1033
|
Wed Mar 12 07:52:55 2025 |
KD, VM, MJ, DN, RC, IC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 12 mars 2025 | | 7h50 : mise en chauffe machine (modulateur, frigo/chillers, laser, cyclage aimants)
**** Programme de la journée ****
- Mesure spectre angulaire (déplacement spectromètre dans le faisceau de rayons-X)
- Mesure spectre sur l'axe à différentes longueur de stockage
12h38 Beam is in the ring. X ray spectrum measurements. Parameters:
RF gun phase is 103 dg., Sect phase is 219 dg., Att. is 2.499 dB, TL/BPM2 X=+3 mm, Charges; -106 pC, -103 pC,-114 pC, the ring RF 150 kV, Phase -13 dg.
12h45 Vacuum interlock V1
13h12 RF gun phase is 97 dg., Sect phase is 212 dg., Att. is 2.449 dB, TL/BPM2 X=+3 mm, Charges; -104 pC, -105 pC,-115 pC, the ring RF 150 kV, Phase -13 dg. TBTSum=1.4e11 |
|
1051
|
Thu Apr 3 09:08:03 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 3 avril 2025 | | 9h: mise en chauffe machine en remote (Modulateur, frigo/chiller, laser, cyclage aimants). |
|
1086
|
Wed Jun 11 08:12:28 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 11 juin 2025 | | 8h10: mise en chauffe à distance (modulateur, frigo/chiller, cyclage aimant, laser)
Programme: Nouvelle prise de donnees Spectres Echantillon Bazin |
|
1096
|
Tue Jul 1 08:15:08 2025 |
KD MJ VC DN RC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 01 juillet 2025 | | 8h15: mise en chauffe distance (chiller/frigo, modulateur, laser, cyclage)
9h45: modulateur ok
Attenuateur laser à 270 => Qict1 = 100pC
iris 1.3mm
recette "50MHz flat"
optimisation Qpole LI (scrip spider)
faire un reset ckiker extraction en local
asservissemnt phase Laser PC Li 500MHz on
asservissemnent position injection linac (script spider) (cd /data/shared/commissioning_scripts/Linac/Alignements/python ./feedback_linac_injection.py )
injection dans l'anneau avec FBL power RF 150KV
diag :
192.1668.229.22 perte injection
taurusplot r1-c2/dg/BPM.03-li
Avec recette FLAT et FPC 21 kW - 50 MeV
Mesures
** flux diode calib
signal tres bruite (pas possible d'entrer dans la X-hutch pour checker connexion car shutter bloque ouvert pb PSS)
** spectre : toujours pas de procedure pour trouver le on-axis ... Simu pour comprendre
** taille source fente 1 + photonic (image MRSV prise pour comparaison)
|
| Attachment 1: orbit_recette_flat.png
|  |
|
1098
|
Thu Jul 3 08:06:05 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 03 juillet 2025 | | 8h05: mise en chauffe en remote (frigo/chiller, laser, modulateur, cyclage)
9h: problème avec le DEG04 (pas de trig), la lumière de la PLL est rouge (post synchro) ==> il faut redémarrer et réactiver les voies en "EXT" via l'interface web (interface IHM ne fonctionne pas) (IP: 192.168.229.124)
Attention changement de fréquence 500MHz ring => changement de phase 33MHz obligatoire pour pas avoir de saute de synchro(spider Write_Phase RIGOL_33MHz.py)
10h :
- Chargement de la recette "/data/shared/recipes/saved/References/61p5MeV_20250331_18_08_02.txt"
- ajustement atténuation (1.07dB)
- alignement dans les quads
- injection dans l'anneau immédiate ==> tune de la phase au déphaseur phase RF manuelle, on passe de 449X° à 344X°
11h: injection dans la ligne d'extraction (le kicker semble ne pas sauter), gros bruit au niveau de SpX de EL/BPM.01 ==> mise à jour recette 61.5MeV dans le dossier de référence
12h: ajustement de la CFP ==> il y a des rayons X
- prise de spectre
- prise image pour mesure de taille faisceau
*** programme ***
test rayons X à 70keV (61.5MeV)
|
| Attachment 1: 2025-07-03_12_56_24_el_dg_sst_01-ccd_01_RAW.png
|  |
| Attachment 2: 2025-07-03_10_40_07_OBL_DG_MRSV_01-CCD_01_RAW_0.png
|  |
| Attachment 3: spectre_70keV.bmp
|
|
1100
|
Mon Jul 7 08:04:06 2025 |
KD,ND, RC,DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 07 juillet 2025 | | 8h: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
9h14: Demarrage faisceau
9h45: Faisceau dans l'anneau
Efficacite stockage anneau: 98%
10h20: Optimisation retard kicker ext: -7.5610
10h30: Insertion fentes TL/DG/SRH
Position sans affecter le faisceau dans l' anneau: 19.5mm / 24mm
12h18: Acces pour reinitialiser un controleur de moteur.
