  873   Mon Jun 3 08:38:52 2024 MJ EK, KD, ICUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section 03 juin 

8H15 : Mise en chauffe modulateur 

start frigo et chiller section 

3 microsec 5 Hz attenu 6 dB (PIS 6.5 MW)

09h55 interlock klystron a 4 dB

10h13 interlock klystron  a 4 dB

10h21 att a 10 db pour voir si ca interlock (avant atten)

10h27 interlock klystron a 4 dB(image jointe) plusieurs claquages

10h21 att a 15 dB pour voir si ca interlock (avant atten)==> claquage réseau 

11h40 12 dB 3 us et 5 Hz => claquage hors section 

20 dB 3 us et 5 Hz==> claquage hors section 

12h00: 20 dB 2µs et 5 Hz ==> 13h00: claquage

13h52 : att. section 30 dB 3µs et 10Hz ==> claquage legere deformation incident klystron à la fin de l'impulsion ( voir image reflechi Klystron orange )

14h45: 30dB 3µs 10Hz reflechi Klystron (orange) voir image

14:57 : alim Klystron  1190 V (Pik =31 MW)  , att. 30dB 3µs & 10Hz ==> reflechi klystron (orange) voir image

14:59 : alim Klystron 1150 V(Pik=26 MW), att. 30dB 3µs & 10Hz==> claquage @15h08 voir image

15:16 : alim Klystron 1220 V  (Pik=35 MW) att. 30 dB 3µs & 10Hz ==> claquage fréquent voir image

15h37 : alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> baisse proressive attenuation section

NB: chaine reflechi Klystron ( couplage 60 dB +atténuateur 30 dB +splitter 3 dB +filtre passe bas 0.4 dB ) signal mesuré trés atténué

16h05 : alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 2 dB ==>claquage reflechi Klystron

16h23 : alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 1 dB ==>claquage reflechi Klystron (la courbe incident section est l'image du réfléchis Klystron, cf image)

16h45 : alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 0.8 dB

17h30 : alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 1 dB ==>claquage reflechi Klystron (la courbe incident section est l'image du réfléchis Klystron, cf image)

17h45: alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 0.8 dB

17h59: alim Klystron 1100 V ( Pik=20 MW)  10 Hz & 3µs ==> attenuation section 0.5 dB (13MW) ==> premier claquage à 18h01 (3min)

* il y a des sur-intensité sur le PiK (d'où viennent t'elles ?)

* il y a des fois des interlocks sans qu'il y ai un réfléchis de visible sur l'oscilloscope (ou des signaux déformés)

* sauvegarde de la courbe sur l'effet du conditionnement à 0.5dB, on voit que la tension tient de plus en plus longtemps (cf. screenshot)

18h25 : on descend doucement à 0.2dB (14MW) ==> ça calque pas mal (effet du conditionnement en P.J. ==> cela semble conditionner)

19h44 : on passe le moduleur à pleine puissance pour une puissance égale à 0.5dB dans la section (13MW ==> 2.4dB, ~-68.6mV sur le scope)

après quelques claquage dans le réseau (absorption du réfléchi avant effet sur l'incident section, cf. scope), ça semble tenir plusieurs minute et en s'améliorant.

20h17 : arrêt machine

 

** methode mesure "effet conditionnement" **

- ne rien toucher à un point de fonctionnement

- lors d'un interlock relancer le trig (en insistant si besoin), sans changer l'atténuation

-- au début il est difficile de remettre la tension mais plus le temps passe plus la tension se remet facilement et rapidement --

Attachment 1: reflechiKlystron_RFnetwork_10Hz_30dB_3us.png
reflechiKlystron_RFnetwork_10Hz_30dB_3us.png
Attachment 2: reflechiKlystron_RFnetwork_10Hz_30dB_3us_1190V.png
reflechiKlystron_RFnetwork_10Hz_30dB_3us_1190V.png
Attachment 3: reflechiKlystron_RFnetwork_10Hz_30dB_3us_1150V.png
reflechiKlystron_RFnetwork_10Hz_30dB_3us_1150V.png
Attachment 4: ref_klystron___Pik_35_MW_att_section_30_dB_3µs_10Hz_.png
ref_klystron___Pik_35_MW_att_section_30_dB_3µs_10Hz_.png
Attachment 5: 3us_10Hz_1dB_1100V.png
3us_10Hz_1dB_1100V.png
Attachment 6: reflechiKlystron_RFnetwork_10Hz_1dB_3us_1100V.png
reflechiKlystron_RFnetwork_10Hz_1dB_3us_1100V.png
Attachment 7: reflechiKlystron_RFnetwork_10Hz_1dB_3us_1100V._2png
Attachment 8: reflechiKlystron_RFnetwork_10Hz_1dB_3us_1100V_3.png
reflechiKlystron_RFnetwork_10Hz_1dB_3us_1100V_3.png
Attachment 9: interlock_sans_problem.png
interlock_sans_problem.png
Attachment 10: interlock_sur_intensite.png
interlock_sur_intensite.png
Attachment 11: effet_conditionnemet_0_5dB_10Hz_3us_1100V.png
effet_conditionnemet_0_5dB_10Hz_3us_1100V.png
Attachment 12: interlock_reseau.png
interlock_reseau.png
Attachment 13: effet_conditionnemet_2.4dB_10Hz_3us_1220V.png
effet_conditionnemet_2.4dB_10Hz_3us_1220V.png
  875   Wed Jun 5 09:49:26 2024 MJ MK HG WKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section 

- On augmente l'attenuation pour démarrer (7 dB)
- 2 µs @ 10 Hz
- 2 dB : Claquage
- 1.75 dB : vide OK
- 1.5 dB : vide augmente
- 1.2 dB : claquage
- 11h30 : déphaseur 360 -> 0

Des screenshots de claquage sont enregistres dans datashared a 2 µs @ 10 Hz, pour les 2 config suivantes
- Attenuateur a autour de 2 db (la puissance passe par tout le reseau + section)
- Attenuateur a 25 db (la puissance ne va que jusqu'a lattenuateur)

 

Etude avec Walid - seuils des interlocks persistants

0.5 µs @ 1   Hz   --> 0.4 db 
0.5 µs @ 5   Hz   --> 0.55 db            
0.5 µs @ 10 Hz --> 0.55 db            
1    µs @ 1   Hz   --> 1  db  ou 0.5 db
1    µs @ 5   Hz --> 1 db   ou 1.15
1   µs @ 10  Hz --> 0.4 ou 1.1 db
2  µs @ 1 Hz --> 1.2 ou 2.2 db
2  µs @ 5 Hz --> 1.7
2  µs @ 10 Hz --> 2.2 ou 1.2 db
3  µs @ 1 Hz --> 1.4
3  µs @ 5 Hz --> 2.6 ou 1.9
3  µs @ 10 Hz --> 2.2

13h44 verification pression sf6 : le SF6 EST a moins de 2 bar (1.8 bar) --> STOP  conditionnement tant que la pression n'est pas revenue a 2.5 bar

15h30 : pression remise à 2.6bar (lecture manomètre) avec le SF6 de PHIL ==> il faut traiter la fuite

16h : reprise 0.5us, 10Hz, 30dB. Ca tiens, pas de claquage

16h05: on élargi progressivement à 3us. : 1 petit claquage au passage, l'onde semble déformé pour le PIK (cf. figures)

claquages : 16h06, 16h08, 16h08:45, 16h09, 16h09:30, 16h09:40, 16h10:33, 16h11:20, 16h11:53, 16h12, 16h13:50, 16h14, 16h14:54, 16h15:33, 16h15:50, 16h16, 16h16:20, 16h17:25

16h18 : on change l'atténuation pour voir les zones de claquage

0.5us, 10Hz, 0.9dB, premier gros claquage, on recommence en partant de 1.9dB, quelques claquage à 0.4dB, mais pas très méchants,

16h25 : on arrive à 0.2dB on laisse voir le longterme (claquage au bout de quelques minutes 16h27), ça claque, mais ça semble venir de la section (visible sur le vide également), difficile à dire, ca tiens de l'ordre de la minute

16h38 : on passe à 1us, 1.1dB ça tiens pas trop mal (plusieurs minutes),

0.5dB ca tiens 30s, puis 1min

16h52 : on passe à 0.2dB, ça tiens et on reccupère le vide (à 0.5dB il doit y avoir un point à travailler), gros claquage après quelques 10aines de secondes (~30s),

on ressaye, 1us, 0.2dB, 10Hz (ca tiens plusieurs minutes)

17h: on passe à 2us, 1.1dB ça tiens plusieurs minutes

à 3us, 10Hz, claquage à ~ 1.5dB

17h45 : On essaye de voir le réseau, max d'atténuation : 16dB (attention à la calibration de l'atténuateur !) 

