ID Date Author Status Type Categorydown Important Subject Icon
  1033   Wed Mar 12 07:52:55 2025 KD, VM, MJ, DN, RC, ICUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 12 mars 2025 

7h50 : mise en chauffe machine (modulateur, frigo/chillers, laser, cyclage aimants)

 

**** Programme de la journée ****

- Mesure spectre angulaire (déplacement spectromètre dans le faisceau de rayons-X)

- Mesure spectre sur l'axe à différentes longueur de stockage

12h38 Beam is in the ring. X ray spectrum measurements. Parameters:

RF gun phase is 103 dg., Sect phase is 219 dg., Att. is 2.499 dB, TL/BPM2 X=+3 mm, Charges; -106 pC, -103 pC,-114 pC, the ring RF 150 kV, Phase -13 dg. 

12h45 Vacuum interlock V1

13h12 RF gun phase is 97 dg., Sect phase is 212 dg., Att. is 2.449 dB, TL/BPM2 X=+3 mm, Charges; -104 pC, -105 pC,-115 pC, the ring RF 150 kV, Phase -13 dg. TBTSum=1.4e11

  1051   Thu Apr 3 09:08:03 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 3 avril 2025 

9h: mise en chauffe machine en remote (Modulateur, frigo/chiller, laser, cyclage aimants).

  1086   Wed Jun 11 08:12:28 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 11 juin 2025 

8h10: mise en chauffe à distance (modulateur, frigo/chiller, cyclage aimant, laser)

Programme: Nouvelle prise de donnees Spectres Echantillon Bazin

  1096   Tue Jul 1 08:15:08 2025 KD MJ VC DN RCUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 01 juillet 2025 

8h15: mise en chauffe distance (chiller/frigo, modulateur, laser, cyclage)

9h45: modulateur ok  

Attenuateur laser à 270 => Qict1 = 100pC
iris 1.3mm
recette "50MHz flat"
optimisation Qpole LI (scrip spider)
faire un reset ckiker extraction en local
asservissemnt phase Laser PC Li 500MHz on
asservissemnent position injection linac (script spider) (cd /data/shared/commissioning_scripts/Linac/Alignements/python ./feedback_linac_injection.py )
injection dans l'anneau avec  FBL power RF 150KV

diag :
192.1668.229.22 perte injection
taurusplot r1-c2/dg/BPM.03-li

Avec recette FLAT et FPC 21 kW - 50 MeV
   Mesures
     ** flux diode calib

             signal tres bruite (pas possible d'entrer dans la X-hutch pour checker connexion car shutter bloque ouvert pb PSS)
     **  spectre : toujours pas de procedure pour trouver le on-axis ... Simu pour comprendre
     **  taille source fente 1 + photonic (image MRSV prise pour comparaison)

 


 

 

 

 

Attachment 1: orbit_recette_flat.png
orbit_recette_flat.png
  1098   Thu Jul 3 08:06:05 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 03 juillet 2025 

8h05: mise en chauffe en remote (frigo/chiller, laser, modulateur, cyclage)

9h: problème avec le DEG04 (pas de trig),  la lumière de la PLL est rouge (post synchro) ==> il faut redémarrer et réactiver les voies en "EXT" via l'interface web (interface IHM ne fonctionne pas) (IP: 192.168.229.124)

Attention changement de fréquence 500MHz ring => changement de phase 33MHz obligatoire pour pas avoir de saute de synchro(spider Write_Phase RIGOL_33MHz.py)

10h :

- Chargement de la recette "/data/shared/recipes/saved/References/61p5MeV_20250331_18_08_02.txt"

- ajustement atténuation (1.07dB) 

- alignement dans les quads

- injection dans l'anneau immédiate ==> tune de la phase au déphaseur phase RF manuelle, on passe de 449X° à 344X°

11h: injection dans la ligne d'extraction (le kicker semble ne pas sauter), gros bruit au niveau de SpX de EL/BPM.01 ==> mise à jour recette 61.5MeV dans le dossier de référence

