IDdown Date Author Status Type Category Location Title Text Attachments
  52   Wed Dec 20 12:59:00 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningI was able to lock back the FP-cavity.

at one moment, during the alignment
optmization process of the infection mirrors
  
  51   Wed Dec 20 10:17:19 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningfinally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS
  
  50   Wed Dec 20 09:35:36 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningJean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker
  
  49   Wed Jul 5 16:50:50 2023 Ronic ChicheFixedissueutilitiesThomX iglooAirflow power breakdownsince around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on.
  
  48   Wed Feb 8 13:48:33 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsafter finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location
  
  47   Wed Feb 8 11:02:38 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsIf one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the
 key_board.jpg 
  46   Thu Jan 5 10:16:38 2023 Manar AmerFixedinfoutilitiesThomX iglooAlphanov amplifier chiller instruction manual Adding the instructions manual for the
Alphanov Amplifier SMC Chiller

 HEC-OM-U015-B.pdf 
  45   Thu Aug 25 16:43:01 2022 Ronic ChicheFixedinfodetectors and electronics | softwareThomX iglooScope and Desktop computer removingthis afternoon, because of the test on
the electron beam drive in the ring in the
next days,
  
  44   Fri Mar 11 12:24:34 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlockThis morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning.
  
  43   Wed Mar 9 10:51:59 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter.
 IMG_20220309_093541.pngChiller_Sub-d15_pinout.jpg 
  42   Tue Mar 8 12:40:00 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on
  
  41   Thu Feb 10 15:08:41 2022 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooshutter base plate, L-shape arm and housing frameThis afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the
  
  40   Thu Feb 10 09:41:54 2022 Ronic ChicheFixedinfocablingThomX iglooPower supplies switched offThis afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies.
  
  39   Wed Jan 19 18:32:47 2022 Ronic ChicheFixedinfocablingThomX igloonew power supplies connexionsthis afternoon with Viktor, we redid all
the power supplies connexions.

4x cables are now connected to
  
  38   Tue Jan 11 10:32:45 2022 Manar AmerFixedreportlasers and opticsThomX iglooOne Five laser moved The One Five laser and
its controller have been moved from PLIC
to ThomX Iglo.
  
  37   Fri Nov 19 16:33:29 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsThe new iris mounts fixed on the small
cavity windows.

Need additional 2 irises.
 Iris_Mounts_On_small_Windows.pngIris_Mounts_Fixed_On_small_Windows.png 
  36   Tue Nov 16 15:23:22 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsIn order to find the Alignment of the ThomX
cavity, Yann built mounts that could be placed
directly on the windows outside the cavity,
 Iris_Mounts_On_Windows.jpgP1_Injection_Mirror_Window_Iris_Mount.jpgInkedS3_Mirror_Window_Outside_LI.jpg 
  35   Mon Nov 8 14:50:45 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesOn Friday the 5th of November, ThomX suffered
again from a power breakdown.

all the pumping systems had to
  
  34   Thu Nov 4 12:42:38 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesas the vacuum level was good enough, I
asked Eric Mistretta to open the 2 valves
of the FP cavity.
 IMG_20211104_112239.jpg 
  33   Wed Oct 27 09:34:04 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers PlotPressure is 1.4e-9 and 2.6e-9 mbar this
morning.

  