  933   Fri Oct 4 08:31:27 2024 vc, VM,VK, ICUnder ProcessShift summaryLinac Commissionning Shift summary 

démarrage chauffage 8h30
9h45 demarrage faisceau

12h Ring studies

RF Cavity on. Turns off afre 1 min by it elf reduces power to  0

Several times press start - RF Cavity OK

Orbit correction.

Dispersion measurements.

Stable storage.

slooooow computer

 

18.05 End shift.

 

 

 


 

 

 

  1015   Wed Feb 19 17:32:30 2025 shift screw Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Rustine pour le probleme CEM kicker - ring storage - Xrays 

Cable ventilo kicker debranche ==> aucun effet
Cable balise blinde ==> la balise redevient calme

Redemarrage

Stockage dans l'anneau (recette je ne sais pas laquelle) -  Recherche synchro X ==> screenshot

* Fin de journee, pour la 3eme fois la communication avec l'ampli laser FPC fortement perturbee .....
* Probleme sur la voie 4 pico 3 (2diodes detector) ==> sceenshot

  1017   Fri Feb 21 08:30:30 2025 shift crewUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 21 février 2025 

8h30 : démarrage machine en remote (modulateur, laser, chiller/frigo, cyclage)

Nouveau pb : variation du flux X lente
incomprehensible car cavite lockee et electrons stockes.

Le faisceau se deplace sur le dectris X_hutch lorsque le flux varie

Tests chqngement leger de frequence RF cavity :

  • ** Avant 15h : 500.10045 MHz
  • ** 15h : 500.1003 MHz ==> variation est devenue tres reguliere ...
  • ** 15h26 : 500.100 MHz  ==> idem, tres reguliere

Pas le meme comportement a 500.10045 MHz compare a 500.1003  et 500.100

On veut revenir a 500.10045
Miss triggers, puis juste apres plus de synchro du tout pour toute la machine !

Appel Vincent. Ronic teste la carte. Rien ne semble defectueux - Sur le gene 33 MHz, juste le fait d'appuyer sur le bouton ch1 ==> probleme resolu !

16h30 : Redemarrage faisceau

Retour a 500.10045 - Toukours pareil (fluctuation flux X)

17h23 "integrateur FPC" ==> BINGO !!!

17h45 : Optimisation position verticale table FPC

18h45 Scan flux 27000 pico ==> screenshot

19h20 fin de shift

 

  939   Wed Oct 9 08:04:20 2024 shift teamUnder ProcessShift summaryLinac Commissionning Production de rayons X 

demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route 

 

Programme :

* injection faisceau dans l'anneau 

    Phase canon charge max (86°)
    Energie Max (36°) avec 100pC

     -  On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte

* Stockage puissance Laser

* Recherche des rayons-X en phase (500MHz, 33MHz)

      -  Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau

      - On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z

      - On essaye de synchroniser

Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V

Phase 33MHz 265°

Delay scope Laser/Trig : 1.25ns

On fait un scan vertical de la table en désynchronisé (impossible en synchrone)  

(~80 pC injecté et ~ 83kW dans la cavité)

* Mesure flux, stabilité spectre des rayons-X

Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)

 

Vers 18h :
   La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
   Idem TBT sum trend plus stable après.

 

  501   Fri Jul 8 09:06:19 2022 mo Shift summaryRF D1   

9h05 remplissage réseau eau, mise en route modulateur et frigo-chillers

pB modulateur! chauffage redemarre à 50% (scandinova est contacté) constatation Courant chauffage filament Klystron a baissé (touche la limite basse)

arret de la machine!

 

 

  449   Mon May 9 11:06:48 2022 maher Shift summaryLinac Commissionning   

Après discusion avec Victor, j'arrete le modulateur et chillers, peut-etre re-démarrage en milieu de l'aprem!

