Status of commissioning, report also here plots are reports., Page 5 of 5
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
89 Entries
Goto page
Previous
1
,
2
,
3
,
4
, 5
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
9
Thu Apr 29 06:14:09 2021
Manar Amer
Fixed
report
lasers and optics
Other
Mode observed and cavity Lock
** Following up from yesterday an observation
about the TM00 mode : it has been seen with
similar dimensions and its position is the
8
Tue Apr 27 13:57:15 2021
Manar Amer
Fixed
report
lasers and optics
Other
Alignment using Koheras
Following the Helium Neon Alignment + change
in the distance between the mirrors to be;
M3-M4 = 90.5 mm , M1-M2 = 80.2 mm -→
6x
7
Mon Apr 19 19:11:47 2021
Manar Amer
Fixed
report
mechanics | software
Other
Distances between mirrors
At the reference zero the
distance between the mirrors is (taken from
a reference presentation "status9nov2020"
6
Mon Apr 19 18:47:28 2021
Manar Amer
Fixed
report
lasers and optics
Other
Alignment using Helium Neon Laser
05 April 2021 : A rough alignment
of the cavity was done using the Helium Neon
Laser.
5
Mon Apr 19 18:41:03 2021
Manar Amer
Fixed
report
mechanics | cabling | software
Other
Setting up the Motors
A document attached that describes the
procedure needed to:
- connect the motors
4
Thu Apr 15 19:54:19 2021
Manar Amer
Fixed
report
mechanics | cabling
Other
Mirrors Mottors Connections
Added the cabling to the categories
3
Thu Apr 15 19:45:08 2021
Manar Amer
Fixed
report
mechanics
Other
Mirrors Mottors Connections
* The connections to control the motors
of the mirrors are connected in the order
stated :
2
Tue Apr 6 09:25:47 2021
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Phase noise measurement of the Amplitude MIKAN
Coupling into a 50-50% fiber coupler using
the Thorlabs XYZ table NanoMax TS.
We reached 117mW after the 50% arm
1
Tue Mar 23 18:33:16 2021
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Phase noise measurement of the Amplitude MIKAN
Installation of the MIKAN.
powermeter (with OD1) just after the
oscillator shows 440mW for 4A of the MIKAN