12h: ajustement de la CFP ==> il y a des rayons X

- prise de spectre

- prise image pour mesure de taille faisceau

 

*** programme ***

test rayons X à 70keV (61.5MeV)
 

 


 


 

 

Attachment 1: 2025-07-03_12_56_24_el_dg_sst_01-ccd_01_RAW.png
2025-07-03_12_56_24_el_dg_sst_01-ccd_01_RAW.png
Attachment 2: 2025-07-03_10_40_07_OBL_DG_MRSV_01-CCD_01_RAW_0.png
2025-07-03_10_40_07_OBL_DG_MRSV_01-CCD_01_RAW_0.png
Attachment 3: spectre_70keV.bmp
  1100   Mon Jul 7 08:04:06 2025 KD,ND, RC,DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 07 juillet 2025 

8h: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

9h14: Demarrage faisceau

9h45: Faisceau dans l'anneau

Efficacite stockage anneau: 98%

10h20: Optimisation retard kicker ext: -7.5610

10h30: Insertion fentes TL/DG/SRH

Position sans affecter le faisceau dans l' anneau: 19.5mm / 24mm

12h18: Acces pour reinitialiser un controleur de moteur.

12h30 Redemarrage

14h37 Reprise de la phase RF vs laser

??? Stop ThomX

**** Programme ****

1) Prise de données rayons X pour manip de dosimétrie (61.5MeV)

  1103   Thu Jul 17 08:08:41 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 17 juillet 2025 

8h05 : mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)

 

*** Programme ***

- prise de spectre fluorescence (échantillon prostate) et amélioration du setup (réduction du bruit de fond)

==> Fait, montage avec du plomb meilleur et faisceau collimé dans le cone en plomb

- mise en place de la diode Calibrée "sans" bruit (écran alu)

==> pas eu le temps de progresser sur ce point

  1121   Tue Sep 16 12:11:42 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 16 septembre 2025 

12h: mise en chauffe (modulateur, frigo/chiller, laser, cyclage)

==> plantage IHM cyclage (2fois)

12h15: Stop machine ==> pas besoin pour la CFP 

*** Programme CFP ***

  1130   Tue Sep 30 08:41:41 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 30 septembre 2025 

8h40: mise en chauffe en remote (frigo/chiller, modulateur, laser)

9h30: ajout de graisse sur le verrin du shutter Xline dans la casemate

9h45: le klystron ne passe pas en HV, gros problème de perverance aussi (impossiblde de passer à 1215V)

** Le générateur rigol ne répond plus ==> adresse IP fausse (anciennement celle de camera sst spare) ==> rigol en DHCP nom reseau "dephaseur-sy" = "192.168.229.164"

** Cavité FP instable gros délock ==> impossible de faire le programme de shift.

** Problème de delock visible sur l'accéléromètre ==> travaux devant sciences ACO totalement corrélé avec les délock. 

18h Stop ThomX

  1193   Tue Feb 17 07:48:24 2026 MJ, KD,VM,IC, RC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 17 fevrier 2026 

7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

Le cyclage de RI-C1/QP.08, RI-C1/QP.11 et RI-C2/QP.03 ne démarre pas tout seul (action nécessaire sur le boutton cyclage de l'élément).

Programme - Etude "IP dromadaire" ==> Scan pos horizontale FPC + phase 

Positions FENTES2/HEXA des 2 derniers shifts :
    Pos FENTE2 :    [H , V]  = [-3 , -10.20]
    Pos HEXA ech : [Tx , Ty] = [+79 , +31]

10h00 Beam is in the ring W/O RF, -120 pC, receipt saved: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt on the base of reference for 50 MeV

recipe_recipe_LI_TL_straight_all_20260217_10_08_07.txt for the linac and the TL stright part

RF 100 kV phase -48.5 dg.