  635   Tue Nov 29 18:43:58 2022 cb/ hg/sc/jnc Shift summaryLinac Commissionning run du 29 nov 2022 

On teste le modèle MML avec un seul quad : QP1 par exemple

conditions :

  • Col -> 180A 
  • Alignement sur QP1 et QP3 : LI : STR1 H: -1.27  V : 0.35  TL_STR01 H : -4.30
  • Phase Qmax : 200°
  • Iris : 0.8
  • Att : 300

SigX = SigY = 0.23 mm  sans Qpole 

BetaX = 5.7   BetaY = 3.6  

EpsX = 1.1   EpsY = 1.40

Modèle concorde avec les mesures.  Soft matrice épaisse sans MML.

--> Mesures sont @ 18h44 dans mesure du jour

Maintenant essais sur QP3 : 

On retrouve les memes valeurs des émittances

EpsX = 1.1
EpsY = 1.3

Par contre pas les betas ...

BetaX = 3.96 et BetaY = 4.9

La reconstruction pour I=0 nous redonne les bonnes valeurs de taillle à l'écran. 

 

  777   Fri Jun 23 13:56:03 2023 all Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning X detectes aujourd'hui 

Aujourd'hui on a detecte des X en mode desynchro (notre signal correspond a ~ 3.10**6 ph/sec)

*** Pour :

- 100 pC stockee pendant 100 ms
- 30 kW dans la cavite
- mode desynch
- taille e- ~ 150 micons rms,
notre estimation du courant dans la p-diode det Fluo ligne X etait de ~ 25 pA
 
*** Trend de la p-diode ecran fluo ligneX en pj.
 
*** Tests realises pour etre surs :
On a delocke le laser : bruit laser ~ 20 pA sur notre pdiode
On a ferme puis ouvert le shutter e- laser locke : aucune difference de signal sur la p-diode (= aucun bruit venant du stockage des e-)
On a verifie qu'en bougeant "beaucoup" la table FPC en config shuter e- ferme, le signal du au laser FPC etait le meme
On a bouge la table en verticale et horizontal suffisamment pour identifier un maximum sur le signal.
 
Merci a tous et bon we
 
 
 
 
 
 
 

 

  799   Mon Oct 2 17:18:39 2023 Vincent-NicolasFixedOtherSY Mode de fonctionnement en place pour la synchro 

Nous avons déployé un déphaseur 500MHz vers la cavité Fabry Pérot (180° de phase)  ER/CA/RAC.05-API.AO1/AO6

Un déphaseur 33MHz est déployé sur le 33MHz ri  ER/CA/RAC.05-API.AO1/AO7

 

le systeme est revenu à un seul synthé coté Ring

le programme CPLD (sychro 500MHz OK) 33*41 1 coup /5 est chargé

le jitter entre les 500MHz Li et Ri est de l'ordre de 15ps sDev  (très grand pour cette configuration)

le jitter entre le 41.6MHz li et le 500MHz li est mesuré à 10ps sDev en entrée du chassis synchro (c'est beaucoup trop) ==> à vérifier

 

 

 

  659   Tue Jan 3 09:30:12 2023 Vincent Maher SophieFixedLinacLinac Commissionning Demarrage machine 

8h15

modulateur en local pas possible de démarrer à distance.

chauffages canon et section démarrés

9h30

arret chauffage => pB pression dans circuit refroidissement (pression à 0Bar)

Maher remet en pression (4 bars) il y a peu etre une fuite sous la pompe principale

9H45

demarrage modulateur à distance

demarrage chilliers et frigo

résistivité baie 16 5.6 MOhms

pression d'eau pompe en route 3.6Bars

 

ATTENTION: le vase d'expension a été changé (inspection de Jean Noel) la pression était à 0 Bar et la pompe a fonctionné toute la nuit!!!!!!

