141
Fri Sep 2 17:50:21 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
removing the reading which is not correct
(wrong use of software)
redone a reading similar using
142
Fri Sep 2 18:10:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Note the
correct beam divergence is approximately
~ 2.3 mrad
143
Mon Sep 5 18:06:53 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Am adjustment on the lenses position to
have a smaller waist.
+ 250 mm @ 88 cm from amplifier
144
Tue Sep 6 17:47:40 2022
Ronic Chiche
Fixed
issue
lasers and optics
Optical room
unsuccessful telescope design :-(
we wanted to calculate the right telescope
with 2 spherical lenses.
1) we have the FP cavity mode size
145
Wed Sep 7 18:57:20 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
We increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or
146
Wed Sep 7 18:58:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
Today we managed to observe the fundamental
mode and stabilize the scan on it until we
improved the alignment enough.
147
Thu Sep 8 11:16:40 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
Today, we played on the CEP but using the
I-tune input of the Menhir Laser (+/- 5V
maximal range).
148
Thu Sep 8 13:39:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We played on the CEP using the USB command
"id0=xxxxx" of the Menhir.
we put id0=48650 and we improved
149
Thu Sep 8 14:58:51 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We managed to lock the cavity by adding
the AOM , but the lock is still difficult
to stabilize.
150
Thu Sep 8 18:28:51 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We wanted to increase the power of the
amplifier to measure the transmission output
at M2,
151
Fri Sep 9 11:50:17 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We locked the cavity, and it is stable
using the Transmission,
the high frequency that we thought
152
Fri Sep 9 12:45:19 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
image of the lock with Coupling of ~ 60%
153
Fri Sep 9 12:49:44 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
Alignment was improved to ~ 1.2 V on the
photodiode.
Only the second stage was on with
154
Fri Sep 9 14:44:35 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Power storage In Cavity
We start of power output from amplifier
of 1W with only the first and second stage
on then we start with the third stage power
155
Fri Sep 9 15:47:46 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Power storage In Cavity
At transmission power of 42 mW, coupling
60%, we see fundamental mode with a degeneracy
The D-shape motors were moved to
156
Fri Sep 9 18:35:07 2022
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
D-shape mirrors positionning status
This afternoon we opened the cavity and
put the D-shape mirrors at their correct
place, close to the beam.
157
Fri Sep 9 19:03:58 2022
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
D-shape mirrors positionning status
The cavity box is vacuum pumped at 6*10^-2
mbar.
158
Mon Sep 12 16:27:14 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Power storage In Cavity
Power increased in the amplifier
reflective filters added at the
transmission point to be able to have signal
159
Mon Sep 12 17:00:35 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Power storage In Cavity
at max stage we reached at 2.5
A on the diodes we have
8000 gain , coupling ~
160
Mon Sep 12 18:49:42 2022
Manar Amer
Fixed
issue
lasers and optics
Optical room
Damage on mirror surface
Following the storage of ~ 50 kW inside
the cavity and a sudden drop in transmitted
power from the cavity