claquage toutes les 30s - 1min  pour Klystron à 1220V et 1200V

Claquage en bout de courbe, dans les 500ns dernière

18h07: arrêt machine

 

 

 

 

 

 

 

Attachment 1: 3us_10Hz_30dB_breakdown_SF6_OK.png
3us_10Hz_30dB_breakdown_SF6_OK.png
Attachment 2: 3us_10Hz_30dB_breakdown_etrange_SF6_OK.png
3us_10Hz_30dB_breakdown_etrange_SF6_OK.png
Attachment 3: 3us_10Hz_30dB_normal_condition_SF6_OK.png
3us_10Hz_30dB_normal_condition_SF6_OK.png
Attachment 4: 0_2us_10Hz_0_2dB_SF6_OK.png
0_2us_10Hz_0_2dB_SF6_OK.png
Attachment 5: 0_5us_10Hz_0_2dB_SF6_OK_vide.png
0_5us_10Hz_0_2dB_SF6_OK_vide.png
  899   Thu Aug 8 10:12:35 2024 Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 LinacLI | RF D1 conditionnement section 

Remplissage SF6 de 2.3 bar à 2.5 bar par Christopher

10h08 : augmentation progressive de la HT

10h13 : Att sec 10 dB

On descend progressivement jusqu'à 1dB

10h25 Att sec 1 dB

10h26 Att sec 0.9 dB vide in section = 6.9e-9   vide out section = 1.3e-9

10h30 Att sec 0.8 dB vide in section =  7.4e-9 vide out section = 2.5e-9

10h34 Att sec 0.7 dB vide in section = 7.6e-9  vide out section = 3.7e-9

10h38 Att sec 0.6 dB vide in section =  7.5e-9 vide out section = 4.3e-9

10h42 Att sec 0.5 dB vide in section =  7.1e-9 vide out section = 4.5e-9

10h46 Att sec 0.4 dB vide in section =  6.7e-9 vide out section = 4.6e-9

10h55 Att sec 0.3 dB vide in section =  5.6e-9 vide out section = 6.2e-9

13h58 Att sec 0.2 dB  vide in section =  4.9e-9 vide out section = 5.5e-9

14h20 Intervention LE dans la casemate

15h25 FIn d'intervention, reprise conditionnement

18h fin

 

 

  900   Fri Aug 9 10:01:23 2024 Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024 LinacLI | RF D1 conditionnement section 

Vide de démarrage apres l'allumage des chillers : in section 6.4e-10 et out section 8.3e-10

10h passage de 10dB à 1dB progressivement et en douceur

10h54 passage à 0.3 dB

17h fin

 

  895   Thu Aug 1 08:43:29 2024 Iryna, Sophie, Viktor, Slava Shift summaryLinac Commissionning conditionnement de la section RF@ 3µs & 25 Hz  

8h40 Warm-up the modulator

*** reprise de conditionnement @ 3µs & 25 Hz

9h43 Trig modulator

9h50 Problème avec la température du chiller qui n'est pas à la consigne, retour en standby modulateur, on/off chiller pour essayer de relancer

10h23 HT = 1215V, att = 10dB, 25Hz, pic de vide

10h31 : att. sec 9dB, légère augmentation du vide

10h40 : att.sec 8 dB ==> vide in section 4 10-9 mbar & vide out section 1.3 10-9 mbar

10h42 : att.sec 7 dB ==> vide in section  4.9 10-9 mbar & vide out section 1.3 10-9 mbar

10h44 : att.sec 6 dB ==> vide in section  6 10-9 mbar & vide out section 1.3 10-9 mbar

10h47 : att.sec 5 dB ==> vide in section 7 10-9 mbar & vide out section 1.4 10-9 mbar

10h50 : att.sec 4 dB ==> vide in section 7.5 10-9 mbar & vide out section 1.4 10-9 mbar

10h54 : att.sec 3 dB ==> vide in section 7.8 10-9 mbar & vide out section 1.6 10-9 mbar

11h01 : att.sec 2 dB ==> vide in section 7.7 10-9 mbar & vide out section 1.6 10-9 mbar

11h08 : att.sec 1 dB (Pis = 19.6 MW) ==> vide in section  8.6 10-9 mbar & vide out section 2.6 10-9 mbar

11h15 : Interlock

11h16 : retour à 5 dB

11h20 : att sec 1dB ==> vide in section  9 10-9 mbar & vide out section 3 10-9 mbar

11h34 : att.sec 0.9 dB (Pis = 20 MW) ==> vide in section 1.1 10-8 mbar & vide out section 7.1 10-9 mbar

11h46 : att.sec 0.8 dB (Pis = 20.6 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1 10-8 mbar

12h00 : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.1 10-8 mbar

12h15 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

12h19 : Interlock

12h23 HT = 1115V, att = 6.6dB, 25Hz,

12h27 HT = 1215V, att = 6.6dB, 25Hz

12h34 HT = 1215V, att = 0.7dB, Interlock

12h36 HT = 1115V, att = 5.7dB,

12h40 HT = 1215V, att = 1.7dB,

12h41 HT = 1215V, att = 0.7dB,

12h44 : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.0 10-8 mbar

12h55 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

13h02 : Interlock

13h05 HT = 1115V, att = 0.6dB

13h07 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.0 10-8 mbar & vide out section 1.1 10-8 mbar

13h10 : Interlock

13h12 HT = 1175V, att = 0.6dB

13h15 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.4 10-8 mbar

13h22 : Interlock

13h23 HT = 1175V, att = 0.6dB

13h25 : HT = 1275V, att = 0.6dB Interlock

13h26 HT = 1175V, att = 0.6dB

13h27 HT = 1215V, att = 0.6dB

13h28 : Interlock

13h30 HT = 1175V, att = 0.6dB

13h32 HT = 1215V, att = 0.6dB

13h34 : Interlock

13h44 : Interlock (Klystron)

13h50 : HV Standby (Chck SF6 2.5Bar)

13h58 HT = 1175V, att = 0.6dB

14h00 : Interlock

14h04 HT = 1215V, att = 0.6dB

14h06 : Interlock

14h12 HT = 1215V, att = 3.6dB

14h18 HT = 1215V, att = 1 dB

14h22 HT = 1215V, att = 0.9 dB

14h25 HT = 1215V, att = 0.8 dB (Pis=20.6 MW) ==> Vide démarre :  in section à 1 10-8 mbar & vide out section 9.4 10-9  mbar

14h35 HT = 1215V, att = 0.7 dB ->0.6 dB  ==> Vide démarre :  in section à 1.1 10-8 mbar & vide out section 1.2-1.3 10-8 mbar

15h00 HT = 1215V, att = 0.5 dB  ==> Vide démarre :  in section à 1.1 10-8 mbar & vide out section 1.4 10-8 mbar

15h50 HT = 1215V, att = 0.5 dB 2 Breakdowns RF structure (screenshots)

15h59 : Interlock

16h05 HT = 1215V, att = 0.4 dB  ==> Vide démarre :  in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar

16h10 HT = 1215V, att = 0.4 dB  Breakdown klysron (screenshot)

16h20 HT = 1215V, att = 0.3 dB  ==> Vide démarre :  in section à 9.6 10-9 mbar & vide out section 1.3-1.4 10-8 mbar

16h22 : Interlock

16h36 HT = 1215V, att = 0.3 dB 1 Breakdown RF structure (screenshot)

16h38 : 1 Interlock

16h40 HT = 1215V, att = 0.2 dB ==> Vide démarre :  in section à 9.3 10-9 mbar & vide out section 1.2-1.3 10-8 mbar

16h44 : 1 Interlock

16h51 : 1 Interlock

16h54 HT = 1215V, att = 0.2 dB  Breakdown klysron (screenshot)

17h00 HT = 1215V, att = 0.1 dB ==> Vide démarre :  in section à 8 10-9 mbar & vide out section 1.1 10-8 mbar

17h07 HT = 1215V, att = 0.1 dB 1 Breakdown RF structure (screenshot)

17h08 : 2 Interlock

17h12 : 1 Interlock

17h14 HT = 1215V, att = 0.1 dB 1 Breakdown RF structure

Vide  :  in section à 5.9 10-9 mbar & vide out section 9.5 10-8 mbar

17h18 : Stop of the shift

 

 

