HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 6 of 24  Not logged in ELOG logo
Entry   Transmission of Sapphire mirror, posted by Loïc Amoudry at Optical room about lasers and optics Sapphire_transmission.PNG
Entry   ThomX ring injection kicker noise => USB communication issue with Alphanov amplifier, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
Entry   ThomX amplifier M2, posted by Loïc Amoudry at Optical room about lasers and optics Fit_matlab_M2.PNG
Entry   ThomX Locked with CVBGs, posted by Loïc Amoudry at Optical room about lasers and optics tek00001.pngtek0002CH1.isftek0002CH2.isftek0002CH3.isftek0002CH4.isf
Entry   Tests of pointing stability of the laser CFP, posted by Daniele Nutarelli at ThomX igloo about lasers and optics IMG_20231003_155009_resized_20231009_103610100.jpgIMG_20231003_155458_resized_20231009_103610449.jpg
Entry   Temperature control of the Laser length with the inside Peltier, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Entry   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics Screenshot_2023-11-30_15-48-05.png
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics 2023_12_01_temp_freq.png
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics untitled.png
    Reply   Temperature control of the FP-cavity length, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics frequency_drift.png
Entry   Telescope for compressors and ThomX, posted by Loïc Amoudry at Optical room about lasers and optics 
Entry   Suite tests stabilité, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Entry   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics Adjustment_SMS.pdf
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
ELOG V3.1.4-395e101