  Status of installation, including shipping and de-installation of test setups., Page 3 of 3  Not logged in ELOG logo
   +  Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
   +  Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
Entry   Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities 
   +  Reply   Chiller of the new laser amplifier , posted by Ronic Chiche at Optical room about utilities 
Entry   Smaract Controllers setting, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics Origami_OneFive_33MHz_laser_SmarAct_controllers_cabling.pdf
Entry   New valves cabling, posted by Ronic Chiche at Optical room about mechanics | vacuum 
Entry   New valve cabling and 30Hz noise PZT, posted by Loïc Amoudry at Optical room about lasers and optics | vacuum Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png
Entry   new circuit breaker for the UPS, posted by Ronic Chiche at Optical room about cabling 
Entry   Edge installation, posted by Ronic Chiche at Optical room about mechanics | vacuum 
Entry   Operations before moving the optical table, posted by Ronic Chiche at Optical room about mechanics | vacuum | utilities 