13
Wed Jun 30 20:26:38 2021
Kevin Dupraz
Under Process
info
lasers and optics | detectors and electronics
Optical room
Cameras Calibration
After installing cameras the actual calibration
are :
NF_Refl: acA1920-40gm
15
Mon Sep 6 18:17:24 2021
Kevin Dupraz
Under Process
report
lasers and optics | detectors and electronics
Optical room
Cavity lock and references
Cavity is lock and optimized with the NKT.
Input power is maximized (10mW).
Cavity mode is in attachement.
22
Fri Sep 24 09:55:35 2021
Manar Amer
Under Process
report
lasers and optics
Optical room
Reflection Line Polarization Measuremet
With the help of Ronic the cavity was locked
in preparation to measure the polarization
of the reflection line when the cavity is
44
Mon Dec 6 11:22:08 2021
Kevin Dupraz
Under Process
info
lasers and optics | detectors and electronics
Optical room
Cameras Calibration
45
Tue Dec 7 11:48:33 2021
Kevin Dupraz
Under Process
info
lasers and optics | detectors and electronics
Optical room
Cameras Calibration
After check a mistake has been found on
the magnification. This seems to be the good
calibration (feel free to cross check). The
46
Fri Dec 10 16:57:56 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 10 12 2021 (optimization injection Burst)
Manip 10/12/2021
Après recherche de la résonnance
principale
47
Tue Dec 14 12:59:07 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 14 12 2021 injection optimization (and calibration)
Matin :
moteurs :
M1, M2 (plans): 5.110500m
48
Thu Dec 16 10:40:55 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 14 12 2021 injection optimization (and calibration)
Après-midi :
* Optimisation
de l'alignement en injection pour avoir
49
Thu Dec 16 12:12:10 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 16 12 2021 montée en puissance
Matin:
* Redémarrage Tangor 4W
- couplage 15%
50
Thu Dec 16 12:13:52 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 16 12 2021 montée en puissance
51
Thu Dec 16 18:16:12 2021
Blanc
Under Process
info
lasers and optics
Optical room
Changements et ajout d'optiques
Optiques ajoutées :
- splitter 90/10 au début
de la voie de réflexion, pour éjecter
52
Fri Dec 17 17:03:34 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 17 12 2021 reprise réf nouvelle injection pour polarisation
Tangor : 4.2W
* Réalignement de l'injection
suite aux modifications :
55
Thu May 19 10:04:05 2022
Blanc
Under Process
report
lasers and optics
Optical room
Changement cadence et duty cycle + ref cam
- Prise des nouvelles ref caméras
: NF{709;371} , FF{389;280} [Image 1 &
2]
56
Tue Jun 14 11:16:37 2022
Blanc
Under Process
issue
lasers and optics
Optical room
Problèmes Cavitée
Précédentes ref pour lesquelles
la manip fonctionnait :
Caméras :
1
Tue Mar 23 18:33:16 2021
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Phase noise measurement of the Amplitude MIKAN
Installation of the MIKAN.
powermeter (with OD1) just after the
oscillator shows 440mW for 4A of the MIKAN
2
Tue Apr 6 09:25:47 2021
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Phase noise measurement of the Amplitude MIKAN
Coupling into a 50-50% fiber coupler using
the Thorlabs XYZ table NanoMax TS.
We reached 117mW after the 50% arm
3
Thu Apr 15 19:45:08 2021
Manar Amer
Fixed
report
mechanics
Other
Mirrors Mottors Connections
* The connections to control the motors
of the mirrors are connected in the order
stated :
4
Thu Apr 15 19:54:19 2021
Manar Amer
Fixed
report
mechanics | cabling
Other
Mirrors Mottors Connections
Added the cabling to the categories
5
Mon Apr 19 18:41:03 2021
Manar Amer
Fixed
report
mechanics | cabling | software
Other
Setting up the Motors
A document attached that describes the
procedure needed to:
- connect the motors
6
Mon Apr 19 18:47:28 2021
Manar Amer
Fixed
report
lasers and optics
Other
Alignment using Helium Neon Laser
05 April 2021 : A rough alignment
of the cavity was done using the Helium Neon
Laser.