12h30 Redemarrage
14h37 Reprise de la phase RF vs laser
??? Stop ThomX
**** Programme ****
1) Prise de données rayons X pour manip de dosimétrie (61.5MeV) |
|
1103
|
Thu Jul 17 08:08:41 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 17 juillet 2025 | | 8h05 : mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)
*** Programme ***
- prise de spectre fluorescence (échantillon prostate) et amélioration du setup (réduction du bruit de fond)
==> Fait, montage avec du plomb meilleur et faisceau collimé dans le cone en plomb
- mise en place de la diode Calibrée "sans" bruit (écran alu)
==> pas eu le temps de progresser sur ce point |
|
1121
|
Tue Sep 16 12:11:42 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 16 septembre 2025 | | 12h: mise en chauffe (modulateur, frigo/chiller, laser, cyclage)
==> plantage IHM cyclage (2fois)
12h15: Stop machine ==> pas besoin pour la CFP
*** Programme CFP *** |
|
1130
|
Tue Sep 30 08:41:41 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 30 septembre 2025 | | 8h40: mise en chauffe en remote (frigo/chiller, modulateur, laser)
9h30: ajout de graisse sur le verrin du shutter Xline dans la casemate
9h45: le klystron ne passe pas en HV, gros problème de perverance aussi (impossiblde de passer à 1215V)
** Le générateur rigol ne répond plus ==> adresse IP fausse (anciennement celle de camera sst spare) ==> rigol en DHCP nom reseau "dephaseur-sy" = "192.168.229.164"
** Cavité FP instable gros délock ==> impossible de faire le programme de shift.
** Problème de delock visible sur l'accéléromètre ==> travaux devant sciences ACO totalement corrélé avec les délock.
18h Stop ThomX |
|
1193
|
Tue Feb 17 07:48:24 2026 |
MJ, KD,VM,IC, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 17 fevrier 2026 | | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
Le cyclage de RI-C1/QP.08, RI-C1/QP.11 et RI-C2/QP.03 ne démarre pas tout seul (action nécessaire sur le boutton cyclage de l'élément).
Programme - Etude "IP dromadaire" ==> Scan pos horizontale FPC + phase
Positions FENTES2/HEXA des 2 derniers shifts :
Pos FENTE2 : [H , V] = [-3 , -10.20]
Pos HEXA ech : [Tx , Ty] = [+79 , +31]
10h00 Beam is in the ring W/O RF, -120 pC, receipt saved: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt on the base of reference for 50 MeV
recipe_recipe_LI_TL_straight_all_20260217_10_08_07.txt for the linac and the TL stright part
RF 100 kV phase -48.5 dg.