Attachment 1: Screenshot_from_2024-08-01_14-38-53.png
Screenshot_from_2024-08-01_14-38-53.png
Attachment 2: breakdown_0.5dB_25Hz_3us_15h49.png
breakdown_0.5dB_25Hz_3us_15h49.png
Attachment 3: vide_15h49_25Hz_3us_0.5dB.png
vide_15h49_25Hz_3us_0.5dB.png
Attachment 4: breakdown_0.5dB_25Hz_3us_15h55.png
breakdown_0.5dB_25Hz_3us_15h55.png
Attachment 5: vide_15h55_3us_25Hz_0.5dB.png
vide_15h55_3us_25Hz_0.5dB.png
Attachment 6: breakdown_0.4dB_25Hz_3us_16h10.png
breakdown_0.4dB_25Hz_3us_16h10.png
Attachment 7: vide_16h10_3us_25Hz_0.4dB.png
vide_16h10_3us_25Hz_0.4dB.png
Attachment 8: breakdown_0.3dB_25Hz_3us_16h36.png
breakdown_0.3dB_25Hz_3us_16h36.png
Attachment 9: vide_16h36_3us_25Hz_0.3dB.png
vide_16h36_3us_25Hz_0.3dB.png
Attachment 10: breakdown_0.2dB_25Hz_3us_16h54.png
breakdown_0.2dB_25Hz_3us_16h54.png
Attachment 11: vide_16h54_3us_25Hz_0.2dB.png
vide_16h54_3us_25Hz_0.2dB.png
Attachment 12: breakdown_0.1dB_25Hz_3us_17h07.png
breakdown_0.1dB_25Hz_3us_17h07.png
Attachment 13: vide_17h08_3us_25Hz_0.1dB.png
vide_17h08_3us_25Hz_0.1dB.png
Attachment 14: vide_17h15_3us_25Hz_0.1dB.png
vide_17h15_3us_25Hz_0.1dB.png
  830   Wed Jan 17 08:55:07 2024 VC-KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 

8H50

Demarrage chauffage, chiller, et cyclage aimants

TL/PS/DPI.01 en défaut resolu par un reset sur l'ATK pannel

 

les redpitaya étaient parametrées en defaut (comme s'il y avait eu une coupure de courant entre hier et aujourd'hui)

les waveform de la er\sy\rac.17-elr.01\RDP.03 (redpitaya 3 baie 17) sont toujours acquisent plus lentement que les autres (alors que le event ID compte comme les autres RDP vérifiers sur 1000 events ID dans ATK pannel)

alingnement laser sur PC avec courant d'oscurité

alignement du triplet linac

TL\DG\SST.02 en disfonctionne (caméra ok mais pas de faisceau sur le YAG on voit bien la mire)

alignement des quad sur la TL

Arret et redemarage des serveurs TL\DG\SST.02\CCD.01 dans ASTOR

le reglage du dipole et phase et att section

dipole 159.3

phase lil 107

Att lil 1.31dB

position centre faisceau sur TL\BPM2 X 4mm Y 0mm

redemarrage modulateur 13h30     1090V

charge faiceau

LI/DG/ICT.01 103pC

TL/DG/ICT.01 108pC

TL/DG/ICT.02 110pC

 

EP alumés manuellement  (reset en local )

Ri-c1/dg/BMP.05-LIB04 pas de signal (TbT ne fonctionne pas) serveur redemarré OK

quelques tour dans l'anneau (sans cavité RF)

on bouge delay kicker d'extraction de -7.97µs à -7.10µs

V kicker 6600 V => faisceau au milieu du BPM LE

sur IHM retards synchro : il faut pouvoir piloter les retards avec une précision d'une ns au moins pour les kickers

PB led allumées sur DG\EL\SST.01 

pB résolu par Nicolas et Kevin les leds EL sst.0.1 est sur le powerswitch

fisceau sur l'ecran yag ... non optimisé

RECETTE pour aller dans la LE en passant par l'anneau sauvé sous : good_20240117_17_22_41 avec Kicker d'extraction à 6150V (à ajouter dans la recette)

voir image. Il reste à optimiser le faisceau (ligne horizontal actuellement).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: 2024-01-17_11_50_48_tl_dg_sst_02-ccd_01_RAW.png
2024-01-17_11_50_48_tl_dg_sst_02-ccd_01_RAW.png
Attachment 2: 2024-01-17_11_49_00_li_dg_sst_01-ccd_01_RAW.png
2024-01-17_11_49_00_li_dg_sst_01-ccd_01_RAW.png
Attachment 3: 2024-01-17_11_48_11_tl_dg_sst_01-ccd_01_RAW.png
2024-01-17_11_48_11_tl_dg_sst_01-ccd_01_RAW.png
Attachment 4: 2024-01-17_11_47_40_tl_dg_sst_03-ccd_01_RAW.png
2024-01-17_11_47_40_tl_dg_sst_03-ccd_01_RAW.png
Attachment 5: 2024-01-17_15_11_47_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
2024-01-17_15_11_47_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Attachment 6: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
2024-01-17_17_23_30_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Attachment 7: 2024-01-17_17_23_30_el_dg_sst_01-ccd_01_RAW.png
2024-01-17_17_23_30_el_dg_sst_01-ccd_01_RAW.png
Attachment 8: EL_BPM_after_ring.png
EL_BPM_after_ring.png
Attachment 9: Storage_ring.png
Storage_ring.png
Attachment 10: StorageRingExtraction.png
StorageRingExtraction.png
  834   Thu Jan 25 08:49:29 2024 VC DN ND, IC, VM, KD, AS RC , VK...Under ProcessShift summaryLinac Commissionning | Ring Commissioning commitionning 

8h45 demarrage chauffage Modulateur et frigo

Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible  (pc laser demarré par Kevin)

8h50 demarrage chiller et cycling magnet   => OK

9h13 demarrage ampli laser PC

9h30 Git pull

10h20 Demarrage faisceau

10h27 Recette chargee: all_20240124_18_17_03

10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge

Phase RF section 126

10h53 Etude de l'influence de la phase laser sur la phase RF.

10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0

10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000

11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000

11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000

11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000

11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000

11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000

Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...

11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.

11h32 phase anneau initiale 2320, new phase: 4500

Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved.  The new receipt is

recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt

For this receipt the x- beam position @TL BPM2 should be 0 mm.

During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.

The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)

Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%

The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)

 

Plein de choses a ecrire... Acces PERLE, des rayons X,...

Une dizaine de personnes en SdC.

 

15h30 scan en temps du kicker d 'extraction.

Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.

Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).

Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.

Suggestion de retard pour le kicker d 'extraction: -8.310us

Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.

Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)

** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé

** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.

** image prise du centre du faisceau

** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)

** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)

Paramètre synchro CFP/Anneau :

* delai trig/cfp (19.4ns),

* dephaseur 500MHz (7.2V),

* setpoint cavité CFP (0V) sur pente négative,

* phase rigol (0° voie1, 204° voie2).

