    Reply   Pressure On mirror Chambers, posted by Manar Amer at ThomX igloo about vacuum 21102021_vacuum_pressure_on_mirrorsChambers_9h30.jpg
At 9h30 in the morning, the pressure on the mirror chambers is:


on the left                
   :  1.6*10^-9 mbar
on the right (sortie X)  :  6.5*10^-9 mbar


    Reply   Pressure On mirror Chambers Leckage Test, posted by Manar Amer at ThomX igloo about vacuum 21102021_vacuum_pressure_on_mirrorsChambers_16h30.jpg21102121_MassSpectrometerOpticalCav.png
Leakage test done in the afternoon.

The method :


an atomic mass spectrometer is connected to the mirror chamber and a measurement is taken to see all the atoms and molecules in the chamber
after
Entry   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum PressureOverTime.png
A plot showing the descend of the vacuum in the mirror chambers (data to plot it obtained yesterday evening)

The regions where there is a drastic decrease is when the ionic pump was turned on.

Today in the morning the pressure was
    Reply   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum 
During the weekend 23-24th of October, the lab and ThomX suffered a power breakdown.
All the pumping systems had to restart.

as a consequence, the pressure on Monday 25th morning was 4.3e-9 and 4.6e-9 mbar in the left and right vessels.
    Reply   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum 
Pressure is 1.4e-9 and 2.6e-9 mbar this morning.




Manar
Amer wrote:



During the weekend 23-24th of October, the lab and ThomX suffered a
Entry   Iris Mounts on Cavity Windows, posted by Manar Amer at ThomX igloo about utilities Iris_Mounts_On_Windows.jpgP1_Injection_Mirror_Window_Iris_Mount.jpgInkedS3_Mirror_Window_Outside_LI.jpg
In order to find the Alignment of the ThomX cavity, Yann built mounts that could be placed directly on the windows outside the cavity, where we can place
an iris at the center.

The center of the iris on the mount corresponds to the center of the mirror.
    Reply   Iris Mounts on Cavity Windows, posted by Manar Amer at ThomX igloo about utilities Iris_Mounts_On_small_Windows.pngIris_Mounts_Fixed_On_small_Windows.png
The new iris mounts fixed on the small cavity windows.

Need additional 2 irises.




Manar
Entry   One Five laser moved , posted by Manar Amer at ThomX igloo about lasers and optics 
The One Five laser and its controller have been moved from PLIC to ThomX Iglo.

In preparation to Install the Amplifier from Alphanov
Entry   Alphanov amplifier chiller instruction manual , posted by Manar Amer at ThomX igloo about utilities HEC-OM-U015-B.pdf
Adding the instructions manual for the Alphanov Amplifier SMC Chiller

Installation and Maintenance Manual
Entry   New valve cabling and 30Hz noise PZT, posted by Loïc Amoudry at Optical room about lasers and optics | vacuum Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png
The Pneumatic valves are still coming back to "close" position.
Now the air bottle is always "open" to keep the valves "open".

The 30Hz noise is still here. We tried to cut off all the air flows. It only decreased the noise intensity but didn't change its shape.