10h35 Standby, Changing the FPC controller

11h23 HV is on

11h40 RCDSon injection

11h59 RF gun phase 23 dg., Sect. Att. 2.39 dB, Phase 230 dg., Charges: (ICT) from -120 to 140 pc, (BPMs) -137, -137, 137, 137 pC

tunes: H 0.166, V 0.71

12h26 tunes: H 0.167, V 0.72. MRSV size is very sensetive to injection settings

At around 2:45 p.m., the power to the ring dipole went out.

16h42 RF 280 kV, phase -50 dg. Streak camera measurements for 100 kV and 280 kV

Orbit bump to change orbit tilt around IP

18h59 Stop ThomX

 

 

 

Attachment 1: Screenshot_from_2026-02-17_13-06-31.png
Screenshot_from_2026-02-17_13-06-31.png
Attachment 2: Screenshot_from_2026-02-17_13-06-18.png
Screenshot_from_2026-02-17_13-06-18.png
Attachment 3: Screenshot_from_2026-02-17_12-48-03.png
Screenshot_from_2026-02-17_12-48-03.png
Attachment 4: Screenshot_from_2026-02-17_12-47-33.png
Screenshot_from_2026-02-17_12-47-33.png
Attachment 5: Screenshot_from_2026-02-17_12-47-04.png
Screenshot_from_2026-02-17_12-47-04.png
Attachment 6: Screenshot_from_2026-02-17_12-37-42.png
Screenshot_from_2026-02-17_12-37-42.png
Attachment 7: Screenshot_from_2026-02-17_18-30-41.png
Screenshot_from_2026-02-17_18-30-41.png
Attachment 8: Screenshot_from_2026-02-17_18-29-37.png
Screenshot_from_2026-02-17_18-29-37.png
Attachment 9: Screenshot_from_2026-02-17_18-03-02.png
Screenshot_from_2026-02-17_18-03-02.png
Attachment 10: Screenshot_from_2026-02-17_18-02-44.png
Screenshot_from_2026-02-17_18-02-44.png
  1194   Wed Feb 18 07:40:44 2026 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 18 février 2026 

7h40: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

8h40 HV ON

10h20 recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt saved ,

15h15 Li/ps/str03-V steers the beam verticaly "-" UP, "+" Down. Li/ps/str03-H steers the beam horizontaly, "+" <==, "-" ==>
16h44 Laser new position : [5.112, 4.423]

Align QP-Linac
Quad scans : depends on camera settings ...

Sole Emit_X betaX AlphaX Emit_Y BetaY AlphaY Camera Sole0 File Charge (pC) retard rem
230 1.31 13.8 -5.01 1.31 4.1 -1.5 0dB 66.47 Scan_QP0117h01.txt 110 10% check energy
235 1.57 11 -3.15 2.02 7.4 -2     Scan_QP0117h12.txt 110 10%  
240 2.61 11.7 -2.83 5.52 10.6 -2.7     Scan_QP0117h16.txt 110 10%  
245 2.06 46.9 -9.49 12.3 19.8 -3.98     Scan_QP0117h21.txt 110 10%  
230 1.29 7 -2.5 1.23 8.5 -2.5   0 Scan_QP0117h27.txt 110 10%  
230 1.65 12.1 -4.46 1.26 4 -1.58   100 Scan_QP0117h32.txt 110 10%  
250 11.61 39.3 -6.82 23.7 30.3 -4.53     Scan_QP0117h40.txt 110 10%  
242 2.3 28.4 -5.82 6.7 20.8 -4.26     Scan_QP0117h48.txt 110 10%  
241 1.99 21.3 -4.49 5.34 14.7 -3.14     Scan_QP0117h52.txt 110 10%  
238 1.57 12.1 -2.8 2.32 16.7 -4.21     Scan_QP0117h57.txt 110 10%  
243 3.63 18.4 -3.64 9.31 18.6 -4.09     Scan_QP0118h01.txt   10%  
230 2.41 25.2 -7.37 2.2 9.3 -3.24     Scan_QP0118h31.txt 230 350 check energy
242 3.51 15.1 -3.15 5.28 20.2 -4.63     Scan_QP0118h43.txt 110 350 check energy
245 5.85 16.7 -3.51 9.21 23 -4.64     Scan_QP0118h55.txt 110 350 check energy
248 20.5 20 -2.85 35 14.7 -2.4     Scan_QP0119h05.txt   350 check energy

Matching from calculated twiss in attached file.  