Attachment 1: health_check_2024_01_25_10_20.png
health_check_2024_01_25_10_20.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_25_10_24.png
scan_Laser_vs_RF_phase_2024_01_25_10_24.png
Attachment 3: scan_Laser_vs_RF_phase_2024_01_25_10_55.png
scan_Laser_vs_RF_phase_2024_01_25_10_55.png
Attachment 4: scan_Laser_vs_RF_phase_2024_01_25_10_58.png
scan_Laser_vs_RF_phase_2024_01_25_10_58.png
Attachment 5: scan_Laser_vs_RF_phase_2024_01_25_11_00.png
scan_Laser_vs_RF_phase_2024_01_25_11_00.png
Attachment 6: scan_Laser_vs_RF_phase_2024_01_25_11_02.png
scan_Laser_vs_RF_phase_2024_01_25_11_02.png
Attachment 7: scan_Laser_vs_RF_phase_2024_01_25_11_04.png
scan_Laser_vs_RF_phase_2024_01_25_11_04.png
Attachment 8: scan_Laser_vs_RF_phase_2024_01_25_11_07.png
scan_Laser_vs_RF_phase_2024_01_25_11_07.png
Attachment 9: scan_Laser_vs_RF_phase_2024_01_25_11_12.png
scan_Laser_vs_RF_phase_2024_01_25_11_12.png
Attachment 10: Screenshot_from_2024-01-25_11-18-55.png
Screenshot_from_2024-01-25_11-18-55.png
Attachment 11: bpm_0_vs_ext_kicker_second_15h59.png
bpm_0_vs_ext_kicker_second_15h59.png
Attachment 12: Screenshot_from_2024-01-25_15-53-54.png
Screenshot_from_2024-01-25_15-53-54.png
Attachment 13: Screenshot_from_2024-01-25_15-58-31.png
Screenshot_from_2024-01-25_15-58-31.png
Attachment 14: bpm_0_vs_ext_kicker_second_16h22.png
bpm_0_vs_ext_kicker_second_16h22.png
Attachment 15: Screenshot_from_2024-01-25_17-14-11.png
Screenshot_from_2024-01-25_17-14-11.png
Attachment 16: Screenshot_from_2024-01-25_17-13-45.png
Screenshot_from_2024-01-25_17-13-45.png
Attachment 17: Screenshot_from_2024-01-25_17-12-36.png
Screenshot_from_2024-01-25_17-12-36.png
Attachment 18: Screenshot_from_2024-01-25_13-05-25.png
Screenshot_from_2024-01-25_13-05-25.png
Attachment 19: S_HisPhase.png
S_HisPhase.png
Attachment 20: S_Phase25012025.png
S_Phase25012025.png
Attachment 21: S_Ampl25012025.png
S_Ampl25012025.png
Attachment 22: figSRorbit_25012024.png
figSRorbit_25012024.png
Attachment 23: TbtX_BPM2_999turn_20_turn_24Jan25Jan_comparizon.pdf
Attachment 24: untitled.png
untitled.png
Attachment 25: mesures_X_stable_table_presque_opt2.dat
# DATASET= "xli/op/tmd.01/i1[0]"
# SNAPSHOT_TIME= 2024-01-25_17:03:29.091516
2024-01-25_16:12:21.277546	264.5495076651646
2024-01-25_16:12:21.478000	265.0835657916696
2024-01-25_16:12:21.478000	265.0835657916696
2024-01-25_16:12:21.577264	263.86286150251533
2024-01-25_16:12:21.677515	265.9990940085354
2024-01-25_16:12:21.777712	271.30152826454946
2024-01-25_16:12:21.877894	268.02088548744723
2024-01-25_16:12:21.978116	265.5794769091386
2024-01-25_16:12:22.077270	265.6557709272107
2024-01-25_16:12:22.177491	264.81653672841713
2024-01-25_16:12:22.277726	264.5495076651646
2024-01-25_16:12:22.377911	265.0072717735975
2024-01-25_16:12:22.478151	272.2170564814152
2024-01-25_16:12:22.577393	264.9691247645614
2024-01-25_16:12:22.677632	1651.6510502348424
2024-01-25_16:12:22.777818	278.24428390911476
2024-01-25_16:12:22.878015	273.3614667524974
2024-01-25_16:12:22.977183	268.1734735235915
2024-01-25_16:12:23.077366	266.11353503564357
2024-01-25_16:12:23.177565	264.5495076651646
2024-01-25_16:12:23.277781	264.5876546742007
2024-01-25_16:12:23.378020	265.80835896335503
2024-01-25_16:12:23.477223	263.5958324392628
2024-01-25_16:12:23.577437	271.1107932193691
2024-01-25_16:12:23.677707	275.57399327658965
2024-01-25_16:12:23.777916	268.74567865913264
2024-01-25_16:12:23.877121	263.21436234890206
2024-01-25_16:12:23.977303	268.7838256681687
2024-01-25_16:12:24.077539	270.1571179934673
2024-01-25_16:12:24.177809	263.3288033760103
2024-01-25_16:12:24.278045	1591.3787759578474
2024-01-25_16:12:24.377244	278.93093007176407
2024-01-25_16:12:24.477436	267.6394153970865
2024-01-25_16:12:24.577622	266.11353503564357
2024-01-25_16:12:24.677844	267.7920034332308
2024-01-25_16:12:24.778039	264.20618458383996
2024-01-25_16:12:24.877239	263.6721264573349
2024-01-25_16:12:24.977431	264.1298905657678
2024-01-25_16:12:25.077607	262.7947452495053
2024-01-25_16:12:25.177770	263.78656748444314
2024-01-25_16:12:25.277942	270.42414705671985
2024-01-25_16:12:25.377142	272.1789094723792
2024-01-25_16:12:25.477380	264.3969196290203
2024-01-25_16:12:25.577595	264.20618458383996
2024-01-25_16:12:25.677821	263.51953842119065
2024-01-25_16:12:25.778028	274.0862599241828
2024-01-25_16:12:25.877228	271.4922633097298
2024-01-25_16:12:25.977437	3400.2336504303457
2024-01-25_16:12:26.077637	286.1025677705457
2024-01-25_16:12:26.177807	272.7892616169563
2024-01-25_16:12:26.278018	268.36420856877186
2024-01-25_16:12:26.377234	264.6258016832367
2024-01-25_16:12:26.477434	266.0753880266075
2024-01-25_16:12:26.577672	264.4732136470925
2024-01-25_16:12:26.677854	264.3587726199843
2024-01-25_16:12:26.778043	264.4732136470925
2024-01-25_16:12:26.877240	264.24433159287605
2024-01-25_16:12:26.977435	273.93367188803853
2024-01-25_16:12:27.077629	263.86286150251533
2024-01-25_16:12:27.177810	263.2906563669742
2024-01-25_16:12:27.278020	262.90918627661347
2024-01-25_16:12:27.377220	264.0154495386596
2024-01-25_16:12:27.477421	261.91736404167557
2024-01-25_16:12:27.577639	262.3751281501085
2024-01-25_16:12:27.677854	2779.8869894857307
2024-01-25_16:12:27.778060	284.1189233006699
2024-01-25_16:12:27.877248	270.08082397539516
2024-01-25_16:12:27.977432	265.6939179362468
2024-01-25_16:12:28.077614	277.3669027012851
2024-01-25_16:12:28.177834	264.77838971938104
2024-01-25_16:12:28.278036	264.6639486922728
2024-01-25_16:12:28.377231	264.89283074648927
2024-01-25_16:12:28.477467	262.26068712300025
2024-01-25_16:12:28.577695	263.6339794482989
2024-01-25_16:12:28.677937	265.2361538278139
2024-01-25_16:12:28.777151	269.81379491214267
2024-01-25_16:12:28.877348	266.72388718022074
2024-01-25_16:12:28.977550	274.200700951291
2024-01-25_16:12:29.077761	264.24433159287605
2024-01-25_16:12:29.178000	263.48139141215455
2024-01-25_16:12:29.277185	270.69117611997234
2024-01-25_16:12:29.377358	2381.25074505877
2024-01-25_16:12:29.477570	280.9145745416398
2024-01-25_16:12:29.577804	270.42414705671985
2024-01-25_16:12:29.677975	265.84650597239107
2024-01-25_16:12:29.777175	265.6557709272107
2024-01-25_16:12:29.877378	270.9200581741888
2024-01-25_16:12:29.977582	263.4432444031185
2024-01-25_16:12:30.077809	278.4350189542951
2024-01-25_16:12:30.178027	264.8546837374532
2024-01-25_16:12:30.277264	262.0699520778199
2024-01-25_16:12:30.377481	271.7974393820184
2024-01-25_16:12:30.477697	262.29883413203635
2024-01-25_16:12:30.577949	265.6557709272107
2024-01-25_16:12:30.677194	265.3887418639582
2024-01-25_16:12:30.777424	263.2906563669742
2024-01-25_16:12:30.877653	263.9773025296235
2024-01-25_16:12:30.977896	266.41871110793215
2024-01-25_16:12:31.077096	1745.6834275087617
2024-01-25_16:12:31.177263	305.8627184512314
2024-01-25_16:12:31.277489	273.3614667524974
2024-01-25_16:12:31.377689	268.2116205326276
2024-01-25_16:12:31.477891	266.9527692344372
2024-01-25_16:12:31.577108	265.6939179362468
2024-01-25_16:12:31.677331	266.41871110793215
2024-01-25_16:12:31.777536	264.20618458383996
2024-01-25_16:12:31.877699	264.1298905657678
2024-01-25_16:12:31.977881	269.470471830818
2024-01-25_16:12:32.078082	262.26068712300025
2024-01-25_16:12:32.177287	265.0072717735975
2024-01-25_16:12:32.277497	276.56581551152755
2024-01-25_16:12:32.377770	266.41871110793215
2024-01-25_16:12:32.478008	265.77021195431894
2024-01-25_16:12:32.577232	262.52771618625275
2024-01-25_16:12:32.677495	271.1489402284052
2024-01-25_16:12:32.777675	263.21436234890206
2024-01-25_16:12:32.877910	299.30143289702687
2024-01-25_16:12:32.977138	269.3178837946737
2024-01-25_16:12:33.077363	267.71570941515864
2024-01-25_16:12:33.177562	265.3124478458861
2024-01-25_16:12:33.277771	263.17621533986596
2024-01-25_16:12:33.377921	274.6203180506878
2024-01-25_16:12:33.477062	262.4132751591445
2024-01-25_16:12:33.577290	264.9691247645614
2024-01-25_16:12:33.677536	262.7565982404692
2024-01-25_16:12:33.777752	270.65302911093625
2024-01-25_16:12:33.877990	262.8710392675774
