ID Date Author Statusdown Type Category Location Title Text Attachments
  13   Wed Jun 30 20:26:38 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras CalibrationAfter installing cameras the actual calibration
are :

NF_Refl: acA1920-40gm
 NF_Refl_calib_hex2mm__2021-06-23__16-59-26.bmpNF_Trans_calib_hex2mm__2021-06-23__17-06-49.bmpNF_Inj_calib_DIODE__2021-06-24__10-56-00.bmpNF_Inj_calib_DIODE__2021-06-24__10-42-00.bmpNF_Trans__2021-06-25__16-38-56.bmp 
  15   Mon Sep 6 18:17:24 2021 Kevin DuprazUnder Processreportlasers and optics | detectors and electronicsOptical roomCavity lock and referencesCavity is lock and optimized with the NKT.
Input power is maximized (10mW).

Cavity mode is in attachement.
 NF_Trans_2021-09-06__17-49-00.bmp 
  22   Fri Sep 24 09:55:35 2021 Manar AmerUnder Processreportlasers and opticsOptical roomReflection Line Polarization MeasuremetWith the help of Ronic the cavity was locked
in preparation to measure the polarization
of the reflection line when the cavity is
 Reflection_line.jpg 
  44   Mon Dec 6 11:22:08 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras Calibration 




 grab2021-12-06_10-51-34_325_microscope.bmpgrab2021-12-06_10-52-11_108_microscope_calib_05mm_ruler.bmp 
  45   Tue Dec 7 11:48:33 2021 Kevin DuprazUnder Processinfolasers and optics | detectors and electronicsOptical roomCameras CalibrationAfter check a mistake has been found on
the magnification. This seems to be the good
calibration (feel free to cross check). The
 Plot_of_NF_Trans_calib_hex2mm__2021-06-23__17-06-49.pngPlot_of_NF_Refl_calib_hex2mm__2021-06-23__16-59-26.png 
  46   Fri Dec 10 16:57:56 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 10 12 2021 (optimization injection Burst)Manip 10/12/2021
Après recherche de la résonnance
principale
 NF_Refl__2021-12-10__14-25-08.pngtest__2021-12-10__14-25-08_1920_25gm.png 
  47   Tue Dec 14 12:59:07 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Matin :

moteurs :
M1, M2 (plans): 5.110500m
 Screenshot_2021-12-14_2_125459.png 
  48   Thu Dec 16 10:40:55 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 14 12 2021 injection optimization (and calibration)Après-midi :
    * Optimisation
de l'alignement en injection pour avoir
 Screenshot_2021-12-14_3_182645.png 
  49   Thu Dec 16 12:12:10 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissanceMatin: 
* Redémarrage Tangor 4W
    - couplage 15%
 Screenshot_2021-12-16_0_115846.png 
  50   Thu Dec 16 12:13:52 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 16 12 2021 montée en puissance 




 Screenshot_2021-12-16_1_121553.png 
  51   Thu Dec 16 18:16:12 2021 BlancUnder Processinfolasers and opticsOptical roomChangements et ajout d'optiquesOptiques ajoutées :

- splitter 90/10 au début
de la voie de réflexion, pour éjecter
  
  52   Fri Dec 17 17:03:34 2021 Kevin DuprazUnder Processreportlasers and opticsOptical roomManip 17 12 2021 reprise réf nouvelle injection pour polarisationTangor : 4.2W
* Réalignement de l'injection
suite aux modifications :
 Screenshot_2021-12-17_0_164132.pngScreenshot_2021-12-17_1_170202.png 
  55   Thu May 19 10:04:05 2022 BlancUnder Processreportlasers and opticsOptical roomChangement cadence et duty cycle + ref cam- Prise des nouvelles ref caméras
: NF{709;371} , FF{389;280} [Image 1 &
2]
 Ref_NF_inj_18_05_2022.pngRef_FF_inj_18_05_2022.pngScreenshot_2022-05-18_2_165654.pngScreenshot_2022-05-18_5_173440.pngScreenshot_2022-05-18_6_174947.png 
  56   Tue Jun 14 11:16:37 2022 BlancUnder Processissuelasers and opticsOptical roomProblèmes CavitéePrécédentes ref pour lesquelles
la manip fonctionnait :

Caméras :
 Transmission.PNGNF_inj.PNGFF_inj.PNG 
  1   Tue Mar 23 18:33:16 2021 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomPhase noise measurement of the Amplitude MIKANInstallation of the MIKAN.
powermeter (with OD1) just after the
oscillator shows 440mW for 4A of the MIKAN
  
  2   Tue Apr 6 09:25:47 2021 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomPhase noise measurement of the Amplitude MIKANCoupling into a 50-50% fiber coupler using
the Thorlabs XYZ table NanoMax TS.
We reached 117mW after the 50% arm
  
  3   Thu Apr 15 19:45:08 2021 Manar AmerFixedreportmechanicsOtherMirrors Mottors Connections * The connections to control the motors
of the mirrors are connected in the order
stated :
 20210804_Motor_connections_with_mirrors_inside_cavity_box.jpg20210804_Mottor_cables_behind_cavity_box.jpg 
  4   Thu Apr 15 19:54:19 2021 Manar AmerFixedreportmechanics | cablingOtherMirrors Mottors Connections Added the cabling to the categories 




  
  5   Mon Apr 19 18:41:03 2021 Manar AmerFixedreportmechanics | cabling | softwareOtherSetting up the MotorsA document attached that describes the
procedure needed to:

- connect the motors
 setting_up_the_motors.docx 
  6   Mon Apr 19 18:47:28 2021 Manar AmerFixedreportlasers and opticsOtherAlignment using Helium Neon Laser 05 April  2021 :  A rough alignment
of the cavity was done using the Helium Neon
Laser.
 20210202__Helium_Neon_laser_parameters.jpg 