10h35 Standby, Changing the FPC controller
11h23 HV is on
11h40 RCDSon injection
11h59 RF gun phase 23 dg., Sect. Att. 2.39 dB, Phase 230 dg., Charges: (ICT) from -120 to 140 pc, (BPMs) -137, -137, 137, 137 pC
tunes: H 0.166, V 0.71
12h26 tunes: H 0.167, V 0.72. MRSV size is very sensetive to injection settings
At around 2:45 p.m., the power to the ring dipole went out.
16h42 RF 280 kV, phase -50 dg. Streak camera measurements for 100 kV and 280 kV
Orbit bump to change orbit tilt around IP
18h59 Stop ThomX
|
| Attachment 1: Screenshot_from_2026-02-17_13-06-31.png
|  |
| Attachment 2: Screenshot_from_2026-02-17_13-06-18.png
|  |
| Attachment 3: Screenshot_from_2026-02-17_12-48-03.png
|  |
| Attachment 4: Screenshot_from_2026-02-17_12-47-33.png
|  |
| Attachment 5: Screenshot_from_2026-02-17_12-47-04.png
|  |
| Attachment 6: Screenshot_from_2026-02-17_12-37-42.png
|  |
| Attachment 7: Screenshot_from_2026-02-17_18-30-41.png
|  |
| Attachment 8: Screenshot_from_2026-02-17_18-29-37.png
|  |
| Attachment 9: Screenshot_from_2026-02-17_18-03-02.png
|  |
| Attachment 10: Screenshot_from_2026-02-17_18-02-44.png
|  |
|
1194
|
Wed Feb 18 07:40:44 2026 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 février 2026 | | 7h40: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
8h40 HV ON
10h20 recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt saved ,
15h15 Li/ps/str03-V steers the beam verticaly "-" UP, "+" Down. Li/ps/str03-H steers the beam horizontaly, "+" <==, "-" ==>
16h44 Laser new position : [5.112, 4.423]
Align QP-Linac
Quad scans : depends on camera settings ...
| Sole |
Emit_X |
betaX |
AlphaX |
Emit_Y |
BetaY |
AlphaY |
Camera |
Sole0 |
File |
Charge (pC) |
retard |
rem |
| 230 |
1.31 |
13.8 |
-5.01 |
1.31 |
4.1 |
-1.5 |
0dB |
66.47 |
Scan_QP0117h01.txt |
110 |
10% |
check energy |
| 235 |
1.57 |
11 |
-3.15 |
2.02 |
7.4 |
-2 |
|
|
Scan_QP0117h12.txt |
110 |
10% |
|
| 240 |
2.61 |
11.7 |
-2.83 |
5.52 |
10.6 |
-2.7 |
|
|
Scan_QP0117h16.txt |
110 |
10% |
|
| 245 |
2.06 |
46.9 |
-9.49 |
12.3 |
19.8 |
-3.98 |
|
|
Scan_QP0117h21.txt |
110 |
10% |
|
| 230 |
1.29 |
7 |
-2.5 |
1.23 |
8.5 |
-2.5 |
|
0 |
Scan_QP0117h27.txt |
110 |
10% |
|
| 230 |
1.65 |
12.1 |
-4.46 |
1.26 |
4 |
-1.58 |
|
100 |
Scan_QP0117h32.txt |
110 |
10% |
|
| 250 |
11.61 |
39.3 |
-6.82 |
23.7 |
30.3 |
-4.53 |
|
|
Scan_QP0117h40.txt |
110 |
10% |
|
| 242 |
2.3 |
28.4 |
-5.82 |
6.7 |
20.8 |
-4.26 |
|
|
Scan_QP0117h48.txt |
110 |
10% |
|
| 241 |
1.99 |
21.3 |
-4.49 |
5.34 |
14.7 |
-3.14 |
|
|
Scan_QP0117h52.txt |
110 |
10% |
|
| 238 |
1.57 |
12.1 |
-2.8 |
2.32 |
16.7 |
-4.21 |
|
|
Scan_QP0117h57.txt |
110 |
10% |
|
| 243 |
3.63 |
18.4 |
-3.64 |
9.31 |
18.6 |
-4.09 |
|
|
Scan_QP0118h01.txt |
|
10% |
|
| 230 |
2.41 |
25.2 |
-7.37 |
2.2 |
9.3 |
-3.24 |
|
|
Scan_QP0118h31.txt |
230 |
350 |
check energy |
| 242 |
3.51 |
15.1 |
-3.15 |
5.28 |
20.2 |
-4.63 |
|
|
Scan_QP0118h43.txt |
110 |
350 |
check energy |
| 245 |
5.85 |
16.7 |
-3.51 |
9.21 |
23 |
-4.64 |
|
|
Scan_QP0118h55.txt |
110 |
350 |
check energy |
| 248 |
20.5 |
20 |
-2.85 |
35 |
14.7 |
-2.4 |
|
|
Scan_QP0119h05.txt |
|
350 |
check energy |
Matching from calculated twiss in attached file.
