  Status of commissioning, report also here plots are reports., Page 13 of 13  Not logged in ELOG logo
ID Date Author Status Type Category Locationdown Title Text Attachments
  242   Thu Sep 4 17:52:03 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurementToday, with Ronic, we measured the finesse
of the 2-mirror cavity witht the NKT CW laser.

We were able to perfrom the measurement
 Figure_3.png 
  243   Thu Sep 4 17:56:50 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurement(Finesse 2651 is consistent with that obtained
from the mirrors' transmission coefficients,
which is about 3100.)
  
  244   Tue Sep 9 21:23:11 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityYesterday, we changed the M1 mirror to
a 161185 Gamma
Factory mirror of transmission 460ppm, the
  
  245   Wed Sep 10 11:27:45 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityThe 2-mirrors cavity has 460ppm of transmission
for M1 and 10ppm for M2 which should exhibit
a Finesse around 13400.
 Finesse.png 
  246   Wed Aug 5 11:25:41 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationwe have all the adaptor plugs for connecting
the chiller.
so, I tested first the chiller connected
  
  247   Wed Aug 5 12:22:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I connected the chiller circuit to
the amplifier, thanks to the adapters.

chiller IN => blue pipe =>
  
  248   Wed Aug 5 13:49:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationpipes are maybe too long ?

we can use the Darcy-Weisbach +
Blasius laws (non linear laws).
  
  249   Thu Aug 6 14:49:32 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI drained the chiller to install again
the short pipe (< 1m) in closed loop.

then, I filled again the chiller
  
  250   Thu Aug 6 15:12:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I installed the long pipes (2x 3m)
in closed loop (without the amplifier connected),
but the exact ones used to connect the laser,
  
  251   Fri Aug 7 10:59:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI cut a small part of the black pipe on
the amplifier side (could it be slightly
deformed by a try with an other type of adapter
  
  252   Fri Aug 7 11:41:17 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationas soon as I connect the amplifier to the
pipes, the flow decreases to 1.7Lpm.

and the filling process is very
  