589395131485
2024-01-25_16:12:48.278037	262.0318050687838
2024-01-25_16:12:48.377240	261.7266289964952
2024-01-25_16:12:48.477480	261.91736404167557
2024-01-25_16:12:48.577690	264.0917435567317
2024-01-25_16:12:48.677915	270.00452995732303
2024-01-25_16:12:48.777119	271.30152826454946
2024-01-25_16:12:48.877386	261.1925708699902
2024-01-25_16:12:48.977643	263.4050973940824
2024-01-25_16:12:49.077843	262.3751281501085
2024-01-25_16:12:49.177044	261.87921703263953
2024-01-25_16:12:49.277281	272.2552034904513
2024-01-25_16:12:49.377482	262.68030422239707
2024-01-25_16:12:49.477686	262.8710392675774
2024-01-25_16:12:49.577895	263.0236273037217
2024-01-25_16:12:49.677122	262.4132751591445
2024-01-25_16:12:49.777317	269.81379491214267
2024-01-25_16:12:49.877524	261.4214529242066
2024-01-25_16:12:49.977745	261.68848198745917
2024-01-25_16:12:50.077962	260.9255418067377
2024-01-25_16:12:50.177168	262.10809908685593
2024-01-25_16:12:50.277370	261.87921703263953
2024-01-25_16:12:50.377620	273.3996137615335
2024-01-25_16:12:50.477829	260.6585127434852
2024-01-25_16:12:50.577037	262.10809908685593
2024-01-25_16:12:50.677279	261.078129842882
2024-01-25_16:12:50.777470	261.3451589061345
2024-01-25_16:12:50.877682	268.5549436139523
2024-01-25_16:12:50.977894	264.6258016832367
... 29982 more lines ...
Attachment 26: image_00140.tif
Attachment 27: image_00143.tif
  833   Wed Jan 24 08:57:25 2024 VC, IC, VK, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Commissioning 

Demmarrage machine à 8h45

IHM ThomX warm-up

8H55 Chauffage klystron, Frigo  Ampli laser

9H   Chiller  

PB    er/hf/rac.17-api.di1   et TL/PS/DPI.01

Demarrage cyclage aimants

Start of the RF cavity 500.25 MHz and 50 kV

Start of the accelerator (mode THOMX on MPS)

Loading the receipt good_20240117_17_22_41

Charge-phase scan, tuning of the RF section phase (Gun phase = 273, LIL phase = 114, Att = 1.35)

Transport to the Ring but only 1 turtn. Optimization of the injection but no big imrovement

Loading the receipt from 16/11/223

Optimization of the transport

At 11h50 the modulator interlocked . Then on the MPS there are errorrs (see photo). Need the intervention of support.

13.50 Eric came and fixed the probmlem of one of vacuum valves of the ring, that was causing interlock.

Synchro problem, Kevin repaired.

14.40. Kevin , Ronic entered the bunker to change cable on FPC.

15.10 Restart the machine. Tune of the injector (gun phase 230 and LIL phase 111, charge 72 pC ICT1). it seems that now the energy is not very stable, at TL BPM2 the SpX goes from +2 to -6 (see the screenshot attached). Injection in the ring.

Restart of the RF cavity (problem to start from the interface in the control room)

Only one turn in the ring

During the phase scan of the RF cavity (with rigol) strange bahavior of the trigger. Misstriggering (see the screenshot attached). Problem to be understood. Conclusion: to change the phase of the RF cavity better to use the phase shifter (old position 6094 and nez position 2320).

Storage is reisteblished and improved after optization of the injection : the last good receip is

recipe_recipe_LI_TL_RI_all_20240124_18_17_03.txt

The injection stability to be further investigated (see the screenshot attached)

Use of the trigger on demand. Works well. Checked the duration of beam circulating in the ring (5-10 sec on the scope).

Some tests to check the correlqtino of the energy jumps on TL BPM2 with RF cavity and pulsed elements and dipoles. It seems that there are no effect.

 

 

Attachment 1: IMG_2821.jpg
IMG_2821.jpg
Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_53_38.png
scan_charge_phase_min_0.0_max_360.0_10_53_38.png
Attachment 3: Screenshot_from_2024-01-24_15-13-14.png
Screenshot_from_2024-01-24_15-13-14.png
Attachment 4: Screenshot_from_2024-01-24_15-35-21.png
Screenshot_from_2024-01-24_15-35-21.png
Attachment 5: Screenshot_from_2024-01-24_18-15-17.png
Screenshot_from_2024-01-24_18-15-17.png
Attachment 6: Screenshot_from_2024-01-24_17-54-34.png
Screenshot_from_2024-01-24_17-54-34.png
Attachment 7: Screenshot_from_2024-01-24_17-33-47.png
Screenshot_from_2024-01-24_17-33-47.png
Attachment 8: Screenshot_from_2024-01-24_18-41-04.png
Screenshot_from_2024-01-24_18-41-04.png
Attachment 9: Screenshot_from_2024-01-24_18-43-51.png
Screenshot_from_2024-01-24_18-43-51.png
Attachment 10: Screenshot_from_2024-01-24_18-45-28.png
Screenshot_from_2024-01-24_18-45-28.png
  832   Tue Jan 23 17:23:32 2024 JNC/CB LinacLI | TL | LE run du 23/01/2024 en cours 

