  232   Tue Mar 4 18:51:57 2025 Ronic ChicheUnder Processinfomechanics | lasers and opticsOptical roomAlignment of a 2-mirror FP cavitytoday with Alice,

- we measured the height of the
SBOX windows center : 140mm from the optical
  
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  230   Mon Dec 16 10:20:56 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair friday morning, we add a zoom call with
Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier
 Sans_titre.png 
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  228   Tue Dec 3 13:51:52 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis morning with Alice and Daniele, we
removed all the optics elements and equipments
from the SBOX optical table and started to
 Oxydation.jpg20241203_113105.jpg20241203_125359.jpg 
  227   Fri Nov 29 16:50:04 2024 Alice RenauxUnder Processinfolasers and opticsOptical roomMenhir 216MHz laserThe Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator.
 spectre.xlsxspectre.png 
  226   Fri Nov 29 12:06:05 2024 Alice RenauxFixedinfolasers and opticsOptical roomMenhir 160MHz laserThe Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an
 spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png 
  225   Wed Oct 2 18:12:54 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this afternoon, we saw some electric cables
badly connected to their power supply.
we fixed it by soldering them together
 IMG20241002144351.jpgIMG20241002144936.jpg20241002_161657.jpgClipboard_10-02-2024_01.jpg 
  224   Wed Oct 2 10:12:55 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair this morning with Alice, we sent the Menhir
160MHz injected in a fiber (with 6mW at the
end of a long fiber) into the laser amplifier,
  
  223   Wed Jun 19 10:38:00 2024 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomD-shape mirrors positionning statussummary:

- the motors used to move the D-shape
are the Newport Picomotors 8303-V
  
  222   Fri May 17 15:02:01 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityHere's a summary of our experiment
last week:

The initial telescope position:
 6x 
  221   Thu May 16 18:51:17 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityhere is a Matlab code to try to optimize
the telescope for a hot cavity,
taking into account the thermal lens
 telescope_optimization_for_700kW.pdf2_Mirrors_-_216MHz_-_700kW_cavity_setup.xmlcavity_2M_dynamic_thermal_effect.m 
  220   Mon May 6 18:38:18 2024 Xinyi LuFixedinfolasers and opticsOptical roomhigh-power experiments of 2-mirror cavityToday, Ronic, Daniele and I redo the high-power
2-mirror cavity experiments, and the results
are shown in the table (Figure 1 and
 record_20240506.pngrecord20240506.xlsxScreenshot_2024-05-06_11_145855-500kW.pngScreenshot_2024-05-06_1_112931-14kW.png 
  219   Thu Apr 25 22:12:25 2024 Xinyi LuFixedinfolasers and opticsOptical room2 mirror cavity high power experimentsToday, Ronic and I recorded some intracavity
power and cavity mode size as shown in Fig.
1.
 record_20240425.pngScreenshot_2024-04-25_4_155354-155kw.pngScreenshot_2024-04-25_1_154630-155kw.png60kW_highordermode2.jpg 
  218   Tue Apr 16 18:38:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomFiber injection, spectrum and connection of 2nd stage amplifierToday, Daniele and I injected the laser
into the fiber, installed the telescope,
connected the second stage of the amplifier,
 CVBG_inject_to_fiber.pngtelescope.png 
  217   Mon Apr 15 18:19:40 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement of 2-mirror cavity- Today Daniele and I cleaned the spherical
mirror by wiping it with alcohol,
and the finesse increased to 47k
 finesse_45k.png 
  216   Fri Apr 12 17:18:15 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall 2-mirror cavityToday Viktor and I completed the installation
of the two-mirror cavity and managed
to lock and measure the finesse.
 finesse_2mirror.pngScreenshot_2024-04-12_170357.pngScreenshot_2024-04-12_145025.png 
  215   Thu Apr 11 19:09:21 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall 2-mirror cavityToday, Viktor and I started installing
the two-mirror cavity.
- Firstly, we cleaned the environment
 2_mirror_setup.pngmirrors.png 
  214   Wed Apr 10 11:35:54 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement (35k)These days, Ronic, Aurélien
and I use OEwaves CW laser to measure the
finesse of SBOX. We made 5 measurements
 5_measurements_of_finesse.pngfit.png 
  213   Tue Apr 9 08:57:22 2024 Xinyi LuFixedinfolasers and opticsOptical roomDifferent cavity modes & Pulse widthAdditional information:

The pulse duration has been performed
in RF on a UPD-70-IR2-P photodiode from Alphalas
 t_cvbg.pngt_amp.png 