2024-01-25_16:12:33.977222	261.95551105071166
2024-01-25_16:12:34.077415	262.90918627661347
2024-01-25_16:12:34.177614	263.17621533986596
2024-01-25_16:12:34.277827	262.4895691772167
2024-01-25_16:12:34.378076	263.710273466371
2024-01-25_16:12:34.477286	268.7838256681687
2024-01-25_16:12:34.577526	311.4703287795341
2024-01-25_16:12:34.677702	271.37782228262165
2024-01-25_16:12:34.777888	265.4268888729943
2024-01-25_16:12:34.877122	271.07264621033306
2024-01-25_16:12:34.977355	263.21436234890206
2024-01-25_16:12:35.077548	263.09992132179383
2024-01-25_16:12:35.177782	263.3288033760103
2024-01-25_16:12:35.277989	263.4050973940824
2024-01-25_16:12:35.377220	264.3969196290203
2024-01-25_16:12:35.477426	263.6721264573349
2024-01-25_16:12:35.577661	264.1680375748039
2024-01-25_16:12:35.677837	262.94733328564956
2024-01-25_16:12:35.778038	268.09717950551936
2024-01-25_16:12:35.877242	261.84107002360344
2024-01-25_16:12:35.977444	269.5086188398541
2024-01-25_16:12:36.077636	263.2906563669742
2024-01-25_16:12:36.177815	265.1217128007057
2024-01-25_16:12:36.278038	319.7482297403619
2024-01-25_16:12:36.377284	272.63667358081204
2024-01-25_16:12:36.477460	266.0753880266075
2024-01-25_16:12:36.577637	276.7184035476718
2024-01-25_16:12:36.677838	266.2279760627518
2024-01-25_16:12:36.778008	264.6258016832367
2024-01-25_16:12:36.877204	264.1680375748039
2024-01-25_16:12:36.977400	264.7020957013089
2024-01-25_16:12:37.077594	264.1680375748039
2024-01-25_16:12:37.177795	262.7565982404692
2024-01-25_16:12:37.277998	262.0318050687838
2024-01-25_16:12:37.377196	264.3206256109482
2024-01-25_16:12:37.477432	263.2906563669742
2024-01-25_16:12:37.577646	262.3369811410724
2024-01-25_16:12:37.677891	261.87921703263953
2024-01-25_16:12:37.777089	263.2906563669742
2024-01-25_16:12:37.877260	262.10809908685593
2024-01-25_16:12:37.977495	4114.765276685025
2024-01-25_16:12:38.077803	289.26876952053976
2024-01-25_16:12:38.178073	277.4050497103211
2024-01-25_16:12:38.277296	275.0399351500846
2024-01-25_16:12:38.377537	269.2034427675655
2024-01-25_16:12:38.477774	269.12714874949336
2024-01-25_16:12:38.577981	263.86286150251533
2024-01-25_16:12:38.677218	280.7238394964595
2024-01-25_16:12:38.777414	263.51953842119065
2024-01-25_16:12:38.877686	264.81653672841713
2024-01-25_16:12:38.977905	263.21436234890206
2024-01-25_16:12:39.077143	262.8710392675774
2024-01-25_16:12:39.177337	262.3369811410724
2024-01-25_16:12:39.277532	264.9691247645614
2024-01-25_16:12:39.377746	261.87921703263953
2024-01-25_16:12:39.477949	270.80561714708057
2024-01-25_16:12:39.577167	261.7647760055313
2024-01-25_16:12:39.677381	262.9854802946856
2024-01-25_16:12:39.777610	263.1380683308299
2024-01-25_16:12:39.877872	263.55768543022674
2024-01-25_16:12:39.977091	261.84107002360344
2024-01-25_16:12:40.077334	263.7484204754071
2024-01-25_16:12:40.177527	266.9527692344372
2024-01-25_16:12:40.277787	1665.7654435781892
2024-01-25_16:12:40.377997	400.009536752259
2024-01-25_16:12:40.477201	290.6420618458384
2024-01-25_16:12:40.577375	274.6203180506878
2024-01-25_16:12:40.677551	270.6148821019002
2024-01-25_16:12:40.777798	280.9527215506759
2024-01-25_16:12:40.878030	265.1217128007057
2024-01-25_16:12:40.977266	266.5331521350404
2024-01-25_16:12:41.077443	270.00452995732303
2024-01-25_16:12:41.177625	265.1217128007057
2024-01-25_16:12:41.277860	264.3206256109482
2024-01-25_16:12:41.377069	263.09992132179383
2024-01-25_16:12:41.477330	263.6339794482989
2024-01-25_16:12:41.577546	263.5958324392628
2024-01-25_16:12:41.677788	262.8710392675774
2024-01-25_16:12:41.777993	270.6148821019002
2024-01-25_16:12:41.877196	275.8028753308061
2024-01-25_16:12:41.977388	262.4895691772167
2024-01-25_16:12:42.077622	264.6258016832367
2024-01-25_16:12:42.177824	261.87921703263953
2024-01-25_16:12:42.278077	264.3206256109482
2024-01-25_16:12:42.377315	267.10535727058146
2024-01-25_16:12:42.477521	261.2307178790263
2024-01-25_16:12:42.577726	263.5958324392628
2024-01-25_16:12:42.677941	263.710273466371
2024-01-25_16:12:42.777144	264.1298905657678
2024-01-25_16:12:42.877338	261.49774694227875
2024-01-25_16:12:42.977566	263.48139141215455
2024-01-25_16:12:43.077775	262.9854802946856
2024-01-25_16:12:43.177979	263.710273466371
2024-01-25_16:12:43.277202	264.3969196290203
2024-01-25_16:12:43.377433	262.7947452495053
2024-01-25_16:12:43.477634	261.95551105071166
2024-01-25_16:12:43.577851	262.90918627661347
2024-01-25_16:12:43.677081	267.7920034332308
2024-01-25_16:12:43.777343	264.5495076651646
2024-01-25_16:12:43.877538	261.1162768519181
2024-01-25_16:12:43.977754	272.5603795627399
2024-01-25_16:12:44.077958	272.63667358081204
2024-01-25_16:12:44.177169	263.1380683308299
2024-01-25_16:12:44.277389	264.2824786019121
2024-01-25_16:12:44.377609	262.90918627661347
2024-01-25_16:12:44.477799	261.68848198745917
2024-01-25_16:12:44.578005	262.3369811410724
2024-01-25_16:12:44.677239	263.82471449347923
2024-01-25_16:12:44.777436	260.88739479770163
2024-01-25_16:12:44.877665	262.52771618625275
2024-01-25_16:12:44.977858	267.98273847841114
2024-01-25_16:12:45.077056	263.06177431275773
2024-01-25_16:12:45.177292	262.4132751591445
2024-01-25_16:12:45.277522	263.86286150251533
2024-01-25_16:12:45.377724	261.3833059151706
2024-01-25_16:12:45.477969	265.77021195431894
2024-01-25_16:12:45.577274	261.612187969387
2024-01-25_16:12:45.677519	261.53589395131485
2024-01-25_16:12:45.777778	263.09992132179383
2024-01-25_16:12:45.878032	262.29883413203635
2024-01-25_16:12:45.977265	263.6339794482989
2024-01-25_16:12:46.077470	273.2088787163531
2024-01-25_16:12:46.177713	263.4432444031185
2024-01-25_16:12:46.277913	265.7320649452829
2024-01-25_16:12:46.377089	268.2879145506997
2024-01-25_16:12:46.477306	261.95551105071166
2024-01-25_16:12:46.577546	261.2307178790263
2024-01-25_16:12:46.677803	263.4050973940824
2024-01-25_16:12:46.778007	263.86286150251533
2024-01-25_16:12:46.877242	261.49774694227875
2024-01-25_16:12:46.977440	263.48139141215455
2024-01-25_16:12:47.077612	261.3833059151706
2024-01-25_16:12:47.177856	260.8111007796295
2024-01-25_16:12:47.277050	261.99365805974776
2024-01-25_16:12:47.377250	262.68030422239707
2024-01-25_16:12:47.477465	262.60401020432494
2024-01-25_16:12:47.577657	261.53589395131485
2024-01-25_16:12:47.677876	262.26068712300025
2024-01-25_16:12:47.777047	262.0318050687838
2024-01-25_16:12:47.877248	262.3369811410724
2024-01-25_16:12:47.977420	263.6339794482989
2024-01-25_16:12:48.077659	261.87921703263953
2024-01-25_16:12:48.177825	261.53589395131485
2024-01-25_16:12:48.278037	262.0318050687838
2024-01-25_16:12:48.377240	261.7266289964952
2024-01-25_16:12:48.477480	261.91736404167557
2024-01-25_16:12:48.577690	264.0917435567317
2024-01-25_16:12:48.677915	270.00452995732303
2024-01-25_16:12:48.777119	271.30152826454946
2024-01-25_16:12:48.877386	261.1925708699902
2024-01-25_16:12:48.977643	263.4050973940824
2024-01-25_16:12:49.077843	262.3751281501085
2024-01-25_16:12:49.177044	261.87921703263953
2024-01-25_16:12:49.277281	272.2552034904513
2024-01-25_16:12:49.377482	262.68030422239707
2024-01-25_16:12:49.477686	262.8710392675774
2024-01-25_16:12:49.577895	263.0236273037217
2024-01-25_16:12:49.677122	262.4132751591445
2024-01-25_16:12:49.777317	269.81379491214267
2024-01-25_16:12:49.877524	261.4214529242066
2024-01-25_16:12:49.977745	261.68848198745917
2024-01-25_16:12:50.077962	260.9255418067377
2024-01-25_16:12:50.177168	262.10809908685593
2024-01-25_16:12:50.277370	261.87921703263953
2024-01-25_16:12:50.377620	273.3996137615335
2024-01-25_16:12:50.477829	260.6585127434852
2024-01-25_16:12:50.577037	262.10809908685593
2024-01-25_16:12:50.677279	261.078129842882
2024-01-25_16:12:50.777470	261.3451589061345
2024-01-25_16:12:50.877682	268.5549436139523
2024-01-25_16:12:50.977894	264.6258016832367
... 29982 more lines ...
Attachment 26: image_00140.tif
Attachment 27: image_00143.tif
  836   Wed Jan 31 14:12:25 2024 RC VC MJ Under ProcessOtherRing Commissioning commitionning 

Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par step

14:  formation CFP + machine (anneau et extraction line)

==> alignement point cathode sur courant d'obscurité + alignement dans Quad (cf. screenshot)

==> affinage extraction line (cf. Screenshot)

Recette sauvegardée dans "good_20240131_16_01_08"

La recette précédente à permis d'injecter directement dans l'anneau (aucune modification autre que phase + atténuateur) (pas de changement de phase cavité RF)

X: trouvé directement (phase 500MHz ajusté à 7.3V)

17h30 : arrât machine

Attachment 1: 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png
2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png
Attachment 2: 2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 

8h10 rémarrage machine chauffage klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y  (tous les DS redpy baie 17 )

Cycling ok

ready to start at 9h15
 

Sophie; Hayg peresent. Other people for ring formation  are  missing  without 

 

Mohamed installed powermeter in the casemate.

Sophie prepare linac.

PROBLEM: Observation: too many missed triggers from modumator. Call Vincent.Incertitude synchro: IMPORTANT solution by Vincent (more details ask Vincent):

Problem solution: change RF frequency 250000-250001 ; confirm on synchoro scope frequency sweep; change back 250000-250001; Problem solved, confirmed on scope http://192.168.229.21

Resolution d'instabilité de déclenche du modulateur:

si le signal observé sur  ICT 1 (Gun) n'apparait pas à 10Hz  (ie nBs de coups manqués sup à 1:100) => pB de synchro

pour le résoudre il faut changer la phase entre le 500MHz ri et le 33MHz ri. 

solutions:

1- changer la fréquence 500MHz ri  , +1Hz et -1Hz    (aller retour)

2- changer la fréquence du 33MHz ri  +1Hz et -1Hz    (aller retour)

3- changer la phase du 33MHz ri (0.1°)

Attention la phase injection anneau et la phase FP/ electrons peut changer

test à faire pour expliquer la perte d'énergie du faisceau.

 

 

 

10.43 PROBLEM no explanation of : beam energy  wrt to attenuator and section power

section 9.8 MW att 2 dB

canon 6.35 MW

Beam at TL2 for att 2dB for dipole 147.3 . Section Power 10.4MW

12.30-13.30h Lunch pause

14h restart , try to understand power vs electrons energy mismatch.

We can not proceed to ring injection at wrong electron  beam energy. Attenuator should be reduced to 1.3 , which  is not allowed by Mohamed, since section power should not exceed 11 MW. 

Check de la postion temporelle du faisceau d'électron dans la RF de la section: la position actuelle est bonne une avance de 200ns (passage de -8.2µs à -8.4µs ) de l'impulsion laser PC dans l'impulsion RF ne change pas l'energie du faisceau 

(test sur la varation de position sur SST0.2)

 

test Puissance dasn la secteur LIL

Pin section wattmetre sur coupleur d'entrée 10.5MW

Pout charge mesure demain...

 

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes

 

 

 

16:00; Stop shift machine et arret machine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  842   Tue Feb 6 08:52:28 2024 VC MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissionning 

8h45 demarrage machine

modulateur frigo ampli laser chiller et cyclage des aimants

IHM warm-up done (fin chauffage modulateur (9h50)

mise en route du PA (exploitation sur PSS) (9H10)

Modulateur trig

Les cameras ne s'allument pas --> restart camera

scan charge phase de l'interface start ne met pas la bonne phase - phase trouvee et mise a la main

attenuation 1.29 phase 105

faisceau stocke dans l'anneau

14h - Mesures SPR radiations accelerateur

Beam shutter securite ne remonte plus --> Mesure SPR X-hutch control impossibles ...... Harold intervient  --> Probleme regle --> ~ 15h45 : Mesure SPR X-rays dans X-hutch

Ensuite, premiere prise de donnees Diode Si calibree (flux absolu).

  • Fichier data dans data/shared du jour - 2024-02-06-diode_calibree_donnees.dat
  • Resultats a la la louche (a l'oeil sur le trend, sans traitement des donnees en bonne et due forme) : flux total ~ 7. 10^9 ph/s -
  • --> Plutot coherent avec ce que donnait la diode fluo en fin de matinee (~ 20000  ---> flux total ~ 10. 10^9 ph/s)

16h30 : Arret machine - Mesure SPR dans la casemate

 

** Rayons-X avec prise de spectre. 

Delai trig/CFP : 20.4ns

Position des fentes 1 pour etre au centre du faisceau (à affiner) : [h,v] = [-7.4mm, 3mm]

 

 

 

 

Attachment 1: image_00152_modified.jpg
image_00152_modified.jpg
Attachment 2: image_00152.tif
Attachment 3: 2022-02-06-fentes-ouvertes.mca
<<PMCA SPECTRUM>>
TAG - live_data
DESCRIPTION - 
GAIN - 5
THRESHOLD - 0
LIVE_MODE - 0
PRESET_TIME - 0
LIVE_TIME - 6.831844
REAL_TIME - 65.314000
START_TIME - 02/06/2024 12:51:57
SERIAL_NUMBER - 0
<<DATA>>
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
... 7976 more lines ...
Attachment 4: 2022-02-06-fentes-1mm-centree.mca
<<PMCA SPECTRUM>>
TAG - decentree_0mm_fentes_1mm
DESCRIPTION - 
GAIN - 5
THRESHOLD - 0
LIVE_MODE - 0
PRESET_TIME - 0
LIVE_TIME - 34.227181
REAL_TIME - 54.303000
START_TIME - 02/06/2024 12:58:50
SERIAL_NUMBER - 0
<<DATA>>
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
... 7976 more lines ...
Attachment 5: 2022-02-06-fentes-1mm-decentree2mm.mca
<<PMCA SPECTRUM>>
TAG - decentree_2mm_fentes_1mm
DESCRIPTION - 
GAIN - 5
THRESHOLD - 0
LIVE_MODE - 0
PRESET_TIME - 0
LIVE_TIME - 35.816396
REAL_TIME - 79.310000
START_TIME - 02/06/2024 13:14:01
SERIAL_NUMBER - 0
<<DATA>>
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
... 7976 more lines ...
Attachment 6: 2022-02-06-fentes-1mm-decentree7mm.mca
<<PMCA SPECTRUM>>
TAG - decentree_7mm_fentes_1mm
DESCRIPTION - 
GAIN - 5
THRESHOLD - 0
LIVE_MODE - 0
PRESET_TIME - 0
LIVE_TIME - 77.668957
REAL_TIME - 103.242000
START_TIME - 02/06/2024 13:18:25
SERIAL_NUMBER - 0
<<DATA>>
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
... 7976 more lines ...
Attachment 7: Capture.PNG
Capture.PNG
  843   Tue Feb 6 20:21:38 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissioning 

14h - Mesures SPR radiations accelerateur

Beam shutter securite ne remonte plus --> Mesure SPR X-hutch control impossibles ...... Harold intervient  --> Probleme regle --> ~ 15h45 : Mesure SPR X-rays dans X-hutch

Ensuite, premiere prise de donnees Diode Si calibree (flux absolu).

