UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling
+
UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling
+
Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities
+
Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities
Smaract Controllers setting, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics
New valves cabling, posted by Ronic Chiche at Optical room about mechanics | vacuum
New valve cabling and 30Hz noise PZT, posted by Loïc Amoudry at Optical room about lasers and optics | vacuum
new circuit breaker for the UPS, posted by Ronic Chiche at Optical room about cabling
Edge installation, posted by Ronic Chiche at Optical room about mechanics | vacuum
Operations before moving the optical table, posted by Ronic Chiche at Optical room about mechanics | vacuum | utilities