19:10 : End |
| Attachment 1: Quads_settings_after_match.md
|
# results
twiss_sol_238A = [238, 1.57, 12.1, -2.8, 2.32, 16.7, -4.21]
501.195567934739
--------------------------------------------------
QP1L: -0.571358 [1/m^2] : -0.199962 [A]
QP2L: 10.641153 [1/m^2] : 3.724162 [A]
QP3L: -10.152380 [1/m^2] : -3.553103 [A]
QP4L: 6.461255 [1/m^2] : 2.261293 [A]
QP5L: 5.038224 [1/m^2] : 1.763264 [A]
QP6L: -10.700303 [1/m^2] : -3.744863 [A]
QP7L: 11.202321 [1/m^2] : 3.920559 [A]
--------------------------------------------------
twiss_sol_241A = [241, 1.99, 21.3, -4.49, 5.34, 14.7, -3.14]
212.779196267011
--------------------------------------------------
QP1L: -0.676645 [1/m^2] : -0.236810 [A]
QP2L: 10.589814 [1/m^2] : 3.706195 [A]
QP3L: -10.037038 [1/m^2] : -3.512736 [A]
QP4L: 6.543804 [1/m^2] : 2.290183 [A]
QP5L: 4.594024 [1/m^2] : 1.607804 [A]
QP6L: -10.602366 [1/m^2] : -3.710588 [A]
QP7L: 11.029235 [1/m^2] : 3.859982 [A]
--------------------------------------------------
twiss_sol_242A = [242, 2.3, 28.4, -5.82, 6.7, 20.8, -4.26]
16.3756129570483
--------------------------------------------------
QP1L: -0.678931 [1/m^2] : -0.237610 [A]
QP2L: 10.626355 [1/m^2] : 3.718983 [A]
QP3L: -10.001212 [1/m^2] : -3.500198 [A]
QP4L: 6.097615 [1/m^2] : 2.134027 [A]
QP5L: 5.211973 [1/m^2] : 1.824073 [A]
QP6L: -10.599792 [1/m^2] : -3.709687 [A]
QP7L: 10.926141 [1/m^2] : 3.823902 [A]
--------------------------------------------------
twiss_sol_243A = [243, 3.63, 18.4, -3.64, 9.31, 18.6, -4.09]
213.7927216092
--------------------------------------------------
QP1L: -1.332854 [1/m^2] : -0.466469 [A]
QP2L: 11.117187 [1/m^2] : 3.890763 [A]
QP3L: -10.018546 [1/m^2] : -3.506264 [A]
QP4L: 6.529993 [1/m^2] : 2.285350 [A]
QP5L: 4.802777 [1/m^2] : 1.680863 [A]
QP6L: -10.598775 [1/m^2] : -3.709331 [A]
QP7L: 11.006478 [1/m^2] : 3.852018 [A]
--------------------------------------------------
twiss_sol_245A = [245, 2.06, 46.9, -9.49, 12.3, 19.8, -3.98]
16.2164771100199
--------------------------------------------------
QP1L: -0.034446 [1/m^2] : -0.012055 [A]
QP2L: 9.847129 [1/m^2] : 3.446272 [A]
QP3L: -9.925618 [1/m^2] : -3.473741 [A]
QP4L: 6.561442 [1/m^2] : 2.296356 [A]
QP5L: 4.364315 [1/m^2] : 1.527411 [A]
QP6L: -10.231645 [1/m^2] : -3.580844 [A]
QP7L: 10.300960 [1/m^2] : 3.605102 [A]
--------------------------------------------------
twiss_sol_250A = [250, 11.61, 39.3, -6.82, 23.7, 30.3, -4.53]
3.98731082591887e-25
--------------------------------------------------
QP1L: -0.608052 [1/m^2] : -0.212804 [A]
QP2L: 10.306778 [1/m^2] : 3.607139 [A]
QP3L: -9.771682 [1/m^2] : -3.419867 [A]
QP4L: 5.967327 [1/m^2] : 2.088429 [A]
QP5L: 5.730826 [1/m^2] : 2.005659 [A]
QP6L: -10.333723 [1/m^2] : -3.616569 [A]
QP7L: 10.187679 [1/m^2] : 3.565457 [A]
--------------------------------------------------
