  Status of commissioning, report also here plots are reports., Page 1 of 13  Not logged in ELOG logo
IDdown Date Author Status Type Category Location Title Text Attachments
  245   Wed Sep 10 11:27:45 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityThe 2-mirrors cavity has 460ppm of transmission
for M1 and 10ppm for M2 which should exhibit
a Finesse around 13400.
 Finesse.png 
  244   Tue Sep 9 21:23:11 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomnew cavityYesterday, we changed the M1 mirror to
a 161185 Gamma
Factory mirror of transmission 460ppm, the
  
  243   Thu Sep 4 17:56:50 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurement(Finesse 2651 is consistent with that obtained
from the mirrors' transmission coefficients,
which is about 3100.)
  
  242   Thu Sep 4 17:52:03 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurementToday, with Ronic, we measured the finesse
of the 2-mirror cavity witht the NKT CW laser.

We were able to perfrom the measurement
 Figure_3.png 
  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiodeAfter installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low
  
  240   Wed Sep 3 18:10:34 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomSuccessful lock (finally !)Today, with Ronic, we managed to get a
successful lock with the NKT laser by setting
up a new PDH box from scratch (photodiode
 IMG_20250903_113758.jpg 
  239   Thu Aug 28 15:29:00 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity lockingIn June, we encountered some problems regarding
the transmission and error signals (see images
here),
 Figure_1.pngFigure_2.png 
  238   Mon Jun 23 14:38:33 2025 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsOptical roomfirst attempt to lockWith Alice, we installed the EOWaves oscillator
to be locked on the FP-cavity (T1 ~ 2500ppm,
T2 ~ 10ppm => F ~ 2500)
 20250623_123816.jpg20250623_123833.jpg20250623_123908.jpg 
  237   Fri Jun 13 20:10:00 2025 Alice RenauxFixedreportlasers and opticsOptical roomDamaged mirrors testToday with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating
  
  236   Wed May 28 18:27:27 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity full setupToday with Ronic, we changed the FP cavity's
mirrors to Layertek (Gamma Factory) mirrors
:
  
  235   Wed May 28 10:55:15 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity alignmentThe NKT laser PZT sensitivity is ~0.09pm/V
of wavelength variation, which is equivalent
to ~ 25MHz/V
 Sans_titre.jpg 
  234   Tue May 27 18:12:22 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity alignmentYesterday and today, I replaced the OEWaves
CW laser with the NKT CW laser. Its screen
does not display anything, so it has to be
 IMG20250527160111.jpg 
  233   Fri Mar 21 18:27:36 2025 Alice RenauxUnder Processreportmechanics | lasers and opticsOptical room2-mirror cavity alignmentAt the beginning of the week, I installed
a half-wave plate, a beamsplitter cube and
a quarter-wave plate, as well as the end-of-cavity
 2-mirror_cavity_alignment.zip 
  232   Tue Mar 4 18:51:57 2025 Ronic ChicheUnder Processinfomechanics | lasers and opticsOptical roomAlignment of a 2-mirror FP cavitytoday with Alice,

- we measured the height of the
SBOX windows center : 140mm from the optical
  
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  230   Mon Dec 16 10:20:56 2024 Ronic ChicheUnder Processissuelasers and opticsOptical roomCELIA 100W laser amplifier repair friday morning, we add a zoom call with
Jerome Lhermite about the amplifier repair.
he approximately confirmed the amplifier
 Sans_titre.png 
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  228   Tue Dec 3 13:51:52 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis morning with Alice and Daniele, we
removed all the optics elements and equipments
from the SBOX optical table and started to
 Oxydation.jpg20241203_113105.jpg20241203_125359.jpg 
  227   Fri Nov 29 16:50:04 2024 Alice RenauxUnder Processinfolasers and opticsOptical roomMenhir 216MHz laserThe Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator.
 spectre.xlsxspectre.png 
  226   Fri Nov 29 12:06:05 2024 Alice RenauxFixedinfolasers and opticsOptical roomMenhir 160MHz laserThe Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an
 spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png 