19:10 : End

Attachment 1: Quads_settings_after_match.md
# results 


twiss_sol_238A = [238,	1.57,	12.1,	-2.8,	2.32,	16.7,	-4.21]
501.195567934739
--------------------------------------------------
QP1L: -0.571358 [1/m^2]  	: -0.199962 [A]
QP2L: 10.641153 [1/m^2]  	: 3.724162 [A]
QP3L: -10.152380 [1/m^2]  	: -3.553103 [A]
QP4L: 6.461255 [1/m^2]  	: 2.261293 [A]
QP5L: 5.038224 [1/m^2]  	: 1.763264 [A]
QP6L: -10.700303 [1/m^2]  	: -3.744863 [A]
QP7L: 11.202321 [1/m^2]  	: 3.920559 [A]
--------------------------------------------------

twiss_sol_241A = [241,	1.99,	21.3,	-4.49,	5.34,	14.7,	-3.14]
212.779196267011
--------------------------------------------------
QP1L: -0.676645 [1/m^2]  	: -0.236810 [A]
QP2L: 10.589814 [1/m^2]  	: 3.706195 [A]
QP3L: -10.037038 [1/m^2]  	: -3.512736 [A]
QP4L: 6.543804 [1/m^2]  	: 2.290183 [A]
QP5L: 4.594024 [1/m^2]  	: 1.607804 [A]
QP6L: -10.602366 [1/m^2]  	: -3.710588 [A]
QP7L: 11.029235 [1/m^2]  	: 3.859982 [A]
--------------------------------------------------

twiss_sol_242A = [242,	2.3,	28.4,	-5.82,	6.7,	20.8,	-4.26]
16.3756129570483
--------------------------------------------------
QP1L: -0.678931 [1/m^2]  	: -0.237610 [A]
QP2L: 10.626355 [1/m^2]  	: 3.718983 [A]
QP3L: -10.001212 [1/m^2]  	: -3.500198 [A]
QP4L: 6.097615 [1/m^2]  	: 2.134027 [A]
QP5L: 5.211973 [1/m^2]  	: 1.824073 [A]
QP6L: -10.599792 [1/m^2]  	: -3.709687 [A]
QP7L: 10.926141 [1/m^2]  	: 3.823902 [A]
--------------------------------------------------

twiss_sol_243A = [243,	3.63,	18.4,	-3.64,	9.31,	18.6,	-4.09]
213.7927216092
--------------------------------------------------
QP1L: -1.332854 [1/m^2]  	: -0.466469 [A]
QP2L: 11.117187 [1/m^2]  	: 3.890763 [A]
QP3L: -10.018546 [1/m^2]  	: -3.506264 [A]
QP4L: 6.529993 [1/m^2]  	: 2.285350 [A]
QP5L: 4.802777 [1/m^2]  	: 1.680863 [A]
QP6L: -10.598775 [1/m^2]  	: -3.709331 [A]
QP7L: 11.006478 [1/m^2]  	: 3.852018 [A]
--------------------------------------------------

twiss_sol_245A = [245,	2.06,	46.9,	-9.49,	12.3,	19.8,	-3.98]
16.2164771100199
--------------------------------------------------
QP1L: -0.034446 [1/m^2]  	: -0.012055 [A]
QP2L: 9.847129 [1/m^2]  	: 3.446272 [A]
QP3L: -9.925618 [1/m^2]  	: -3.473741 [A]
QP4L: 6.561442 [1/m^2]  	: 2.296356 [A]
QP5L: 4.364315 [1/m^2]  	: 1.527411 [A]
QP6L: -10.231645 [1/m^2]  	: -3.580844 [A]
QP7L: 10.300960 [1/m^2]  	: 3.605102 [A]
--------------------------------------------------

