HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 10 of 63  Not logged in ThomX    logo
Entry   ND, Marie Labat; Streak camera 20250211_173802.jpg20250211_174708.jpg
Entry   ND, Manon Philit, Janine Issa; Shift summary 25/10 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngscan_2024_10_25_16_36.pngscan_2024_10_25_16_41.pngscan_2024_10_25_16_51.png
Entry   ND, MEK; Conditionnement section condj1.pdf
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   ND, LS; ThomX operations 26/6 
Entry   ND, IC, VK, VM, ME; Shift 8/12 14x
Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x
Entry   ND, IC, VK, VM; Prise de donnee 6/01 9x
Entry   ND, IC, VK, VM; Optimisation LE scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
Entry   ND, Camille Cheney, Mohamed ; Prise de donnees 16/12 9x
Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png
Entry   ND, Anna K, Elene K; Data taking 26/01 7x
Entry   ND, AM, VC, ML, SC; Programme faisceau 15/9 2022-09-15_scan_charge_phase.png
Entry   ND VC; Shift summary 
ELOG V3.1.4-395e101