Iris ajusté à 1.1, image enregistrée à 17h20 dans le répertoire laserPb autorisation de tir, vanne fermée, réouverte

Chargemax à 330 degrés, on se place à 280 degrés. 

Focalisation max sur LISST à 227A, energie steerer 4.93MeV, l'énergie est un peu basse

on se met à 235A sur le soleno et on ajuste la phase pour avoir un inimum --> phase 270 degrés--> energy steerer 4.95 MeV

le faisceau est tranmis à 180A sans steerer ni sur li ni sur TL

phase section 110deg, att +1.2dB energy steerer....

.....................125deg ......+1.8..............................

on charge la recette pour l'orbite, on met le soleno à 180A

on vérifie les phases pour l'espread minimale : impossible de lancer l'IHM SST, 10 plantages de suite

270 phase canon, 120 phase section, att +1.35dB, dipole 159.3A

quad scan QP3, QP1= -1.9A, QP2 = +2.35 @180A

quad scan QP3, QP1= -1.8A, QP2 = +2 @195A

On passe du temps à aligner sur QP3 (TL/STr1V=-6A, 1H =-6A) --> quad scan 3 195A

quand scan à 185A (QP1=1.5A, QP2=-1.7A), on retrouve des scan plus cohérent

Arret 20h30

 

 

 

 

 

 

  831   Thu Jan 18 00:11:51 2024 VK,VM,IC,ND Shift summaryLI | TL | LE | Diag Operations 18/1 

9:05 Git pull

9h14: Demarrage modulateur

10h22 Client 3 does not respond; Reboot the machine

10h42 PSS Gele ...

10h46 PSS reparti

10h47 Tension modulateur 1090V  (a-t-on une nouvelle consigne?)

Scan des EP

14h18 Modulateur pb at the end of the scan. Resolu 14h30.

14h22 Intervention Philippe: Redemarrage RDP5B17. termine 14h26

 

15h Comparaison rafraichissement ER/SY/RAC.17-ELR.01-RDP.03 et ER/SY/RAC.17-ELR.01-RDP.04

 Dans jive/Device chosir le device et aller dans "event" "waveform_cha &chb" puis mettre "relative" a 0.001 pour que cela rafraichisse tres vite. (mais 1 semble aussi fonctionner) il ne faut pas mettre None

15h30 Pas de faisecau dans la EL... Ajustement du kicker d'extraction

16h18 Test du bouton "Tir unique" dans Synchro/ Phase + Freq

17h06 Comparaison TL/DG/BPM.04 et EL/DG/BPM.01

Attention il faut s' assurer que le gain des BPMs est le meme.

17h40 arret faisceau

===

Bilan de la journée:

* Tâche #12: Verification charge extraite: Fait

* Tâche #56: Scan réglage EP: Fait

* Tâche #5 Nouvel IHM SST: Testé, déployement au prochain git pull (en cours)

* Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM: Pertinence à  discuter

* Re-re-re-validation du mode tir unique

* Test et validation de l'acquisition des RDP B17

===

Tâches de la liste de priorité (par ordre de priorité):

Tâche #12: Verification charge extraite

Tâche #56: Scan réglage EP

Tâche #5 Nouvel IHM SST

Tâche #8: démarrer MRSV

Tâche #25: Ajouter graphe de l'orbite sur l'IHM BPM

Test diags LE

 

Attachment 1: health_check_2024_01_18_09_15.png
health_check_2024_01_18_09_15.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_18_10_50.png
scan_Laser_vs_RF_phase_2024_01_18_10_50.png
Attachment 3: bpm_1_vs_kicker_inj12H55.png
bpm_1_vs_kicker_inj12H55.png
Attachment 4: bpm_1_vs_septum_13h28.png
bpm_1_vs_septum_13h28.png
Attachment 5: bpm_1_vs_septum_14h16.png
bpm_1_vs_septum_14h16.png
Attachment 6: bpm_0_vs_septum_14h16.png
bpm_0_vs_septum_14h16.png
Attachment 7: bpm_0_vs_ext_kicker_second_16h41.png
bpm_0_vs_ext_kicker_second_16h41.png
Attachment 8: bpm_0_vs_ext_kicker_second_16h53.png
bpm_0_vs_ext_kicker_second_16h53.png
Attachment 9: bpm_0_vs_ext_kicker_second_16h59.png
bpm_0_vs_ext_kicker_second_16h59.png
Attachment 10: Screenshot_from_2024-01-18_17-06-02.png
Screenshot_from_2024-01-18_17-06-02.png
  830   Wed Jan 17 08:55:07 2024 VC-KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 