twiss_sol_250A = [250,  11.61,	39.3,	-6.82,	23.7,	30.3,	-4.53]
3.98731082591887e-25
--------------------------------------------------
QP1L: -0.608052 [1/m^2]  	: -0.212804 [A]
QP2L: 10.306778 [1/m^2]  	: 3.607139 [A]
QP3L: -9.771682 [1/m^2]  	: -3.419867 [A]
QP4L: 5.967327 [1/m^2]  	: 2.088429 [A]
QP5L: 5.730826 [1/m^2]  	: 2.005659 [A]
QP6L: -10.333723 [1/m^2]  	: -3.616569 [A]
QP7L: 10.187679 [1/m^2]  	: 3.565457 [A]
--------------------------------------------------

## 230A with 230 pC beam charge 
twiss_sol_230A = [230,	2.41,	25.2,	-7.37,	2.2, 	9.3,	-3.24]
145.837228842677
--------------------------------------------------
QP1L: 1.235475 [1/m^2]  	: 0.432388 [A]
QP2L: 9.136295 [1/m^2]  	: 3.197496 [A]
QP3L: -10.228027 [1/m^2]  	: -3.579578 [A]
QP4L: 6.452841 [1/m^2]  	: 2.258348 [A]
QP5L: 4.641590 [1/m^2]  	: 1.624451 [A]
QP6L: -10.595351 [1/m^2]  	: -3.708133 [A]
QP7L: 11.006418 [1/m^2]  	: 3.851997 [A]

twiss_sol_242AN = [242,	3.51,	15.1,	-3.15,	5.28,	20.2,	-4.63]
285.154176153533
--------------------------------------------------
QP1L: -1.846704 [1/m^2]  	: -0.646304 [A]
QP2L: 11.594649 [1/m^2]  	: 4.057864 [A]
QP3L: -10.034874 [1/m^2]  	: -3.511978 [A]
QP4L: 6.563675 [1/m^2]  	: 2.297137 [A]
QP5L: 4.874020 [1/m^2]  	: 1.705797 [A]
QP6L: -10.616160 [1/m^2]  	: -3.715415 [A]
QP7L: 11.041865 [1/m^2]  	: 3.864402 [A]
--------------------------------------------------
  Draft   Thu Feb 19 07:32:42 2026 KD, VM, RC, MJ, IC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 19 fevrier 2026 

7h30: mise en chauffe en remote (chillers/frigo, modulateur, laser, cyclage)

08h55 HV is ON

09h29 Beam is in the ring W/O RF. the receipt loaded:  recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt (big bump verticaly around IP)

09h30 RF 50 kV, cavity is tuning (to far)

09h41 RF ==> 100 kV. RF Gun phase 21 dg., Sect. att. 2.36 dB, secr. phase 216 dg.  Charges: (ICT) about -100 pC, (BPMs): -115, -110, -134, -115 pC, Linac steerers: H [-0.16 -2.76 0], V [-2.35 3.31 0]

RF ==> 150 kV, ==> 280 kV

09h59 the receipt loaded: recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt (with small angles around IP)

12h50 receipt loaded: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt

16h01 recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt loaded (see screenshot)

17h25 Stop ThomX

Attachment 1: Screenshot_from_2026-02-19_16-50-44.png
Screenshot_from_2026-02-19_16-50-44.png
Attachment 2: Screenshot_from_2026-02-19_16-03-44.png
Screenshot_from_2026-02-19_16-03-44.png
Attachment 3: Screenshot_from_2026-02-19_16-03-32.png
Screenshot_from_2026-02-19_16-03-32.png
  1199   Wed Feb 25 07:29:16 2026 KD MJ DN VK ICUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning 25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT 

7h30: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

*** Programme *** : 
          - Check spectres OnAxis, V+25 et V+40 apres resistances dipole installe hier soir
   (pas fait)
          - Alignement et 1ere prise d'image TRANSFOCATEUR sur orbite de référence              (fait)

8h30 : on charge la recette "all_20260224_14_54_20"

Flux tres bas (3000-4000)

Adjustement chroma ==> Recette 20260224_15_49_43_adjust_chroma

     Flux toujours tres bas :      3000-4000 ph/s
     Taille verticale scan FPC   230um RMS
     Streak :                              240 ps

     On ne peut pas demarrer le shift

16h16 Several recipes were saved with adjusted settings for the linac and ring orbit. Flux I3+I4 riched of 20000 pA, but they became unusable after a few minutes due to instability.