  • Fichier data dans data/shared du jour - 2024-02-06-diode_calibree_donnees.dat
  • Resultats a la la louche (a l'oeil sur le trend, sans traitement des donnees en bonne et due forme) : flux total ~ 7. 10^9 ph/s -
  • --> Plutot coherent avec ce que donnait la diode fluo en fin de matinee (~ 20000  ---> flux total ~ 10. 10^9 ph/s)

16h30 : Arret machine - Mesure SPR dans la casemate

  419   Fri Mar 25 08:22:18 2022 VC SC HG NDUnder ProcessLinacDiag | Linac Commissionning commisionning Charge et OTR  

demarrage Modulateur 8h20

9h15 temp chiller ok

energie laser 32uJ atténuateur à 450 (max à 410)

modulateur HT sur 1000V

Pas de passage en HV, il reboot le chauffage

11h debut reglages

Phase charge max=314
=> phase mise a 274

12h Reglages OTR

12h10 Acces OTR

MODULATEUR ERREUR 14h

acces controlé 14h26

14H40 décrochage laser

Transport sur FC: ICT-Li- 25pC  FC-TL-33pC

image configuration standar : FC-cable 1m RG58- cable 30m LMR200- filtre passe bas 22MHz

Transport sur FC: ICT-Li- 22pC  FC-TL-31pC

image configuration  : FC-cable 1m RG58- filtre passe bas 22MHz-cable 30m LMR200-

Transport sur FC: ICT-Li- 22pC  FC-TL-32pC

image configuration  : FC-cable 1m RG58- filtre passe bas Maison-cable 30m LMR200-

 

Transport sur FC: ICT-Li- 25pC  FC-TL31pC

image configuration  : FC-cable 1m RG58- filtre passe bas Maison-cable 30m LMR200-filtre 22MHz

 

Transport sur FC: ICT-Li- 28pC  FC-TL34pC

image configuration  : FC-filtre passe bas Maison-cable 1m RG58- filtre passe bas Maison-cable 30m LMR200-filtre 22MHz


 

Transport sur FC: ICT-Li- 24pC  FC-TL 29pC

image configuration  : FC-filtre passe bas Maison-cable 1m RG58- filtre passe bas Maison-cable 30m LMR200-

 

mise en configuration : FC-filtre passe bas Maison-cable 1m RG58- filtre passe bas Maison-cable 30m LMR200-filtre 22MHz

======

* Tâches sans faisceau (à faire quand on a un temps mort)
- Test IHM prises connectées (x2) FAIT


* Tâches demandant beaucoup d'accès
- impédance de la FC
- tests OTR

* Tâches depuis la salle de contrôle
- calibration des mesures de charges (+BPM) EN COURS
- test AcqAttrManager
- IHM transport charge

-Sauvergarde des recettes

 

 

Attachment 5: Screenshot_from_2022-03-25_16-20-06.png
Screenshot_from_2022-03-25_16-20-06.png
Attachment 6: Screenshot_from_2022-03-25_16-20-06.png
Screenshot_from_2022-03-25_16-20-06.png
Attachment 7: Screenshot_from_2022-03-25_16-20-06.png
Screenshot_from_2022-03-25_16-20-06.png
Attachment 11: Screenshot_from_2022-03-25_17-13-47.png
Screenshot_from_2022-03-25_17-13-47.png
  878   Mon Jun 10 13:36:25 2024 KD, CJ, WE, GO, VC, NDUnder ProcessShift summaryLinac Commissionning claquage et test micros 

9h: accès sous-sol

12h: démarrage modulateur pour test micro (atténuateur à 15dB)

** Les micros sont positionné à différents endroit pour voir leur réponse (2 micros au même endroit)

sur la bride d'entrée diviseur de puissance (cf image)

sur la bride d'entrée atténuateur (cf image)

** les micros sont mis : sur la bride du diviseur, un sur la bride de l'atténuateur

** puis on fait varier l'atténuateur pour voir si ca change quelques chose. Les claquage à 5dB sont moins fréquents (toutes les minuetes) qu'à 15dB (à peine qq secondes)

** à 5Hz les claquage sont moins réguliers encore (toutes les 3mins)

*** Conclusions ***

Il semblerait que le diviseur ET l'atténuateur claquent (cf courbes à 5dB)

Il y a toujours des micros claquages (même sans interlock) visibles (cf courbe à 4dB)

 

 

 

Attachment 1: claquage_micro_bride_entree_diviseur.png
claquage_micro_bride_entree_diviseur.png
Attachment 2: claquage_micro_bride_entree_attenuateur.png
claquage_micro_bride_entree_attenuateur.png
Attachment 3: claquage_micro_bride_entree_diviseur_attenuateur.png
claquage_micro_bride_entree_diviseur_attenuateur.png
Attachment 4: claquage_micro_bride_entree_diviseur_attenuateur_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_zoom.png
Attachment 5: claquage_micro_bride_entree_diviseur_attenuateur_bis.png
claquage_micro_bride_entree_diviseur_attenuateur_bis.png
Attachment 6: claquage_micro_bride_entree_diviseur_attenuateur_ter.png
claquage_micro_bride_entree_diviseur_attenuateur_ter.png
Attachment 7: claquage_micro_bride_entree_diviseur_attenuateur_5dB.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB.png
Attachment 8: claquage_micro_bride_entree_diviseur_attenuateur_5dB_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_zoom.png
Attachment 9: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis.png
Attachment 10: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis_zoom.png
Attachment 11: standard_micro_bride_entree_diviseur_attenuateur_4dB.png
standard_micro_bride_entree_diviseur_attenuateur_4dB.png
  879   Tue Jun 11 08:44:30 2024 M EK, NDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning claquage et test micros 

8:30 impossible de mettre en chauffe modulateur

Pompe ThomX HS

Dalkia a été contacté par email pour une intervention pour mettre en marche la pompe

11:00 Fin chauffage

Acces pour deplacer les micros sur la branche canon:

- Vert sur le coude apres le diviseur

- Jaune a l 'entree de l'attenuateur canon

11:15 Demarrage

Ca claque mais peu de signature audio cote canon (cf screenshot a 11h27). Exception: cf screenshot a 11h25.

11:40 Micros sur diviseur (jaune) et bride en sortie de tunnel (vert)

Jaune: beaucoup de bruit meme hors RF

La plupart des claquages semblent loin (hors temps par rapport a la RF)

 

 

Attachment 1: RF_network.png
RF_network.png
Attachment 2: Screenshot_from_2024-06-11_11-25-49.png
Screenshot_from_2024-06-11_11-25-49.png
Attachment 3: Screenshot_from_2024-06-11_11-25-38.png
Screenshot_from_2024-06-11_11-25-38.png
Attachment 4: Screenshot_from_2024-06-11_11-27-49.png
Screenshot_from_2024-06-11_11-27-49.png
Attachment 5: Screenshot_from_2024-06-11_11-42-56.png
Screenshot_from_2024-06-11_11-42-56.png
Attachment 6: Screenshot_from_2024-06-11_11-43-45.png
Screenshot_from_2024-06-11_11-43-45.png
  378   Tue Mar 1 11:53:20 2022 CB/JNC ProblemCC | Linac Commissionning charge phase 

Image laser sauvée à 11h50, dimension rms 80 pixel en vertical et 94 en horizontal, position du laser : 934.34 en horizontal et 575.48 pixels

2bD sur voie canon, HT 1090

Impossible de lancer jupyter-lab depuis un terminal --> voir note sur elog CC

la commande jupyter-notebooks fonctionne

On a trouvé le script charge phase dans dans commissioning script/linac/chare/Charge_Phase

Impossible de lancer le script, la charge n'est aps clairement lisible sur l'ihm charge, on ne connait donc pas la charge.

phase de max charge @293 degrés, on se décale de 50 degrés, coil2 à 180A, image enegistrée sur LISST1 à 12h13 

Energie 3.7 MeV

On se remet à charge max, et on vérifie l'alignement soléno

 

point de départ TX 0.4mm, tz 2.5mm, rx 5.5mrad, rz -4

on se rapproche, le bary centre à 0A semble bouger, on vérifie la position du laser : posh 935.1, et posv 561, il a donc bougé en vertical, ce qui correspond à nos observations sur la faiscaeu

on s'arrete à TX 0.45mm, tz 2.6mm, rx 5.4mrad, rz -4.3 mrad

Charge phase effacé par Hayg ;))

position laser mesurée à 15h29 : 920.28, et 583

perte d'énergie Rf pour les m^emes consignes ....

- 16h25 : Charge max @256 ... on shift en phase

- 17h42 : canon désadapté, la température pour adapter ne semble plus etre à 32.75°C.