8H50

Demarrage chauffage, chiller, et cyclage aimants

TL/PS/DPI.01 en défaut resolu par un reset sur l'ATK pannel

 

les redpitaya étaient parametrées en defaut (comme s'il y avait eu une coupure de courant entre hier et aujourd'hui)

les waveform de la er\sy\rac.17-elr.01\RDP.03 (redpitaya 3 baie 17) sont toujours acquisent plus lentement que les autres (alors que le event ID compte comme les autres RDP vérifiers sur 1000 events ID dans ATK pannel)

alingnement laser sur PC avec courant d'oscurité

alignement du triplet linac

TL\DG\SST.02 en disfonctionne (caméra ok mais pas de faisceau sur le YAG on voit bien la mire)

alignement des quad sur la TL

Arret et redemarage des serveurs TL\DG\SST.02\CCD.01 dans ASTOR

le reglage du dipole et phase et att section

dipole 159.3

phase lil 107

Att lil 1.31dB

position centre faisceau sur TL\BPM2 X 4mm Y 0mm

redemarrage modulateur 13h30     1090V

charge faiceau

LI/DG/ICT.01 103pC

TL/DG/ICT.01 108pC

TL/DG/ICT.02 110pC

 

EP alumés manuellement  (reset en local )

Ri-c1/dg/BMP.05-LIB04 pas de signal (TbT ne fonctionne pas) serveur redemarré OK

quelques tour dans l'anneau (sans cavité RF)

on bouge delay kicker d'extraction de -7.97µs à -7.10µs

V kicker 6600 V => faisceau au milieu du BPM LE

sur IHM retards synchro : il faut pouvoir piloter les retards avec une précision d'une ns au moins pour les kickers

PB led allumées sur DG\EL\SST.01 

pB résolu par Nicolas et Kevin les leds EL sst.0.1 est sur le powerswitch

fisceau sur l'ecran yag ... non optimisé

RECETTE pour aller dans la LE en passant par l'anneau sauvé sous : good_20240117_17_22_41 avec Kicker d'extraction à 6150V (à ajouter dans la recette)

voir image. Il reste à optimiser le faisceau (ligne horizontal actuellement).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: 2024-01-17_11_50_48_tl_dg_sst_02-ccd_01_RAW.png
2024-01-17_11_50_48_tl_dg_sst_02-ccd_01_RAW.png
Attachment 2: 2024-01-17_11_49_00_li_dg_sst_01-ccd_01_RAW.png
2024-01-17_11_49_00_li_dg_sst_01-ccd_01_RAW.png
Attachment 3: 2024-01-17_11_48_11_tl_dg_sst_01-ccd_01_RAW.png
2024-01-17_11_48_11_tl_dg_sst_01-ccd_01_RAW.png
Attachment 4: 2024-01-17_11_47_40_tl_dg_sst_03-ccd_01_RAW.png
2024-01-17_11_47_40_tl_dg_sst_03-ccd_01_RAW.png
Attachment 5: 2024-01-17_15_11_47_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
2024-01-17_15_11_47_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Attachment 6: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
2024-01-17_17_23_30_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Attachment 7: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_RAW.png
2024-01-17_17_23_30_el_dg_sst_01-ccd_01_RAW.png
Attachment 8: EL_BPM_after_ring.png
EL_BPM_after_ring.png
Attachment 9: Storage_ring.png
Storage_ring.png
Attachment 10: StorageRingExtraction.png
StorageRingExtraction.png
  829   Tue Jan 16 09:00:27 2024 MJ et SC Shift summaryLinac Commissionning   

9h Mise en chauffe modulateur et refroidissements

Démarrage ampli laser

9h07 fermeture casemate

faisceau sur yag

bpmLI1 sature (screenshot) + mesure charge marche pas - Intervention nicolas et vincent :

Mesure de charge ictLI remarche decalage du linac trigger laser gun de -8 us à -8.20 us en retard

bpmLI1 redevenu OK

charge 100 pC (attenuateur laser 310)

-50 pour phase pour energie max - soleno 210 -  phase canon 316 

steerer LI ne s'allument pas (appel Jean noel ) - probleme regle par JN

mesure energie : 5.2 MeV

passage section --> faisceau sur yagtl1 

mesure energie section  :

53 MeV    pour 1.75 db phase 110 

50.7 MeV  pour 2 db phase 110

ictTL01 MARCHE PAS (screenshot) --> demande a Nicolas

Dipole on : 159.3 

faisceau sur bpmTL2 (screenshot) - RIEN sur YAGTL2 impossible de visualiser ni faisceau ni courant obscurite --> appel Nicolas

Plus aucune camera ne peut etre mises sur ON - Comme il n' y a personne pour m'aider j'essaye "restart all camera server " - YagTL1 refonctionne apres ca -

mais YAGTL2 ne marche toujours pas, ni ictTL01 (ni sans doute ictTL2 ni yagtl03) - signaux RF ne sont plus visibles sur RF_plot (alors qu'il y a du faisceau)

donc : FIN de shift

Bon finalement on essaye de continuer quand meme ...