## 230A with 230 pC beam charge
twiss_sol_230A = [230, 2.41, 25.2, -7.37, 2.2, 9.3, -3.24]
145.837228842677
--------------------------------------------------
QP1L: 1.235475 [1/m^2] : 0.432388 [A]
QP2L: 9.136295 [1/m^2] : 3.197496 [A]
QP3L: -10.228027 [1/m^2] : -3.579578 [A]
QP4L: 6.452841 [1/m^2] : 2.258348 [A]
QP5L: 4.641590 [1/m^2] : 1.624451 [A]
QP6L: -10.595351 [1/m^2] : -3.708133 [A]
QP7L: 11.006418 [1/m^2] : 3.851997 [A]
twiss_sol_242AN = [242, 3.51, 15.1, -3.15, 5.28, 20.2, -4.63]
285.154176153533
--------------------------------------------------
QP1L: -1.846704 [1/m^2] : -0.646304 [A]
QP2L: 11.594649 [1/m^2] : 4.057864 [A]
QP3L: -10.034874 [1/m^2] : -3.511978 [A]
QP4L: 6.563675 [1/m^2] : 2.297137 [A]
QP5L: 4.874020 [1/m^2] : 1.705797 [A]
QP6L: -10.616160 [1/m^2] : -3.715415 [A]
QP7L: 11.041865 [1/m^2] : 3.864402 [A]
--------------------------------------------------
|
|
Draft
|
Thu Feb 19 07:32:42 2026 |
KD, VM, RC, MJ, IC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 19 fevrier 2026 | | 7h30: mise en chauffe en remote (chillers/frigo, modulateur, laser, cyclage)
08h55 HV is ON
09h29 Beam is in the ring W/O RF. the receipt loaded: recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt (big bump verticaly around IP)
09h30 RF 50 kV, cavity is tuning (to far)
09h41 RF ==> 100 kV. RF Gun phase 21 dg., Sect. att. 2.36 dB, secr. phase 216 dg. Charges: (ICT) about -100 pC, (BPMs): -115, -110, -134, -115 pC, Linac steerers: H [-0.16 -2.76 0], V [-2.35 3.31 0]
RF ==> 150 kV, ==> 280 kV
09h59 the receipt loaded: recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt (with small angles around IP)
12h50 receipt loaded: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt
16h01 recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt loaded (see screenshot)
17h25 Stop ThomX |
| Attachment 1: Screenshot_from_2026-02-19_16-50-44.png
|  |
| Attachment 2: Screenshot_from_2026-02-19_16-03-44.png
|  |
| Attachment 3: Screenshot_from_2026-02-19_16-03-32.png
|  |
|
1199
|
Wed Feb 25 07:29:16 2026 |
KD MJ DN VK IC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT | | 7h30: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme *** :
- Check spectres OnAxis, V+25 et V+40 apres resistances dipole installe hier soir (pas fait)
- Alignement et 1ere prise d'image TRANSFOCATEUR sur orbite de référence (fait)
8h30 : on charge la recette "all_20260224_14_54_20"
Flux tres bas (3000-4000)
Adjustement chroma ==> Recette 20260224_15_49_43_adjust_chroma
Flux toujours tres bas : 3000-4000 ph/s
Taille verticale scan FPC 230um RMS
Streak : 240 ps
On ne peut pas demarrer le shift
16h16 Several recipes were saved with adjusted settings for the linac and ring orbit. Flux I3+I4 riched of 20000 pA, but they became unusable after a few minutes due to instability.
