  Status of commissioning, report also here plots are reports., Page 5 of 13  Not logged in ELOG logo
ID Date Authordown Status Type Category Location Title Text Attachments
  224   Wed Oct 2 10:12:55 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this morning with Alice, we sent the Menhir
160MHz injected in a fiber (with 6mW at the
end of a long fiber) into the laser amplifier,
  
  225   Wed Oct 2 18:12:54 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this afternoon, we saw some electric cables
badly connected to their power supply.
we fixed it by soldering them together
 IMG20241002144351.jpgIMG20241002144936.jpg20241002_161657.jpgClipboard_10-02-2024_01.jpg 
  228   Tue Dec 3 13:51:52 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis morning with Alice and Daniele, we
removed all the optics elements and equipments
from the SBOX optical table and started to
 Oxydation.jpg20241203_113105.jpg20241203_125359.jpg 
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  230   Mon Dec 16 10:20:56 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair friday morning, we add a zoom call with
Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier
 Sans_titre.png 
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  232   Tue Mar 4 18:51:57 2025 Ronic ChicheUnder Processinfomechanics | lasers and opticsOptical roomAlignment of a 2-mirror FP cavitytoday with Alice,

- we measured the height of the
SBOX windows center : 140mm from the optical
  
  238   Mon Jun 23 14:38:33 2025 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsOptical roomfirst attempt to lockWith Alice, we installed the EOWaves oscillator
to be locked on the FP-cavity (T1 ~ 2500ppm,
T2 ~ 10ppm => F ~ 2500)
 20250623_123816.jpg20250623_123833.jpg20250623_123908.jpg 
  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiodeAfter installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low
  
  246   Wed Aug 5 11:25:41 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationwe have all the adaptor plugs for connecting
the chiller.
so, I tested first the chiller connected
  
  247   Wed Aug 5 12:22:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I connected the chiller circuit to
the amplifier, thanks to the adapters.

chiller IN => blue pipe =>
  
  248   Wed Aug 5 13:49:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationpipes are maybe too long ?

we can use the Darcy-Weisbach +
Blasius laws (non linear laws).
  
  249   Thu Aug 6 14:49:32 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI drained the chiller to install again
the short pipe (< 1m) in closed loop.

then, I filled again the chiller
  
  250   Thu Aug 6 15:12:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I installed the long pipes (2x 3m)
in closed loop (without the amplifier connected),
but the exact ones used to connect the laser,
  
  251   Fri Aug 7 10:59:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI cut a small part of the black pipe on
the amplifier side (could it be slightly
deformed by a try with an other type of adapter
  
  252   Fri Aug 7 11:41:17 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationas soon as I connect the amplifier to the
pipes, the flow decreases to 1.7Lpm.

and the filling process is very
  
  61   Tue Jan 5 12:38:04 2021 Manar AmerFixedreportlasers and opticsOptical roomTransmission Measurements for the Mirrors.
Thursday 10 December 2020:  
First Test Measurement - Inside Box

 The
transmission ( T ) for the mirrors of SBOX
 6x 
  64   Mon Jul 5 14:14:01 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise
We started measuring the phase
noise on the OEwaves CW laser.

Class
3b
wavelength 1.5 um


The
 20210207_OEwaves_laser.jpg20210207_Self_coupling_setup.jpgSchematic-setup-for-optical-delayed-self-coupling-detection.png 
  65   Mon Jul 5 14:40:57 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise a correction on the wavelength of the laser 
it is 1030 um 

  
  66   Mon Jul 5 14:46:44 2021 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomOEwaves CW Laser - Phase Noise correction on unit 1030 nm




  