 

demarrage trigger klystron  => OK HT 1090

scan charge phase done

Charge max 236° 125pC

attention on observe un pic en fin de signal sur Pigun et PiLIL

arret à 12h

redemarrage 13H30

HT1090V

optimisation du laser sur la photocathode (position iris H4.59 V2.75)

Q max 135pC iris 1.3mm

attention relecture courant TL/PSDP.01 dans IHM powersupply ne se fait pas

16h

Arret machine: pB réseau d'eau: la vanne de remplissage du réseau est restée ouverte toute la journée ! la résistivité de l'eau est à 4.6MOhms on arrete les alimentations et la machine

 

 

 

 

 

 

 

 

 

  566   Mon Sep 26 16:30:56 2022 Vincent ChaumatUnder ProcessLinacLI | Linac Commissionning Mesure puissance Canon et section 

Mesure de la puissance dans la bouble (cristal + redpitaya)

mesure sur les 20 derniers points de l'impulsion RF

la variation de la mesure (en tension) est inférieure à 2mV peak to peak  ie  1% de la mesure

 

 

Mesure de la puissance incident section (cristal + redpitaya) (atténuateur guide -10dB)

 

mesure sur les 20 derniers points de l'impulsion RF

la variation de la mesure (en tension) est de  4mV peak to peak  ie  12% de la mesure

 

  1239   Mon May 11 09:33:17 2026 VincentUnder ProcessLinacLI | TL Manip Gplast 

9h30 test radioprotection OK (mesure en dessous du bruit de fond)

13h30 fenetre installée pompage en cours

14h fin de l'intervention

 

  1065   Tue May 6 11:38:24 2025 VS, AG, KDNew SolutionInfoLI | Laser | Opt | Linac Commissionning changement PhotoCathode icon4.gif 

lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)

- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)

- démontage et inspection du hublot et miroir de renvoie sous vide (démontage de l'ICT pour accéder au miroir de renvoie) :

      * le Hublot semble ok mais il est salle sur la face à l'air ==> nettoyage

      * le miroir de renvoie est piqué (impacts laser) de plus il est éclaté (casse du substrat sûrment dû à des arcages) ==> changement du miroir

          ** Impossibilité de le mettre sans réhausse en fasse arrière (clinquants).

          ** Les griffes de maintien sont mises plus fortement en appuis sur le miroir. 

          ** Contact électrique vérifié entre la face avant (dépôt argent) et le support.

 

 

mardi 6 : alignement laser sur la cathode trouée

- le faisceau est réaligné au centre de la cathode trouée. Nouvelle position de référence sur la caméra PhotoCathode [H,V] =  [5.55, 3.35]

- mesure de puissance laser Photocathode :

sortie Iris :

@1.3mm 20uJ

@3mm 57uJ

@7mm 93uJ

injection canon atténuateur @420pas :

@1.3mm 18uJ

@3mm 48uJ

@7mm 78uJ

sortie canon (sur la cathode Mg) atténuateur @420pas :

@1.3mm 14uJ

@3mm 40uJ

@7mm 63uJ

 

mercredi 7 mai : remise sous vide du canon (~12h), cathode installée depuis 16h la veille

- mesure/calibration atténuateur pour limiter l'énergie laser à 5-10uJ (pour débuter)

  Draft   Fri Jun 13 08:41:04 2025 VM,ICUnder ProcessShift summaryLinac Commissionning   

08h40 ThomX was started: Modulator, Frig, Laser

08h45 Chillers were started, cycling all magnets

09h56 HV is 'ON'

10h14 There is problem with Wavecatchers (see screenshot). Even dark current is absent

Wave catcher power supply 2 (5V) is dead... changed temporaly with a spare. (solved)

There is problem with the section phase shifter

12h10 All problem fixed, beam in the ring 50 MeV

Going to 40 MeV

13h25 Sect. Att. 4.03 dB, Phase 203 dg., RF Gun phase 166 dg. Charge -85 pC, receipt 20250613_13_25

Going to 43.7 MeV

14h20 Sect. Att. 3.5 dB, Phase 210 dg., Gun phase 162 dg  TL/BPM2 X=-1.5 mm, Receipt 20250613_14_19_57

