HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 10 of 13  Not logged in ELOG logo
ID Date Author Statusdown Type Category Location Title Text Attachments
  166   Fri Sep 16 15:56:45 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface a better image of the damaged spot, image
taken with the arrow for the reflective surface
facing the other direction (image shows position)
 M1_mirror_on_Microscope_stand0.jpgM1X_front_min_zoom.jpgM1X_front_max_zoom.jpgM1X_front_damaged_spot_max_zoom.jpg 
  167   Fri Sep 16 17:47:56 2022 Manar AmerFixedreportlasers and opticsOptical roomDamage on mirror surface ThomX injection mirror has been cleaned
and placed again inside the optical cavity.

This time to avoid the damaged
  
  168   Tue Sep 20 12:50:40 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot Yesterday , we locked the cavity and we
see a sign of a high finesse on the transmission
signal, but no measurement of Finesse was
 Screenshot_2022-09-19_2_172943.pngScreenshot_2022-09-19_1_171834.png00mode_LOCK.jpg00mode_LOCK_saturaed.jpg 
  169   Wed Sep 21 12:10:07 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot To compare between the 2 images of the
cavity mode:


the mode by itself has
  
  170   Mon Sep 26 16:15:06 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot On Wednesday 21st , I opened the cavity
did an additional 2 mm shift of the injection
mirror and put it under vacuum again.
 00mode_damaged_0_26ms.jpg00mode_damaged_saturted_50ms.jpgreflection_noLock.jpgreflection_Lock_0_15ms.jpg 
  171   Tue Sep 27 19:30:49 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 Gamma FactoryIn the morning, Vacuum broken and rotated
M1 ThomX 90 degrees clockwise, locked the
cavity in air and we observe a degeneracy
 00mode_ThomX_Mirror_degeneracySpot_1point04ms.jpg00mode_ThomX_Mirror_degeneracySpot_saturateat50.jpgCoupling_mirror_.jpeg 
  172   Wed Sep 28 18:43:51 2022 Manar AmerFixedreportlasers and opticsOptical roomM2 ThomX spherical Cleaning Today, M2 Spherical-3 from ThomX that was
installed inside the SBox was removed, there
was one big dust on the surface of the mirror,
 6x 
  173   Fri Jan 6 12:33:18 2023 Ronic ChicheFixedinfolasers and opticsOptical roomLaser Menhir reinstallation + CVBG + fiber injectionThe lab purchased the Menhir laser @ 216MHz.

it has been sent back to Menhir
photonics for inspection, and then is now
 MenhirJan2022.PNG 
  174   Thu Dec 7 09:09:27 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooNew mirrors batch informationsthe 2 files describe the specfications
for the 16 mirrors ordered (4 for ThomX +
spare, 4 for SBOX + spare) and the measurements
 miroirs_puma_2022_thomx_Kbox.docxMiroirs_à_1031_nm-ThomX_-_KBox_Mars_2023.pdfRecap_miroirs_KBOX_et_THOMX.xlsx 
  175   Thu Dec 7 09:30:03 2023 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareOptical roomnew setup for the 160MHz Menhir oscillatorfrom the begining of the week, Xinyi, Aurélien,
Viktor and myself started to install a new
setup for the Menhir 160MHz oscillator.
 Plan_SBOX_@_160MHz.pptxImplantation_disymmetric.mIMG_20210519_155329.jpg 
  176   Fri Dec 8 18:59:24 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the last two days, Viktor, Ronic and
I have started to install the mirror mounts
and try to align the cavity.
  
  177   Thu Dec 14 17:52:53 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignmentOver the past few days, Viktor, Ronic and
I have continued to align the cavity.
We installed 4 mirrors and monitored the
 CCD.jpgoscillograph.jpg 
  178   Wed Dec 20 10:45:37 2023 Xinyi LuFixedreportlasers and opticsOptical roomMounts installation and cavity alignment- Over the last few days, Viktor, Ronic
and I have reinstalled the mounts and realigned
the cavity with CW laser and old mirrors.
 resonances.jpgcavity_mode.jpgcavity_mode_diameter.jpg 
  179   Wed Jan 10 18:35:46 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- Recently we have focused on improving
the coupling efficiency. Without the telescope,
the original coupling efficiency was less
 Coupling_efficiency_0110.jpgdamaged_spot_on_M1.png 
  180   Mon Jan 15 19:19:00 2024 Xinyi LuFixedinfolasers and opticsOptical roomCoupling efficiency improvement- We got 30% coupling efficiency by installing
a set of telescopes, adjusting the polarization
and optimizing the alignment. The diameter
 coupling_efficiency.jpgcavity_locking.jpg 
  181   Tue Jan 16 18:42:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomFSR and Finesse measurement- Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed
 Screenshot_2024-01-16_2_145546.pngScreenshot_2024-01-16_4_150258.png 
  182   Wed Jan 17 21:11:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsToday, Ronic and I installed the new mirrors
and got resonance. We can see the oscillations
in this high-finesse case. We haven't
 New_mirrors.pngoscillations.jpglocking.jpg 
  183   Thu Jan 18 22:14:03 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- In the last two days, Ronic and I installed
new mirrors after cleaning the environment,
and locked the cavity.
 New_mirrors.pngfinesse.pnglocking.jpg 
  184   Mon Jan 22 18:18:01 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrors- Today, Ronic and I changed the signal
generator to a low-noise one (with a delay
time of only 0.5 us). Then we moved
 New_finesse.png 
  185   Wed Jan 24 20:33:27 2024 Xinyi LuFixedinfolasers and opticsOptical roomInstall new mirrorsYesterday we checked the mirrors with
UV light and there was some dust on the mirrors,
especially M2.
 M2.jpg 