17h36 Receipt recipe_recipe_LI_TL_RI_all_20260225_17_33_57.txt saved with comment: 20260225_for_transfocator_align
Recipe saved in References recipes : Transfocator_20260225_17_33_57.txt
Alignement transfocateur et Prise d'image - Racks in/out

----------------------------------------------------------

Code redpit phase laser a change
il reste a redemarrer la carte

 

  1213   Tue Mar 17 08:07:49 2026 KD MJ RC DN VKUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 

8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

*** programme : Mesures : sol 230 100 pC

- Taille vert. e- (FPC)   ==> FAIT        (sigma = 110 um RMS stat / 102 um gauss)      --> Taille ele V = 85 um

- Spectre angulaire sur 6-7 mrad ==> FAIT
     
 Carre de 30 x 30 mm autour de l'OnAxis a l'oeil : ouverture fente2 0.3x0.3 mm
       Au dela : ouverture fente2 0.4 x 0.4 mm

- Diode_Calib (flux On-Axis) - PAS fait (I3 et I4 suffisent)

- Taille_Source photonic  ==> FAIT  - DISTANCE Hexa_ech - Photonic = 43 cm
       
LSF [V , H] = [135 , 52] um
       LSF [V , H] = [136 , 53] um   
    --> Taille ele [H , V] = [143 , 81] um

- Longueur e-  ==> FAIT                      ~ 100 ps au debut,  200 ps end (fwhm) ==> 85 ps RMS

- Emitt_Linac (QuadScan Q1) - PAS fait, les mesures emittances sont chaque fois de l'ordre de  2-3 mm.mrad ...

     - Puissance FPC ~ 85 kW
     - Flux : I3+I4 ~ 15000 - 18000 ==> 1.1 - 1.3 10^10 ph/s

 

=================================

09h09 HV is on

09h41 recipe_recipe_LI_TL_RI_all_20260311_13_12_06.txt loaded, linac steerers adjusted. Beam in the ring W/O RF, ring saved 

09h49 RF 100 kV phase -42 dg. Charges around -100 pC, RF gun phase 172 dg., Sect. att. 2.4 dB , phase 224 dg. linac steerers: H [-0.2 -2.72], V [-2.54 3.14]

 

  1214   Wed Mar 18 07:58:19 2026 KD, VM, MJ, RC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 18 mars 2026 

8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

*** Programme : Mesure spectre et monochromateur à 61.5MeV (70MeV si le temps le permet)

61.5 MeV

09h35 HV is on
photocathod laser phase 62 dg.  The receipt 61p5MeV_20250703_12_56_55.txt loaded, going to 61.5 MeV (interlocks)
10h13 Beam is on TL/SST02. Sect. att. 0.992 dB, sect. phase 236 dg.
10h30 Aligned with QP1 - QP3, linac steerers: H [-0.2 -3.02], V [-2.55 3.22]
11h05 Beam is in the ring W/O RF with all ring correctors set to zero

RF 100 kV storage is good, but can't correct the orbit  at 61.5 MeV :  le faisceau est presque hors du tube ==> Try to go to 70 MeV

70 MeV

13h20 RF processing the section on 25 pps by increasing pulse length from 1 us to 3 us
13h56 70 MeV, Linac steerers H [0.21 -3.75], V [-2.84 3.33], sect. att 0.18, phase 255 dg. laser phase 56 dg. (On the base of 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt)
16h17 recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt saved, screenshots, RF 100 kV, phase -36 dg., Freq. 500.031645 MHz

