  424   Tue May 6 10:58:18 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerI finally got 93-94kW for 33% amp ratio.

I had to move the FP-cavity length
to compensate the temperature change in the
  
  423   Tue May 6 09:29:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX Bunkerafter the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C
 Sans_titre.png 
  422   Fri May 2 10:05:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerThe temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day.
 temp.png 
  421   Tue Apr 29 09:26:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations
  
  420   Mon Mar 31 18:19:30 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser
 20250331_181029.jpg 
  419   Mon Mar 31 17:12:56 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)...  insead of the 00
  
  418   Tue Mar 18 11:45:21 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able to store more than
95kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(2).jpg 
  417   Tue Mar 18 11:25:07 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio.
  
  416   Wed Mar 5 15:08:38 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementthe phase between the 500Mhz ring RF oscillator
and the electrons is measured on a BPM and
is very stable after 2-3ms (<< 6ps,
  
  415   Wed Mar 5 13:17:26 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementwe installed a measurement at the IP with
the BPM for ion cleaning for electrons and
we used a fast photodiode at the output of
 img1(1).jpg 
  414   Tue Mar 4 14:54:31 2025 Ronic ChicheFixedinfomechanics | softwareThomX iglooNew direction for cavity motorsfrom now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project.
  
  413   Fri Feb 21 19:52:57 2025 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareThomX iglooGood Xrays production trendthis afternoon, we succeeded to get a quite
long Xray production trend around 15-20 minutes
with a flux above 25k on i1.
 img1(1).jpg 
  412   Fri Feb 21 19:40:50 2025 Ronic ChicheFixedissuesoftwareThomX igloostrange drift (new effect !?!)today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz),
  
  411   Fri Feb 21 10:13:03 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzfor this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ?
  
  410   Thu Feb 20 12:36:19 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 94kW in the FP cavity,
always with the same parameter : 33% laser
 img1.jpg 
  409   Wed Feb 19 10:35:06 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition
 img1.jpgCapture.JPGCapture.JPGCapture.JPG 
  408   Wed Feb 19 09:28:12 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzlong term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator)
 Capture.JPG 
  407   Tue Feb 18 19:33:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW.
 Capture.JPG 
  406   Tue Feb 18 17:36:25 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the acquisition from 10:30am to
5:30pm

11k point in 7h => 1.57k points
 Capture.JPG 
  405   Tue Feb 18 10:40:55 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the pk-pk measurement of the accelerometer
during the whole night.
the recording started at 5pm yesterday
 Capture.JPG 