16h00 35 MeV. Sect Att. 4.98 dB, phase 202 dg. Receipt for the linac 

16h10 HV  on standby Access to the bunker

  977   Tue Dec 10 11:35:16 2024 VM,HG,SCUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning 50 and 70 MeV Emittance, and transport  

Intervention chiller (Maher) : maintenance nécessaire à prévoir (clé outil clignote)

Problème de fermeture casemate : bouton rouge de la grille de sortie enfoncée

11h36 Démarrage faisceau

11h42 HV is 'On'

12h52 RF Gun phase is 154 dg.; Att. sect. is 0.176 dB; Sect. Phase is 244 dg. TL/BPM02 X=-4 mm; Charges 89; 93

Linac steerers: H [1.17 -3.35]; V [-2.26 2.18]

Emittance measurements at 70 MeV

15h10 Set to 50 MeV; Gun Phase is 154 dg., Sect. Att. is 2.62 dB; Receipt from 28/11/2024 17h51

16h10 : loaded good storage for x rays from recepies to check 50 MeV . From this setting lets check back alignment in quads from the quand alignment script.

Before alignment : AL1
Str01-H01 : 2.69
Str01-V01 : -2.14
Str01-H02 : -4.46
Str01-V02 : 2.32
After alignment: AL2
Str01-H01 : 2.89
Str01-V01 : -1.92
Str01-H02 : -4.44
Str01-V02 : 2.33
But : transmission (charge) : drop by 40%
Let's do soléno scan to check transmission : Quand alignment not very good for charge transmission, see attched plots.

Let's check alignment on the section for the 2 alignments. We change the section phase by 50° and see displacement (Yag and BPM). For this, Quads should be off.

 

Alignement : AL2

Phase start : 217
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 303.48206851 +/- 2.53475464631
YAG Y : 248.17574592 +/- 3.09361246552
------ YAG Max proj. Pixels -----
YAG X : 311.225 +/- 1.65056808402
YAG Y : 247.15 +/- 2.8332843133
------ BPMs en mm -----
BPM X : -0.280208425 +/- 0.0363865736831
BPM Y : 0.328087125 +/- 0.0522391011486

Phase end : 260
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 580.056498553 +/- 3.23802401848
YAG Y : 262.888974065 +/- 4.1652343396
------ YAG Max proj. Pixels -----
YAG X : 580.5 +/- 4.28368999812
YAG Y : 257.5 +/- 3.69459064038
------ BPMs en mm -----
BPM X : 4.87663125 +/- 0.0575652671525
BPM Y : 0.096524675 +/- 0.0720854637695

 

Alignement : AL1

-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 262.601980531 +/- 19.0243746195
YAG Y : 332.053127301 +/- 1.57943041905
------ YAG Max proj. Pixels -----
YAG X : 281.125 +/- 2.59987980491
YAG Y : 327.075 +/- 1.9797411447
------ BPMs en mm -----
BPM X : -0.97775805 +/- 0.0424827626514
BPM Y : -1.10375235 +/- 0.0278375257903

Phase end : 260

-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 488.638304627 +/- 2.94860256378
YAG Y : 369.841993906 +/- 2.4681240712
------ YAG Max proj. Pixels -----
YAG X : 492.675 +/- 2.89298721048
YAG Y : 371.25 +/- 3.34477204006
------ BPMs en mm -----
BPM X : 3.5390905 +/- 0.0500967083465
BPM Y : -1.860907325 +/- 0.0472255884105

 

some tries to enter the ring, by using same recipe than last friday. But someting changed, not possible to get back to the same storage. May be beam quality has changed from last run.
--> We need to find a set of observables to be checked to get back to the same beam quality for injection !