L'orbite n'est pas la meme que pour 50 MeV  ==> Checks spectres dromadaires a V+40 

X_fpc = -1.5 / -1.3 / -1.7 / -1.9 / -1.1  mais on a oublie d'ajuster la phase a chaque fois  .... meme phase (3.0 V) 
X_fpc = -0.9 / -0.7 / -0.4 / -0.2 / -0.5  en ajustant la phase a chaque fois
Cf les 2 screenshots "Spectre 70 MeV"

On se place a X_fpc = -1 mm (pas top mais dans l'urgence on se met la)

Fente2 centrees a l'oeil : [H , V] = [11 , -23]
Prise de spectres a +/- 10 en H et V  (a voir ce que ca donne offline)

17h56 ThomX was stopped

Attachment 1: Screenshot_from_2026-03-18_17-43-17.png
Screenshot_from_2026-03-18_17-43-17.png
Attachment 2: Screenshot_from_2026-03-18_17-32-49.png
Screenshot_from_2026-03-18_17-32-49.png
Attachment 3: Screenshot_from_2026-03-18_17-32-38.png
Screenshot_from_2026-03-18_17-32-38.png
Attachment 4: Screenshot_from_2026-03-18_16-11-25.png
Screenshot_from_2026-03-18_16-11-25.png
Attachment 5: Orbite_2026-03-18_16-10-25.png
Orbite_2026-03-18_16-10-25.png
Attachment 6: Screenshot_from_2026-03-18_17-45-25.png
Screenshot_from_2026-03-18_17-45-25.png
Attachment 7: spectres_70_MeV.png
spectres_70_MeV.png
Attachment 8: spectres_70_MeV_2.png
spectres_70_MeV_2.png
  Draft   Tue Mar 24 08:10:35 2026 KD, VM, MJ, RCUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 24 mars 2026 

8h05 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

09h17 HV is ON

11h36 Mod. on standby

13h16: Mod Trig

13h40: Mod Standby impossible de locker la cavite CFP. ==> arret du shift ==> Hayg prend la machine

 

 

Attachment 1: HorOrbit_vs_Att.png
HorOrbit_vs_Att.png
  1220   Fri Mar 27 07:41:15 2026 MJ KD IC VM DN RCFixedShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE 70 MeV - 27 mars 2026 

** Programme : Energy-Angle 70 MeV

7h40 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON

==> 70 MeV. F=500.031645 MHz

recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted

11h42 Laser Phase 53.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.177 dB, I_Gun -91.5849 pC, I_Linac -135.8848 pC, I_TL -118.0054 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.

Orbite IP differente de 70 MeV semaine derniere
12h30 Iryna vient en sdc pour retablir l'orbite IP de reference

15h44 Laser Phase 41.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.122 dB, I_Gun -90.9101 pC, I_Linac -134.7212 pC, I_TL -115.0435 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
17h23 Laser Phase 42.3 dg., Sect. Phase 256 dg., Sect. Att. 0.176 dB, I_Gun -89.6772 pC, I_Linac -133.3612 pC, I_TL -113.6226 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.

** On-axis a l'oeil

** Check dromadaires

Pas tres bon ==>  Deplacement Horiz table FPC de -1.6 a -1.9 ==> On ne trouve rien de tres bon ... On se place a -1.9 mm (cf screenshot droma_70MeV) 

** Prise de spectres autour de -20/20 en H et V

** Long paquet : ~ 83 ps FWHM ==> 35 ps RMS

** Mesure taille de source X :

LSF [V , H] = [137 , 51]  (image 1000ms0004)  ==> e- [H , V] = [190 , 74]
LSF [V , H] = [142 , 50]  (image 1000ms0005)         e- [H , V] = [204 , 71]
LSF [V , H] = [136 , 53]  (image 700ms0003)           e- [H , V] = [187 , 81]
LSF [V , H] = [141 , 52]  (image 700ms0002)           e- [H , V] = [201 , 78]
LSF [V , H] = [137 ,56 ]  (image 400ms0007)           e- [H , V] = [190 , 93]
LSF [V , H] = [137 , 56]  (image 400ms0006)           e- [H , V] = [190 , 93]

