  873   Mon Jun 3 08:38:52 2024 MJ EK, KD, ICUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section 03 juin 8H15 : Mise en chauffe modulateur 

start frigo et chiller section 

3 microsec 5 Hz attenu 6 dB (PIS
 13x 
  875   Wed Jun 5 09:49:26 2024 MJ MK HG WKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section - On augmente l'attenuation pour démarrer
(7 dB)
- 2 µs @ 10 Hz
 3us_10Hz_30dB_breakdown_SF6_OK.png3us_10Hz_30dB_breakdown_etrange_SF6_OK.png3us_10Hz_30dB_normal_condition_SF6_OK.png0_2us_10Hz_0_2dB_SF6_OK.png0_5us_10Hz_0_2dB_SF6_OK_vide.png 
  899   Thu Aug 8 10:12:35 2024 Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 LinacLI | RF D1 conditionnement section Remplissage SF6 de 2.3 bar à 2.5
bar par Christopher

10h08 : augmentation progressive
  
  900   Fri Aug 9 10:01:23 2024 Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024 LinacLI | RF D1 conditionnement section Vide de démarrage apres l'allumage
des chillers : in section 6.4e-10 et out
section 8.3e-10
  
  895   Thu Aug 1 08:43:29 2024 Iryna, Sophie, Viktor, Slava Shift summaryLinac Commissionning conditionnement de la section RF@ 3µs & 25 Hz  8h40 Warm-up the modulator

***
reprise de conditionnement @ 3µs
 14x 
  830   Wed Jan 17 08:55:07 2024 VC-KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 8H50

Demarrage chauffage, chiller, et
cyclage aimants
 10x 
  834   Thu Jan 25 08:49:29 2024 VC DN ND, IC, VM, KD, AS RC , VK...Under ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 8h45 demarrage chauffage Modulateur et
frigo

Pb sur le serveur li/opt.02-las.01-asp.01
 27x 
  836   Wed Jan 31 14:12:25 2024 RC VC MJ Under ProcessOtherRing Commissioning commitionning Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par
 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png 
  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 8h10 rémarrage machine chauffage
klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y 
  
  842   Tue Feb 6 08:52:28 2024 VC MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissionning 8h45 demarrage machine

modulateur frigo ampli laser chiller
et cyclage des aimants
 7x 
  843   Tue Feb 6 20:21:38 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissioning 14h - Mesures SPR radiations accelerateur

Beam shutter securite ne
remonte plus --> Mesure SPR X-hutch
  
  419   Fri Mar 25 08:22:18 2022 VC SC HG NDUnder ProcessLinacDiag | Linac Commissionning commisionning Charge et OTR  demarrage Modulateur 8h20

9h15 temp chiller ok

energie laser 32uJ atténuateur
 12x 
  878   Mon Jun 10 13:36:25 2024 KD, CJ, WE, GO, VC, NDUnder ProcessShift summaryLinac Commissionning claquage et test micros 9h: accès sous-sol

12h: démarrage modulateur
pour test micro (atténuateur à
 11x 
  879   Tue Jun 11 08:44:30 2024 M EK, NDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning claquage et test micros 8:30 impossible de mettre en chauffe modulateur

Pompe ThomX HS

Dalkia a été contacté
 6x 
  378   Tue Mar 1 11:53:20 2022 CB/JNC ProblemCC | Linac Commissionning charge phase Image laser sauvée à 11h50,
dimension rms 80 pixel en vertical et 94
en horizontal, position du laser : 934.34
 Screenshot_from_2022-03-01_18-05-55.png 
  1065   Tue May 6 11:38:24 2025 VS, AG, KDNew SolutionInfoLI | Laser | Opt | Linac Commissionning changement PhotoCathode icon4.gif lundi 5 mai : remise à
l'air et démontage de l'ancienne
cathode (Cu)
 6x 
  524   Wed Aug 3 11:30:54 2022 AM/SC/CB/JNC FixDiag | Linac Commissionning camera TL/SST2 + fente Intervention camera

Position YAG -64 mm, se mettre
en internal trigger manuellement sur jive
  
  610   Wed Oct 26 14:56:33 2022 Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:56:19 2022 UrgentLinac Commissionning camera SST2 HS ? Parametres de recipe_recipe_LI_TL_RI_20221014_16_44_34.txt
mais avec Idipole=144 au lieu de
156.7 ...... (je ne comprends pas
 Screenshot_from_2022-10-26_15-02-44.png 
  83   Fri Oct 1 15:40:37 2021 Entered by Christelle Bruni from 82.64.20.144 on Fri Oct 1 15:40:21 2021FixedLinacLinac Commissionning bilan du premier octobre 2021 Bilan

-
  
  50   Fri Jul 9 14:48:03 2021 Entered by Christelle Bruni from 82.64.20.144 on Fri Jul 9 14:47:39 2021FixedShift summaryLinac Commissionning bilan du 9 juillet 2021 -Canon

-Ajustement avec
la cathode aluminium fait

-Possibilité
  