 

18h30 : Tchuss

 

 


 


 

 

 

 

 

 

  Draft   Thu Mar 13 08:29:34 2025 VM, VC, RC, ICUnder ProcessShift summaryRing Commissioning   

08h27 Start ThomX: Modulator, Laser, Frig

08h34 Chillers were started, cycling al magnets

12H ready to start beam ( 13H30)

alignement laser done (alignement to do)

13h20 HV is 'ON'

13h31 RF Gun phase is 95 dg. the laser iris is 1.3 mm, the laser att. 340, RF Gun charge is -120 pC (the laser spot position was Hor. 4.282 mm, Vert. 3.327 mm ), screenshots of Li/SST1

13h35 laser spot alighment started at RF gun phase of 145 dg.

13h36 New position of the laser spot is: Hor. 4.282 mm, Vert. 3.327 mm 

13h44 the modulator was put into standby mode, access to the bunker

14h13 HV is 'ON'

Two plots beam on LI STT 0.1

new receipe all 2025 03 13  14 46 52 

Charge 120pC

RF power 150KV

17h12 RF gun phase 92 dg., Sect. phase 211 dg. I TL DP =159.3 A, TL/BPM X=4 mm, RF cav. 150 kV, phase -15 dg. Sum of TBTSum =1.8e11, Charges: -142 pC,-140 pC, -152 pC, I3 25000 pA

17h31 Adjusting ring lattice to rise X rays. I3 max was 45000 pA

18h29 Stop thomX

 

 

 

 

  1028   Wed Mar 5 08:53:34 2025 VM, VC, RC, DNUnder ProcessShift summaryRing Commissioning   

08h53 Start ThomX

11h10 The oscilloscope installed in the bunker

11h11 HV is 'On'

11h45 The beam is in the ring

12h10 The modulator set to the Standby mode. Access to the bunker

12h24 HV is 'On'

12h30 RF Gun Phase is 15 dg., Sect. phase is 204 dg., Att. is 2.503 dB, TL/BPM2 X= 4 mm, Charges: -108 pC, -108 pC, -120 pC  

12h35 Feedback on linac injection was started

13h00 Measurement of the stability of the temporal position of electron and photon bunches at the IP. RF Cav. at 200 kV, Phase 35 dg.

13h07 The linac was adjusted: RF Gun phase 10 dg., Sect phase 199 dg. Charges: -100 pC,-99 pC, -110 pC, Inj. qual. 0.965, Storage qual. 0.802

14h26 The linac was adjusted: RF Gun phase 11 dg., Sect phase 203 dg. Charges: -99 pC,-99 pC, -109 pC, Inj. qual. 0.984, Storage qual. 0.747, X ray flux I3=25000 pA

Phase between electron beam and FP photon have been done (attachements will come later) (Electron beam is a pickup (150ps fall time) at the IP and Photon beam  is a photo diode (300ps rise time) at the FP cavity output).

time jitter is measured as the time difference between the two ulses at a fixed treshhold of 10mV)

measurements show a 33ps FWHM jitter (15ps)   as long as the FPC is locked on the 500MHz . the jitter mainly come from FPC (see post FPC : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/416)

15h35 The linac was adjusted: RF Gun phase 19 dg., Sect phase 212 dg. Charges: -105 pC,-104 pC, -115 pC, Inj. qual. 0.988, Storage qual. 0.786,

17h45 Stop ThomX

 

  Draft   Wed Jan 14 08:38:33 2026 VM, RC, MJ, ICUnder ProcessShift summaryLI | TL | LE | Ring Test Soleno=245, optic issue de la simu Julien Matching 

08h36 Warm-up ThomX: Modulator, Laser, Fridge
8h41 Chillers were started, cycling all magnets.
09h40  HV is ON

** 10h38 recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt loaded, RCDS on injection11h23 

RF 100 kV, Phase -4 dg. Manual 1179. RF gun phase 168 dg., Sect Att. 2.53 dg., Phase 214 dg., Charges (BPMs): -185, -177, -182, -181 pC, Linac steerers H [0.75 -2.95], V [-2.64 3.14] ,
MRSV FWHM about 50, sigma down to 22 pix
Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2)  - "Nominal ring QUADs"