On a reussi a avoir du signal sur BPMTL4 en mettant l'attenuateur section a 1.6. Au dessus pas de signal dans BPMTL4 (voir screenshot)

Remesure d'energie a 1.6 attenuateur section : 52.5 MeV (Au debut de shift on avait 50.7 MeV pour 2 db)

Incomprehensible :  pourquoi le faisceau passe dans la TL a 1.6 db et PAS a 2 db

Bilan : pas de faisceau sur TL/DG/SST.02 apres dipole

 

 

Attachment 1: 2024-01-16_10-49-54_yag_bpm_LI.png
2024-01-16_10-49-54_yag_bpm_LI.png
Attachment 2: 2024-01-16_13-25-52_charges.png
2024-01-16_13-25-52_charges.png
Attachment 3: 2024-01-16_13-28-26_bpmTL2.png
2024-01-16_13-28-26_bpmTL2.png
Attachment 4: 2024-01-16_14-37-22-TLbpm.png
2024-01-16_14-37-22-TLbpm.png
  828   Mon Jan 15 10:41:48 2024 Entered by Viktor Soskov from 134.158.195.153 on Mon Jan 15 10:41:24 2024FixedInfoLinac Commissionning Laser status 

Bonjour,

l'état actuel du laser: on a passé le width du Pockels de 1330 à 1550 ns.

On a Eir=1.4mJ; Euv=56µJ sur la cathode, la position de atténuateur - 420.

Viktor

  827   Thu Jan 11 14:47:37 2024 NDFixedInfoDiag Redémarrage diags + synchro 

Pour la synchro, les generateurs de retard ont ete redemarres.

Pour les diags: redemarrage de icePapControllerB6 et Wavecatchers.

Signal OK (sans faisceau) sur BPM, ICT et sur ecrans.

 

Attachment 1: health_check_Diag_2024_01_11_14_54.png
health_check_Diag_2024_01_11_14_54.png
Attachment 2: health_check_2024_01_11_14_55.png
health_check_2024_01_11_14_55.png
  826   Wed Dec 13 11:20:19 2023 Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 InfoLI | SY Changement fréquence linac 

Suite à une demande de Jean-Noël, la fréquence linac a été changé.

Nous sommes maintenant à la fréquence nominale + 500Hz: 2998.550500MHz.

La fréquence anneau est inchangée.

 

  825   Tue Dec 12 12:48:58 2023 Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 InfoSY Changement de frequence linac 

Suite discussion avec Jean-Boel et Vincent, la frequence linac a ete remise a 2998550000Hz (nominal).

La frequence anneau est inchangee a 500.250000 MHz

Les frequences peuvent etre verifiee dans PlateformIHM / Synchro / Synthetiser status

 

Attachment 1: Screenshot_from_2023-12-12_12-57-04.png
Screenshot_from_2023-12-12_12-57-04.png
  824   Mon Dec 11 09:41:41 2023 VC,ND Shift summarySY Tests synchro 

8H15 démarrage chiller et modulateur

Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76

Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.

On voit régulièrement des arrêts de 8 secondes (ou 16 secondes) dans les données envoyées par la RDP.

16h36: Arrêt

  823   Thu Dec 7 14:46:29 2023 VC, ND Shift summarySY Tests synchro 

Objectif: Test nouveau code CPLD

14:44 Mise en chauffe modulateur

Le code semble fonctionner => tests avec modulateur

15:44 Trig

De nombreux coups manqués. Il va falloir augmenter la largeur des portes echantillonant le 33MHz et le 41MHz. Le nombre de coups manqué est le même à 500,250MHz et à 500.002MHz.

16:50 arrêt

  822   Thu Nov 23 08:51:44 2023 SC/KD AnneauLI | TL | LE | Ring Faisceau LE 

8h50 Mise en chauffe modulateur

Mise en route chillers et frigo

Problème laser photocathode : en cours d'investigation par Kevin et Viktor

10h Résolution problème laser nécessaire, arret modulateur, chillers et frigo

 

  821   Tue Nov 21 14:29:01 2023 Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 Shift summaryDiag Prise de donnees 21/11 

13:57 Mise en chauffe

15:00 Faisecau

Tests sur les ecrans

17:00 Arret