19h40 : energie sortie de canon à 2dB 3.6 MeV. le canon semble à nouveau fonctionnel. Il faut vérifier le fonctionnement du Chiller car la consigne est à 26° et cela ne semble pas refroidir la boucle qui reste à 31.7 en sortie chiller. 

20h30 : 0dB sur le canon : 2.8 MeV ...

 

 

  1065   Tue May 6 11:38:24 2025 VS, AG, KDNew SolutionInfoLI | Laser | Opt | Linac Commissionning changement PhotoCathode icon4.gif 

lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)

- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)

- démontage et inspection du hublot et miroir de renvoie sous vide (démontage de l'ICT pour accéder au miroir de renvoie) :

      * le Hublot semble ok mais il est salle sur la face à l'air ==> nettoyage

      * le miroir de renvoie est piqué (impacts laser) de plus il est éclaté (casse du substrat sûrment dû à des arcages) ==> changement du miroir

          ** Impossibilité de le mettre sans réhausse en fasse arrière (clinquants).

          ** Les griffes de maintien sont mises plus fortement en appuis sur le miroir. 

          ** Contact électrique vérifié entre la face avant (dépôt argent) et le support.

 

 

mardi 6 : alignement laser sur la cathode trouée

- le faisceau est réaligné au centre de la cathode trouée. Nouvelle position de référence sur la caméra PhotoCathode [H,V] =  [5.55, 3.35]

- mesure de puissance laser Photocathode :

sortie Iris :

@1.3mm 20uJ

@3mm 57uJ

@7mm 93uJ

injection canon atténuateur @420pas :

@1.3mm 18uJ

@3mm 48uJ

@7mm 78uJ

sortie canon (sur la cathode Mg) atténuateur @420pas :

@1.3mm 14uJ

@3mm 40uJ

@7mm 63uJ

 

mercredi 7 mai : remise sous vide du canon (~12h), cathode installée depuis 16h la veille

- mesure/calibration atténuateur pour limiter l'énergie laser à 5-10uJ (pour débuter)

Attachment 1: 2025-05-06_11_33_33_li_op_las_02_RAW.png
2025-05-06_11_33_33_li_op_las_02_RAW.png
Attachment 2: 20250505_144041.JPG
20250505_144041.JPG
Attachment 3: 20250505_144600.JPG
20250505_144600.JPG
Attachment 4: 20250505_144453.JPG
20250505_144453.JPG
Attachment 5: cathode_Mg_polie.jpg
cathode_Mg_polie.jpg
Attachment 6: Anicen_miroir_1.jpg
Anicen_miroir_1.jpg
  524   Wed Aug 3 11:30:54 2022 AM/SC/CB/JNC FixDiag | Linac Commissionning camera TL/SST2 + fente 

Intervention camera

Position YAG -64 mm, se mettre en internal trigger manuellement sur jive et relancer l'acquisition avec le DS de jive TL/DG/SST.02-CCD.01-bassler, attention le live viewer et pas le viewer --> le lancer de healthcheck pour plus de sécurité (le viewer et le CCD), vérifier frame sur 0

Sur TL/DG/SST.02, penser à mettre la camera sur Internal_Trigger dans TL/DG/SST.02-CCD.01 cliquer sur les trois petits points et copier coller INTERNAL_TRIGGER en haut.

Ensuite vérifier dans TL/liveviewer/SST.02-CCD.01 que Exposure time est à 1 et mettre frame number à 0 pour une acquisition en continu, si besoin le redemarrer

SST.03 droite de l'image c'est coté anneau

 

inetreface panneau jive interface SSt, IHM fente.py, le pas moteur est indiqué en mm, mais en fait il n'y a pas la conversion

mot 01, c'est le moteur coté gauche par rapport à la trajectoire du faisceau, celui coté anneau

mot 02, opérationnel, celui coté mur

0mm c'est in fente fermée

+19mm demi-fente ouverte

Ajout dans plateforme IHM des fentes

 

 

 

 

 

 

 

  610   Wed Oct 26 14:56:33 2022 Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:56:19 2022 UrgentLinac Commissionning camera SST2 HS ? 

Parametres de recipe_recipe_LI_TL_RI_20221014_16_44_34.txt mais avec Idipole=144 au lieu de 156.7 ...... (je ne comprends pas cette grosse difference)

Bon et j'essaie de voir qqchose sur la camera SST02 : impossible, elle reste bleue sans jamais rien de visible alors que le faisceau va jusqu a l'entree de l'anneau !

Nicolas peux-tu regrder si ya un truc qui cloche stp. Ca me bloque pour tout .

(les bpm ,3 et 4 sont revenus a la vie eux)

Attachment 1: Screenshot_from_2022-10-26_15-02-44.png
Screenshot_from_2022-10-26_15-02-44.png
  83   Fri Oct 1 15:40:37 2021 Entered by Christelle Bruni from 82.64.20.144 on Fri Oct 1 15:40:21 2021FixedLinacLinac Commissionning bilan du premier octobre 2021 

Bilan

-Modulateur/RF
-Interlock modulateur est à nouveau survenu cette semaine
-Nouveaux tests (remplacement alim 24V tiroir suspecté)
-Puissance stable, vérifiée par Pierre et Nourredine
-Canon
-Rapport à venir
-Problème réglage de l’interlock local/distance
-Conditionnement jusqu’à 6MW, 3us, 1Hz
-Début du conditionnement à 5 Hz (étuvage peut être mais pas pour les micro-claquages)
-Difficulté pompage à l’arrière de la cathode
-Mauvais fonctionnement pompe ionique ?
-Petite activité réfléchie canon fin de pulse
-Possibilité utiliser script de Nicolas pour enregistrement de signaux, archivage (vide déjà archivé, pressions et tensions, courant)
-Envoie fichier conversion puissance/tension
-CC/ acquisition
-Attention connexion à distance, ralenti à prévoir discussion pour convenir d’une règle qui convient à tout le monde
-Image courant d’obscurité (pb pixel mort à corriger, clic droit ne marche pas) à appuyer sur bouton save, en cours de modif pour ajuster la façon de sauver
-Tests redpitaya à à venir
-Vérification laser, énergie, vérif alignement sur périscope,  atténuateur ( LI/OP/OPT.01-Att.01)
-Synchro en cours, pilotage atténuateur ?
Amélioration CC (interlock, profibus, rafraichissement vide) ?
Interlock vide à prévoir redémarrage des DS
Affichage en mbar, seuil passer à 5 10-6 (défini au niveau de l’automate), protection des alim des pompes
Page web avec status machine à envoyer variable
Steerer remonté, alim à tester remote control

Actions futures

Démarrage faisceau
Lundi : matin alignement laser, faisceau dans la foulée lundi ou mardi
Lundi-jeudià Christelle
Vendredi à Sophie
Rappel : Interruption pour éléments pulsés (salle ouverte) les jeudi/vendredi 14/15/21/22 octobre
Co-activité laser FP possible ?
Co-activité travaux sous sols ?

  50   Fri Jul 9 14:48:03 2021 Entered by Christelle Bruni from 82.64.20.144 on Fri Jul 9 14:47:39 2021FixedShift summaryLinac Commissionning bilan du 9 juillet 2021 
-Canon
-Ajustement avec la cathode aluminium fait
-Possibilité de montage sur site semaine prochaine avec une cathode cuivre faites en local
-Alignement laser avec la cathode trouée à Kevin Dupraz et Kevin Cassou
-Modulateur/RF
-Monté à 37 MWà calibration avec wattmètre de crête
-Problème à identifier sur le manque de débit lorsque le refroidissement de la cavité RF anneau est en route simultanément de celle du modulateur--> à discuter en réunion générale
-Cristaux re-calibrés par Vincent
-Ligne cherenkov
-Presque terminé à manque un miroir
 
Actions futures
Canon spare
Montage canon dès lundi, fonctionnement modulateur en fin de semaine selon les possibilités, accès vide à distance
Modifications à effectuer pour le long terme (purgeurs, débitmètre) sur la régulation d’eau modulateur
Ref débimètre (PF2W711-F10-67) distributeur SMC
Achat (Jean Noel)
By-pass présent sur le réseau, certainement à régler (à prévoir semaine prochaine)
Retour d’information du panneau avant du modulateur (visu et pilotage)
Jean Claude a proposé une solution; Hayg a testé à OK
Attention à la réactivité et positionnement souris (réservé experts)
Code erreur ?
Récupération Uk, Ik --> via le panneau
Homogénéité des installations informatiques à traiter
Remonter les besoins à Hayg pour l’install par Guillaume Philippon
ELOG V3.1.4-395e101