17h36 Receipt recipe_recipe_LI_TL_RI_all_20260225_17_33_57.txt saved with comment: 20260225_for_transfocator_align
Recipe saved in References recipes : Transfocator_20260225_17_33_57.txt
Alignement transfocateur et Prise d'image - Racks in/out
----------------------------------------------------------
Code redpit phase laser a change
il reste a redemarrer la carte
|
|
1213
|
Tue Mar 17 08:07:49 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 | | 8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
*** programme : Mesures : sol 230 100 pC
- Taille vert. e- (FPC) ==> FAIT (sigma = 110 um RMS stat / 102 um gauss) --> Taille ele V = 85 um
- Spectre angulaire sur 6-7 mrad ==> FAIT
Carre de 30 x 30 mm autour de l'OnAxis a l'oeil : ouverture fente2 0.3x0.3 mm
Au dela : ouverture fente2 0.4 x 0.4 mm
- Diode_Calib (flux On-Axis) - PAS fait (I3 et I4 suffisent)
- Taille_Source photonic ==> FAIT - DISTANCE Hexa_ech - Photonic = 43 cm
LSF [V , H] = [135 , 52] um
LSF [V , H] = [136 , 53] um --> Taille ele [H , V] = [143 , 81] um
- Longueur e- ==> FAIT ~ 100 ps au debut, 200 ps end (fwhm) ==> 85 ps RMS
- Emitt_Linac (QuadScan Q1) - PAS fait, les mesures emittances sont chaque fois de l'ordre de 2-3 mm.mrad ...
- Puissance FPC ~ 85 kW
- Flux : I3+I4 ~ 15000 - 18000 ==> 1.1 - 1.3 10^10 ph/s
=================================
09h09 HV is on
09h41 recipe_recipe_LI_TL_RI_all_20260311_13_12_06.txt loaded, linac steerers adjusted. Beam in the ring W/O RF, ring saved
09h49 RF 100 kV phase -42 dg. Charges around -100 pC, RF gun phase 172 dg., Sect. att. 2.4 dB , phase 224 dg. linac steerers: H [-0.2 -2.72], V [-2.54 3.14]
|
|
1214
|
Wed Mar 18 07:58:19 2026 |
KD, VM, MJ, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2026 | | 8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme : Mesure spectre et monochromateur à 61.5MeV (70MeV si le temps le permet)
61.5 MeV
09h35 HV is on
photocathod laser phase 62 dg. The receipt 61p5MeV_20250703_12_56_55.txt loaded, going to 61.5 MeV (interlocks)
10h13 Beam is on TL/SST02. Sect. att. 0.992 dB, sect. phase 236 dg.
