Message ID: 790     Entry time: Thu Aug 10 15:52:24 2023
 Author: VK, VM, IC, LS 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Work on the new ring lattice (August, 2-4) 
 Icon:  

Starting point nominal lattice D1Thomx_017_064_r56_02_chro00 with the MCF=0.014  chro=0/0

Goal: test the new lattice with MCF=0.0231  chro=0/0 which alows to decrease the RF frequesncy down to 500.25 MHz. This will make possible operation witht eh FPC.

Total charge measured by the ICT was 60-70 pC. It was not possible to increase it with the attenuator. 

Start working with the new laser spot position on the photocathod (after previous shift by linac group). This also includes the different solenoid alignment and laser positorn feedback setting. We came back to our usual settings.

Work started witht he nominal optics at 500.32 - 500.33 MHz. Correction the orbit and minimization of the synchrotron oscillations. Check the tunes. Observations: it is not possible to reduce considerably the synch. oscilations due to some jitter from injecton to injecton. We do not know whether it is the energy or phase jitter, to be investigated. From orbit measurements w/o RF, we see that that std of the hor. orbit (injection by injection) at BPM3 (high D region) is about 0.26 mm. With the D ~ 1m => dp/p = 0.026 %. It is kind of compatible with the injector energy jitter seen at TL BPM2 : 1 mm correspods to ~0.1% dp/p. It would be good to have some information about the phase stability beetween the ring trigger and the laser. As the result of such jitter, it is difficult to find the proper E and phase and so, correct closed orbit.

RF freq = 500.25 MHz. Dispersive orbit is obtained. Optimization of the injection and storage. No betatron oscillation, should be investigated. A good storage is obtained, which could be further optimezed. 

Work on the BBA. The algorythm does not work correctly with the current TbT orbit. The jitters are quite large in order to detect the orbit change due to quadrupoles/correctors change. Under investigations. 

Measurement of the emittance. The proper/full quadrupole calibration was worked out B(I) from -12 to 12 A. The emittance was measured at 210 A and 220 A. At 220 A from the data taken, the vertical emiitance can not be estimated (gives the imaginary numbers). See the ppt attached.

Suggestion: commission the MRSV to be able to visualize the beam in the ring and set-up fully the EL to be able to measure the chrage and beam images.

End of August: take another data for emittance and study BBA.

Attachment 1: betatron_osc_03082023.png  379 kB  Uploaded Fri Aug 11 15:11:32 2023  | Hide | Hide all | Show all
betatron_osc_03082023.png
Attachment 2: betatron_osc_orbit_03082023.png  357 kB  Uploaded Fri Aug 11 15:11:32 2023  | Show | Hide all | Show all
Attachment 3: mean_orbits_03082023.png  342 kB  Uploaded Fri Aug 11 15:11:32 2023  | Hide | Hide all | Show all
mean_orbits_03082023.png
Attachment 4: stored_charge_03082023.png  192 kB  Uploaded Fri Aug 11 15:11:32 2023  | Hide | Hide all | Show all
stored_charge_03082023.png
Attachment 5: synch_osc_03082023.png  4.414 MB  Uploaded Fri Aug 11 15:11:32 2023  | Hide | Hide all | Show all
synch_osc_03082023.png
Attachment 6: synch_oscSTD_03082023.png  311 kB  Uploaded Fri Aug 11 15:11:32 2023  | Hide | Hide all | Show all
synch_oscSTD_03082023.png
Attachment 7: scan_charge_phase_min_0.0_max_360.0_12_37_5.png  50 kB  Uploaded Fri Aug 11 15:12:39 2023  | Hide | Hide all | Show all
scan_charge_phase_min_0.0_max_360.0_12_37_5.png
Attachment 8: Screenshot_from_2023-08-04_13-20-03.png  526 kB  Uploaded Fri Aug 11 15:13:16 2023  | Show | Hide all | Show all
Attachment 9: Screenshot_from_2023-08-04_13-22-17.png  609 kB  Uploaded Fri Aug 11 15:13:25 2023  | Hide | Hide all | Show all
Screenshot_from_2023-08-04_13-22-17.png
Attachment 10: Screenshot_from_2023-08-04_13-26-41.png  1.199 MB  Uploaded Fri Aug 11 15:13:46 2023  | Hide | Hide all | Show all
Screenshot_from_2023-08-04_13-26-41.png
Attachment 11: Screenshot_from_2023-08-04_13-33-00.png  907 kB  Uploaded Fri Aug 11 15:14:01 2023  | Hide | Hide all | Show all
Screenshot_from_2023-08-04_13-33-00.png
Attachment 12: Screenshot_from_2023-08-04_13-30-04.png  507 kB  Uploaded Fri Aug 11 15:14:15 2023  | Hide | Hide all | Show all
Screenshot_from_2023-08-04_13-30-04.png
Attachment 13: Emittance_Measurements_04082023.pptx  175 kB  Uploaded Mon Aug 14 18:06:44 2023
ELOG V3.1.4-395e101