52
|
Wed Dec 20 12:59:00 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | I was able to lock back the FP-cavity.
at one moment, during the alignment
optmization process of the infection mirrors |
|
|
51
|
Wed Dec 20 10:17:19 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | finally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS |
|
|
50
|
Wed Dec 20 09:35:36 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | Jean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker |
|
|
49
|
Wed Jul 5 16:50:50 2023 |
Ronic Chiche | Fixed | issue | utilities | ThomX igloo | Airflow power breakdown | since around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on. |
|
|
48
|
Wed Feb 8 13:48:33 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | after finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location |
|
|
47
|
Wed Feb 8 11:02:38 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | If one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the |
|
|
46
|
Thu Jan 5 10:16:38 2023 |
Manar Amer | Fixed | info | utilities | ThomX igloo | Alphanov amplifier chiller instruction manual | Adding the instructions manual for the
Alphanov Amplifier SMC Chiller
|
|
|
45
|
Thu Aug 25 16:43:01 2022 |
Ronic Chiche | Fixed | info | detectors and electronics | software | ThomX igloo | Scope and Desktop computer removing | this afternoon, because of the test on
the electron beam drive in the ring in the
next days, |
|
|
44
|
Fri Mar 11 12:24:34 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | This morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning. |
|
|
43
|
Wed Mar 9 10:51:59 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter. |
 |
|
42
|
Tue Mar 8 12:40:00 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on |
|
|
41
|
Thu Feb 10 15:08:41 2022 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | shutter base plate, L-shape arm and housing frame | This afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the |
|
|
40
|
Thu Feb 10 09:41:54 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | Power supplies switched off | This afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies. |
|
|
39
|
Wed Jan 19 18:32:47 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | new power supplies connexions | this afternoon with Viktor, we redid all
the power supplies connexions.
4x cables are now connected to |
|
|
38
|
Tue Jan 11 10:32:45 2022 |
Manar Amer | Fixed | report | lasers and optics | ThomX igloo | One Five laser moved | The One Five laser and
its controller have been moved from PLIC
to ThomX Iglo. |
|
|
37
|
Fri Nov 19 16:33:29 2021 |
Manar Amer | Fixed | report | utilities | ThomX igloo | Iris Mounts on Cavity Windows | The new iris mounts fixed on the small
cavity windows.
Need additional 2 irises. |
 |
|
36
|
Tue Nov 16 15:23:22 2021 |
Manar Amer | Fixed | report | utilities | ThomX igloo | Iris Mounts on Cavity Windows | In order to find the Alignment of the ThomX
cavity, Yann built mounts that could be placed
directly on the windows outside the cavity, |
  |
|
35
|
Mon Nov 8 14:50:45 2021 |
Ronic Chiche | Fixed | info | vacuum | ThomX igloo | Opening of the FP cavity valves | On Friday the 5th of November, ThomX suffered
again from a power breakdown.
all the pumping systems had to |
|
|
34
|
Thu Nov 4 12:42:38 2021 |
Ronic Chiche | Fixed | info | vacuum | ThomX igloo | Opening of the FP cavity valves | as the vacuum level was good enough, I
asked Eric Mistretta to open the 2 valves
of the FP cavity. |
|
|
33
|
Wed Oct 27 09:34:04 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Plot | Pressure is 1.4e-9 and 2.6e-9 mbar this
morning.
|
|