10h30 Aligned with QP1 - QP3, linac steerers: H [-0.2 -3.02], V [-2.55 3.22]
11h05 Beam is in the ring W/O RF with all ring correctors set to zero
RF 100 kV storage is good, but can't correct the orbit at 61.5 MeV : le faisceau est presque hors du tube ==> Try to go to 70 MeV
70 MeV
13h20 RF processing the section on 25 pps by increasing pulse length from 1 us to 3 us
13h56 70 MeV, Linac steerers H [0.21 -3.75], V [-2.84 3.33], sect. att 0.18, phase 255 dg. laser phase 56 dg. (On the base of 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt)
16h17 recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt saved, screenshots, RF 100 kV, phase -36 dg., Freq. 500.031645 MHz
L'orbite n'est pas la meme que pour 50 MeV ==> Checks spectres dromadaires a V+40
X_fpc = -1.5 / -1.3 / -1.7 / -1.9 / -1.1 mais on a oublie d'ajuster la phase a chaque fois .... meme phase (3.0 V)
X_fpc = -0.9 / -0.7 / -0.4 / -0.2 / -0.5 en ajustant la phase a chaque fois
Cf les 2 screenshots "Spectre 70 MeV"
On se place a X_fpc = -1 mm (pas top mais dans l'urgence on se met la)
Fente2 centrees a l'oeil : [H , V] = [11 , -23]
Prise de spectres a +/- 10 en H et V (a voir ce que ca donne offline)
17h56 ThomX was stopped |
| Attachment 1: Screenshot_from_2026-03-18_17-43-17.png
|  |
| Attachment 2: Screenshot_from_2026-03-18_17-32-49.png
|  |
| Attachment 3: Screenshot_from_2026-03-18_17-32-38.png
|  |
| Attachment 4: Screenshot_from_2026-03-18_16-11-25.png
|  |
| Attachment 5: Orbite_2026-03-18_16-10-25.png
|  |
| Attachment 6: Screenshot_from_2026-03-18_17-45-25.png
|  |
| Attachment 7: spectres_70_MeV.png
|  |
| Attachment 8: spectres_70_MeV_2.png
|  |
|
Draft
|
Tue Mar 24 08:10:35 2026 |
KD, VM, MJ, RC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 24 mars 2026 | | 8h05 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
09h17 HV is ON
11h36 Mod. on standby
13h16: Mod Trig
13h40: Mod Standby impossible de locker la cavite CFP. ==> arret du shift ==> Hayg prend la machine
|
| Attachment 1: HorOrbit_vs_Att.png
|  |
|
1220
|
Fri Mar 27 07:41:15 2026 |
MJ KD IC VM DN RC | Fixed | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
ENERGY-ANGLE 70 MeV - 27 mars 2026 | | ** Programme : Energy-Angle 70 MeV
7h40 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
==> 70 MeV. F=500.031645 MHz
recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted
11h42 Laser Phase 53.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.177 dB, I_Gun -91.5849 pC, I_Linac -135.8848 pC, I_TL -118.0054 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.
Orbite IP differente de 70 MeV semaine derniere
12h30 Iryna vient en sdc pour retablir l'orbite IP de reference
15h44 Laser Phase 41.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.122 dB, I_Gun -90.9101 pC, I_Linac -134.7212 pC, I_TL -115.0435 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
17h23 Laser Phase 42.3 dg., Sect. Phase 256 dg., Sect. Att. 0.176 dB, I_Gun -89.6772 pC, I_Linac -133.3612 pC, I_TL -113.6226 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
** On-axis a l'oeil
** Check dromadaires
Pas tres bon ==> Deplacement Horiz table FPC de -1.6 a -1.9 ==> On ne trouve rien de tres bon ... On se place a -1.9 mm (cf screenshot droma_70MeV)
** Prise de spectres autour de -20/20 en H et V
** Long paquet : ~ 83 ps FWHM ==> 35 ps RMS
** Mesure taille de source X :
LSF [V , H] = [137 , 51] (image 1000ms0004) ==> e- [H , V] = [190 , 74]
LSF [V , H] = [142 , 50] (image 1000ms0005) e- [H , V] = [204 , 71]
LSF [V , H] = [136 , 53] (image 700ms0003) e- [H , V] = [187 , 81]
LSF [V , H] = [141 , 52] (image 700ms0002) e- [H , V] = [201 , 78]
LSF [V , H] = [137 ,56 ] (image 400ms0007) e- [H , V] = [190 , 93]
LSF [V , H] = [137 , 56] (image 400ms0006) e- [H , V] = [190 , 93]
** ENERGY-ANGLE prise de donnees (scan de spectres +40/-30 Horiz - +40/-40 Vert)
22h30: Stop ThomX, spectrum for 70MeV acquired |
| Attachment 1: droma_70_MeV.png
|  |
|
Draft
|
Tue Mar 31 07:56:57 2026 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 31 mars 2026 | | 7h55 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
==> vérifier la pression SF6 avant de commencer. 2461mB
HV On
10h05 Laser Phase 29.2269 dg., Sect. Phase 256 dg., Sect. Att. 0.15 dB, I_Gun -107.4324 pC, I_Linac -149.9747 pC, I_TL -133.2527 pC RF_Ampl. 99.1569 kV, RF_Phase -60.51 dg.