** ENERGY-ANGLE prise de donnees (scan de spectres +40/-30 Horiz - +40/-40 Vert) 

22h30: Stop ThomX, spectrum for 70MeV acquired

Attachment 1: droma_70_MeV.png
droma_70_MeV.png
  Draft   Tue Mar 31 07:56:57 2026 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 31 mars 2026 

7h55 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

==> vérifier la pression SF6 avant de commencer.  2461mB

HV On

10h05 Laser Phase 29.2269 dg., Sect. Phase 256 dg., Sect. Att. 0.15 dB, I_Gun -107.4324 pC, I_Linac -149.9747 pC, I_TL -133.2527 pC RF_Ampl. 99.1569 kV, RF_Phase -60.51 dg.

15h39 ==> 61.5 MeV, F=500.034945  MHz, Sect Att. 1.00 dB, phase 240. dg.

6h03 Laser Phase 27.2 dg., Sect. Phase 240 dg., Sect. Att. 0.981 dB, I_Gun -110.9555 pC, I_Linac -155.372 pC, I_TL -135.7899 pC RF_Ampl. 99.1184 kV, RF_Phase -47.91 dg.

17h54 ThomX was sopped

 

 

  1223   Wed Apr 1 07:45:03 2026 KD MJ RC DN VKUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning 1e avril 2026 - Scan Energy-Angle 61.5 MeV 

7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

==> SF6 à remplir avant démarrage. 2.805 bar

09h04 HV is ON
11h34 Laser Phase 91.1 dg., Sect. Phase 244 dg., Sect. Att. 0.937 dB, I_Gun -93.1422 pC, I_Linac -136.692 pC, I_TL -117.2003 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.
16h09 Laser Phase 93.1 dg., Sect. Phase 244 dg., Sect. Att. 1.027 dB, I_Gun -98.4828 pC, I_Linac -140.6614 pC, I_TL -121.8007 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.

** Recherche meilleur point d'interaction

Mouvement horiz table FPC + orbite e- differentes
Prise spectres a V +40
==> rien de concluant

On se place a Y_fpc = -1.7 mm - Orbite electron cf screenshot - Faisceau a peu pres centre dans le tube X

** Scan spectre ENERGY-ANGLE 61.5 MeV

Fente2 centrees [Hpos Vpos] = [-13 , -14]

 

Fin de shift 19h45

Attachment 1: orbite_61p5_MeV_2026-04-01_19-24-56.png
orbite_61p5_MeV_2026-04-01_19-24-56.png
  51   Thu Jul 15 12:39:56 2021 Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021Reference SolutionInfoOpt | Linac Commissionning Alignement PhotoCathode 

L'alignement de la PhotoCatode est fini. Il est a noter :

- La position de la camera a ete ajuste pour mieux coller a la distance entre PhotoCathode et miroir de prelevement (pour la cathode virtuelle). Cette distance est d'environ 215.5 cm.

- le tube a vide d'entre du laser dans le linac a ete retire pour s assurer de l alignement du laser sur le miroir sous vide. Le faisceau est centre en transverse et legerement au dessus de l horizontal en vertical (<3/4 du miroir environ)

- L'image de reference de l'alignement Photocathode est en piece jointe. Le faisceau est centre sur la camera.

- les alignement ont ete revu au niveau de la table de la casemate pour reduire le vignetage

- L'energie UV en sortie du laser etait de 140uJ environ.

 

Point a faire et a surveiller :

- Il faut remettre le tube d'injection et passer sous vide

- Il faut mesurer la puissance laser sur la table optique dans la casemate

- le shutter de securite semble disfonction en mode local. Il y a une repercution sur le PSS (defaut a aquitter)

- L'attenuateur ne semble pas tourner.

 

Attachment 1: Image__2021-07-15__12-34-45_PCVirtuelle.bmp