  Status of commissioning, report also here plots are reports., Page 6 of 24  Not logged in ELOG logo
ID Date Author Status Type Category Location Titledown Text Attachments
  39   Thu May 23 17:30:03 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomTransmission of Sapphire mirrorSee image.  Sapphire_transmission.PNG 
  232   Wed Aug 2 13:07:59 2023 Ronic ChicheNot Fixedissuedetectors and electronicsThomX iglooThomX ring injection kicker noise => USB communication issue with Alphanov amplifierseveral times already, when the electrons
ring injection kicker is running @10Hz, we
observed peaks at the same frequency on reflected
  
  67   Thu Oct 3 18:00:10 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomThomX amplifier M2The ThomX M2 has been measured between
1.5-1.6 for x and y
 Fit_matlab_M2.PNG 
  92   Tue Feb 18 12:24:00 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomThomX Locked with CVBGsThomX has been locked with a new telescope
while using compression CVBGs.
Coupling is ~50-55% and lock is stable.
 tek00001.pngtek0002CH1.isftek0002CH2.isftek0002CH3.isftek0002CH4.isf 
  271   Mon Oct 9 13:11:23 2023 Daniele NutarelliFixedinfolasers and opticsThomX iglooTests of pointing stability of the laser CFPLast monday with Victor we have cheked
the stability of de pointing of the laser
FP.
 IMG_20231003_155009_resized_20231009_103610100.jpgIMG_20231003_155458_resized_20231009_103610449.jpg 
  288   Thu Nov 23 12:26:26 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooTemperature control of the Laser length with the inside Peltier

bunker temperature @ 22.5°C

today, Sebastien Pitrel improved
  
  287   Thu Nov 23 12:25:07 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthas the CFP motors displacements induce
a cavity unlock, we try to change the cavity
length by changing the temperature of elment
  
  294   Tue Nov 28 18:38:16 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthseveral days ago, we installed a heating
cable around the output flange (close to
the X-hutch) of the FP-cavity vessel.
  
  297   Wed Nov 29 12:20:18 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthtoday, I removed one of the DC voltage
supply (as with 30V, we are already able
to 30°C on the heating cable).
  
  301   Thu Nov 30 15:53:10 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengththis afternoon, I started the heating cable after
the warm-up of the FP-cavity :

14h20 : start to fill 50kW
 Screenshot_2023-11-30_15-48-05.png 
  302   Mon Dec 4 10:45:50 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthlast friday, I locked the cavity and then,
switched ON the heating cable after waiting
the cavity reaches a steady state in frequency
 2023_12_01_temp_freq.png 
  304   Thu Dec 7 14:59:02 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthon last tuesday, I did a long-term measurement
of the frequency drift when the heating cable
is powered ON at 20V (2x 10V) @ t=0mn.
 untitled.png 
  306   Mon Dec 11 17:21:32 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthtoday with Fatematuj, we did a long-term
frequency drift measurement between the FP-cavity
loaded with 50kW and the RF reference frequency...
 frequency_drift.png 
  91   Fri Feb 14 18:02:37 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomTelescope for compressors and ThomXCVBGs telescope is done with w ~= 1mm. 

ThomX telescope is done with w
~= 2.3mm in x and y.
  
  445   Wed Jul 16 17:17:57 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooSuite tests stabilitéWe continue to find what gives high freq.
perturbation.

The laser starts at 92 KW it is
  
  160   Thu Oct 13 12:26:07 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentToday, after laser was modelocked, we checked
the power inside the fiber coming from the
Alphanov Strecher box.
  
  161   Mon Oct 17 13:58:08 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Viktor, we started the
alignment of the CVBG and fiber.

we did a better alignment of the
 Adjustment_SMS.pdf 
  162   Tue Oct 18 17:51:12 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentIn preparation for tomorrow morning, I
did a test with a 45° mount to have a
power pickup inside the injection box.
  
  163   Wed Oct 19 14:57:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we measured the
power at different points:
- direct measurement at the output
  
  164   Wed Oct 19 15:01:32 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Ronic, using a pickup
mirror, we measured the power in different
locations along the path of the stretcher
  