HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups., Page 3 of 3  Not logged in ELOG logo
    Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
    Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
Entry   Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities 
    Reply   Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities 
Entry   Smaract Controllers setting, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics Origami_OneFive_33MHz_laser_SmarAct_controllers_cabling.pdf
Entry   New valves cabling, posted by Ronic Chiche at Optical room about mechanics | vacuum 
Entry   New valve cabling and 30Hz noise PZT, posted by Loïc Amoudry at Optical room about lasers and optics | vacuum Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png
Entry   new circuit breaker for the UPS, posted by Ronic Chiche at Optical room about cabling 
Entry   Edge installation, posted by Ronic Chiche at Optical room about mechanics | vacuum 
Entry   Operations before moving the optical table, posted by Ronic Chiche at Optical room about mechanics | vacuum | utilities 
ELOG V3.1.4-395e101