216
|
Tue Jun 6 01:12:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Today, I installed a power meter at the
transmission point of the 1st spherical mirror
, transmission 3 ppm (direct from cavity |
 |
|
215
|
Fri Jun 2 10:54:25 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Yesterday, with Ronic we locked ThomX cavity
on the second resonance
Laser : 33.36 MHz , Amplifier : |
13x |
|
214
|
Thu Jun 1 18:15:04 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | finding the right modulation/demodulation
PDH phase is very difficult on the main resonance
because the we get non stationnary signals |
|
|
213
|
Thu Jun 1 10:31:45 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | 33MHz oscillator + Alphanov amplifier lock | the last tries to lock the 33MHz + amplifier
to the 30k Finesse FP-cavity were unsuccessful.
during a laser Frep scan using |
|
|
212
|
Tue May 30 18:32:37 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | This morning, while trying Guillaume solution
of disconnecting the 24 V necessary to the
second and third stage and raise the threshold |
|
|
211
|
Mon May 22 16:07:12 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Today with Ronic and Daniele we attempted
to lock the cavity, but the alphanov amplifier
did not turn on because of an error in MMD3 |
 |
|
210
|
Wed Apr 19 16:41:46 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Added Note: the coupling we get is at low
power, only preamplifier is on (~ 300 mW)
was done at the end due to excitation |
|
|
209
|
Wed Apr 19 16:39:28 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity |
On Monday with Daniele,
we
did full characterization of amplifier beam
@ 10% amplification, adjusted the telescope |
   |
|
208
|
Thu Apr 13 17:48:49 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | PW laser Injection into cavity | Yesterday,
we installed the second
high power reflecting mirrors at the output |
|
|
207
|
Tue Apr 11 16:58:16 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | FP Finesse measurement using CW | This morning, with Ronic and Daniele, we
locked the cavity again (The lock was relatively
easy and stable during the reading of the |
  |
|
206
|
Fri Apr 7 15:56:40 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | This morning with Daniele and Viktor,
- we confirmed the "potato"
mode was well centered on the injected beam |
|
|
205
|
Fri Apr 7 00:26:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??) |
  |
|
204
|
Tue Apr 4 13:03:23 2023 |
Manar Amer | Fixed | report | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Cavity Alighnment | Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed |
 |
|
203
|
Tue Mar 28 13:56:52 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Alighnment | Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)
we have also installed |
9x |
|
202
|
Mon Mar 20 17:55:25 2023 |
Ronic Chiche | Fixed | report | lasers and optics | software | ThomX igloo | Alphanov amplifier beam profile measurement | due to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the |
|
|
201
|
Mon Mar 20 17:39:28 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | Today, I restarted all the equipements
:
Chiller |
|
|
200
|
Mon Mar 20 17:23:09 2023 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | 33MHz laser SN2439 back to Orsay | As the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep |
 |
|
199
|
Mon Mar 20 09:33:54 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Power shut down on Saturday the 18th | All the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th : |
|
|
198
|
Fri Mar 17 18:54:19 2023 |
Manar Amer | Fixed | report | lasers and optics | Optical room | New Mirrors from LMA _ Images | Today we tested a mirror from one patch
image is for the front face of
the mirror |
   |
|
197
|
Wed Mar 15 21:14:51 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Amplifier Beam Profile over time | Information about today's work is added
to logBook !!
|
|