** 11h36 Set charge to 100 pC, Laser Att. 329,  RF gun phase ==> 171 dg.

- Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2) - "Nominal ring QUADs"
- Scan vertical FPC (~11h50)
- Mesure Taille source fente 1 (images wiite beam + image fente source)

** 12h21 recipe_recipe_LI_TL_RI_all_20260109_14_44_42.txt loaded, then receipts for the linac and the transfer line recipe_recipe_TL_all_20260114_12_20_00.txtrecipe_recipe_LI_TL_straight_all_20260114_12_19_54.txt

RCDS on injection. Sometimes MRSV FWHM ==>40 and less. 
- 13h51 : Acquisition d'un SPECTRE "on-axis a l'oeil" (Hm3_Vm10p2)  - "NOT nominal ring QUADs"
- 14h : Scan FPC

** 14h55 : Discussion Marie/Iryna/Viktor ==>  Retour a la recette "nominal ring QUADs" (recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt)
PUIS, a 15h10 : recipe_recipe_LI_TL_RI_all_20260114_12_31_30.txt reloaded  ....  Pourquoi ? je ne sais pas ... Je ne l'ai su qu'a 16h30, donc :

  • Tous les spectres_vs_position_CdTe mesures ensuite (necessaires pour retrouver la divergence e-) sont acquis en fait avec "NOT nominal ring QUADs" au lieu de  de la recette SOL_245 isuue de la simu Julien (recipe_recipe_LI_TL_RI_all_Sol245_20260113_17_50_09.txt)
  • Mesure Taille source fente 1 (15h14-15h18)

** 17h30 : recherche de la cause "spectres dromadaires"

  • Visualisation de tout le tube ==> rien dans le trajet du faisceau
  • Spectre en desynchro toute fentes ouvertes : meme effet dromadaire
  • Mouvements HORIZONTAUX de la cavite FP et/ou Phase : Variations claires de la forme du dromadaire (spectres pris pour pos Horiz FPC -1.8, -1.3 -2.3 mm)  ==> Effet dromadaire sans doute lie au faisceau d'e- qui est courbe entre les 2 dipoles (==> 2 interactions ?) . Effet a quantifier/simuler, puis, si ca se confirme, il faudra trouver une solution pour que l'IP soit absolument sur la tangeante de la courbure des e-

18h05 Stop ThomX

 

  1058   Thu Apr 17 08:16:04 2025 VM, RC, DN, NDUnder ProcessShift summaryRing Commissioning   

08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow

Allarm vacuum valve are in alarm

RAC.17-RDP.01 still faulty

09h38 HV is 'ON'

10:15 Calc DS for attenuators was crashed. It restarted at 0dB attenuation...

12:43 SR on target with Iris closed

Alignemnt...

17:30 Measurement of the bunch length in the ring  ~140ps

  Draft   Tue Jan 20 08:35:56 2026 VM, ND, VCUnder ProcessShift summary    

08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.

09h40 HV is ON

10h12 The receipt loaded: recipe_recipe_LI_TL_RI_all_20260116_14_22_26.txt. Beam is in the ring W/O RF

RF gun phase 40 dg., Sect. Att. 2.556 dB, Sect. phase 207 dg., Linac steerers: H [0.58 -2.83], V [-2.48 2.94],  charges (BPMs):  -125, -119, -121, -122, -119 PC, the laser att.  359

10h38 RF 100 kV, phase -4 dg., manual phase shifter was adjusted.

10h54 RI_C1 Quads were stoped to chec dispersion at injection

13h00 Triggers stoped, after that was fixed the laser phase jumped to 202 dg. sect. phase 206 dg. 

15h39 Mod. standby

17h20 HV is on

18h01 Stop ThomX