15h39 ==> 61.5 MeV, F=500.034945 MHz, Sect Att. 1.00 dB, phase 240. dg.
6h03 Laser Phase 27.2 dg., Sect. Phase 240 dg., Sect. Att. 0.981 dB, I_Gun -110.9555 pC, I_Linac -155.372 pC, I_TL -135.7899 pC RF_Ampl. 99.1184 kV, RF_Phase -47.91 dg.
17h54 ThomX was sopped
|
|
1223
|
Wed Apr 1 07:45:03 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
1e avril 2026 - Scan Energy-Angle 61.5 MeV | | 7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
==> SF6 à remplir avant démarrage. 2.805 bar
09h04 HV is ON
11h34 Laser Phase 91.1 dg., Sect. Phase 244 dg., Sect. Att. 0.937 dB, I_Gun -93.1422 pC, I_Linac -136.692 pC, I_TL -117.2003 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.
16h09 Laser Phase 93.1 dg., Sect. Phase 244 dg., Sect. Att. 1.027 dB, I_Gun -98.4828 pC, I_Linac -140.6614 pC, I_TL -121.8007 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.
** Recherche meilleur point d'interaction
Mouvement horiz table FPC + orbite e- differentes
Prise spectres a V +40
==> rien de concluant
On se place a Y_fpc = -1.7 mm - Orbite electron cf screenshot - Faisceau a peu pres centre dans le tube X
** Scan spectre ENERGY-ANGLE 61.5 MeV
Fente2 centrees [Hpos Vpos] = [-13 , -14]
Fin de shift 19h45 |
| Attachment 1: orbite_61p5_MeV_2026-04-01_19-24-56.png
|  |
|
51
|
Thu Jul 15 12:39:56 2021 |
Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021 | Reference Solution | Info | Opt | Linac Commissionning |
|
Alignement PhotoCathode | | L'alignement de la PhotoCatode est fini. Il est a noter :
- La position de la camera a ete ajuste pour mieux coller a la distance entre PhotoCathode et miroir de prelevement (pour la cathode virtuelle). Cette distance est d'environ 215.5 cm.
- le tube a vide d'entre du laser dans le linac a ete retire pour s assurer de l alignement du laser sur le miroir sous vide. Le faisceau est centre en transverse et legerement au dessus de l horizontal en vertical (<3/4 du miroir environ)
- L'image de reference de l'alignement Photocathode est en piece jointe. Le faisceau est centre sur la camera.
- les alignement ont ete revu au niveau de la table de la casemate pour reduire le vignetage
- L'energie UV en sortie du laser etait de 140uJ environ.
Point a faire et a surveiller :
- Il faut remettre le tube d'injection et passer sous vide
- Il faut mesurer la puissance laser sur la table optique dans la casemate
- le shutter de securite semble disfonction en mode local. Il y a une repercution sur le PSS (defaut a aquitter)
- L'attenuateur ne semble pas tourner.
|
| Attachment 1: Image__2021-07-15__12-34-45_PCVirtuelle.bmp
|
|